Permit Information
Permit NumberBLD97-03469
StatusFinaled
Name BOISE AIR TERMINAL
Site Address 3150 AIRPORT WAY
Project NameBOI CANOPY
Customer Number 
ePlanReviewNo
Description
BOISE AIR TERMINAL *2110 s.f. CANOPY IN PARKING LOT COVERING PEDESTRIAN WALKWAY. 14'x 150', located 20 feet from the entrance to the parking garage. All steel construction on concrete pier foundations. DR#7996 CU#3896 PC#746-97 ads
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  6/5/1998 PASS
Letter of Compliance #15065 issued 6-5-98.
INSP - Final6/4/19986/4/19986/4/1998PPASS
DetailsJim Storey
06/04/98 301 - FNL -OK FINAL
Code Occupancy Approval  5/8/1998 PASS
MET REQUIREMENTS TO DRH96-0079, SIGNED FINAL OCCUPANCY.
Print Occupancy Form  4/22/1998
90 day tracking............. 11/19/19972/17/1998
(F) Reprint permit  1/16/1998
Receive PAYMENT IN FULL PRINT  1/15/1998
619607159699516 je
Telephone call  1/15/1998
CALLED AND LEFT MESSAGE ON VOICE MAIL FOR KEN
Print Occupancy Form  1/12/1998
Inspection Record Card- Bld  1/12/1998
PLANS/APPL TAKEN TO FRONT DESK  1/12/1998 PASS
Plan assigned to (ADS)12/22/1997 1/9/1998 PASS
Details
Plan resubmittals received  1/9/1998
RECEIVED 2 COPIES STRUCTURAL CALCS. 2.COPIES ORIGINAL CALCS & "SK" SKETCHES 2 COPIES SHEETS A9.3 & E1.2 BOTH SHEETS ARE REVISED IN THEIR ENTIRETY. ( THE CONTRACTOR (CNI), PRICED OUT THE ORIG. SUBMITTAL & IT WAS TOO EXPENSIVE, THE AIRPORT REQUESTED THE CANOPOY & SCOPE BE REDUCED. GREG ALLEN. KMM ROUTED TO ARLAN SMITH
Routing - PLAN CHECK12/30/1997 1/9/1998 PASS
Received partial PAYMENT  1/7/1998
PAID JOURNAL ENTRY-301315032/619607159699516-$260.10- THIS IS FOR PLAN CHECK FEES DUE ONLY.MPS
Routing - FIRE12/24/1997 12/29/1997 PASS
Plan Reviewer's activity  12/23/1997 PEND
correction listed faxed to Hummel Architects
Plan assigned to (JCM)12/1/1997 12/22/1997 PASS
DetailsJohn Menard
Routing - ELECTRICAL12/9/1997 12/9/1997 PASS
NO REVIEW FIELD VERIFY.
Plan assigned to (RGG)11/21/1997 12/1/1997 PASS
Routing - PUBLIC WORKS11/26/1997 11/28/1997 PASS
Routing - PLANNING11/24/1997 11/25/1997 PASS
APPROVED BY TKW.
Routing - AIRPORT11/24/1997 11/24/1997 PASS
CONTACTED GREG ALLEN ON 11-24-97 TO TAKE PLANS OUT TO THE AIRPORT TO BE SIGNED OFF.
Plan assigned to (MYS)11/19/1997 11/21/1997
DetailsMarlene Southard
Plans ACCEPTED BY PLAN CHECK  11/21/1997 PASS
Plans ACCEPTED BY PLAN CHECK  11/21/1997 HOLD
waiting a site plan. contacted greg allen at ###-#### of this need SITE PLAN RECEIVED BY FAX 11-21-97 P.M.
Received Certificate of Value  11/21/1997 PASS
Application received  11/19/1997
Plan routing begun/NEW & ADDTN11/21/1997  
see action 007