INSP - Final | 10/7/1998 | 10/7/1998 | 10/7/1998 | | PASS |
Jim Storey
|
|
|
/ / 301 - archived final letter of completion from teracon.
|
Permanent Occupancy | | 10/6/1998 | 10/6/1998 | | DONE |
|
|
|
|
Permanent occupancy | | | 10/6/1998 | | PASS |
|
|
|
Perm. Occ. Cert. #7447 issued 10-6-98 to Air Cargo Facilities/UPS.
|
INSP-Final Inspection | 10/2/1998 | 10/2/1998 | 10/2/1998 | A | PASS |
Rick Jackson
|
|
|
occ approved
|
INSP - Final | 9/30/1998 | 10/1/1998 | 10/1/1998 | A | PART |
Jim Storey
|
|
|
10/01/98 301 - MATT ###-####-CALL 1ST ON FN INSP FNL -OK FINAL pending others by entry by 333.
|
INSP-Final Inspection | 9/29/1998 | 9/29/1998 | 9/30/1998 | P | |
Joe Tawney
|
|
|
matt- ###-#### fn fire insp -call 1st before insp
|
INSP-Final Inspection | 9/24/1998 | 9/25/1998 | 9/25/1998 | P | PART |
Rick Jackson
|
|
|
matt ###-#### temp occ approved - awaiting completion of alarm panel for TI (BLD98-2845)
|
Temporary occupancy | | | 9/25/1998 | | PASS |
|
|
|
Temp. Occ. Cert. #3699 issued 9-25-98 to the Air Cargo facility (shell & core).
|
INSP - Final | 9/23/1998 | 9/24/1998 | 9/24/1998 | P | PASS |
|
|
|
09/24/98 333 - final ok for perm
|
INSP-Final Inspection | 9/23/1998 | 9/24/1998 | 9/24/1998 | A | FAIL |
Joe Tawney
|
|
|
09/24/98 406 - MATT- ###-#### FN FIRE INSP FINAL FAIL ALARM SYSTEM SPKLR SYSTEM EXIT PATHWAYS
|
INSP - Final | 9/10/1998 | 9/11/1998 | 9/11/1998 | P | FAIL |
Jim Storey
|
|
|
09/11/98 301 - n/r fire call for insp when sign offs are done.
|
INSP-Sprinkler Rough-in/Hydro | 9/10/1998 | 9/11/1998 | 9/11/1998 | A | PART |
Joe Tawney
|
|
|
09/11/98 406 - randy ###-#### OK ON SPKLR HYDRO TEST
|
INSP - Framing/Rough-in | 9/4/1998 | 9/8/1998 | 9/9/1998 | A | PART |
Jim Storey
|
|
|
09/09/98 301 - MATT ###-#### SIZEMIC CORR-CORREC-CALL FOR REINSP WHEN COMPLETED ok to drop ceilling.
|
INSP - Framing/Rough-in | 9/8/1998 | 9/8/1998 | 9/8/1998 | | PART |
Jim Storey
|
|
|
09/08/98 301 - MATT ###-#### SIZEMIC CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
Code Occupancy Approval | | | 9/8/1998 | | PASS |
|
|
|
ALL PARKING AND LANDSCAPE IN PER PLANS, FINAL SIGNED OFF.
|
INSP - Framing/Rough-in | 9/4/1998 | 9/4/1998 | 9/4/1998 | | CANC |
Joe Tawney
|
|
|
09/04/98 406 - matt ###-#### sizemic CANCELLED STRUCTURAL INSP
|
Receive PAYMENT IN FULL PRINT | | | 8/31/1998 | | |
|
|
|
|
INSP-Conference | 8/6/1998 | 8/6/1998 | 8/6/1998 | P | PART |
Joe Tawney
|
|
|
08/06/98 406 - MATT ###-#### CONF ON SPKLR PROTECTION UNDER CONVEYERS OVER 4 FT WIDE
|
INSP - Framing/Rough-in | 8/4/1998 | 8/4/1998 | 8/4/1998 | A | PASS |
Jim Storey
|
|
|
08/04/98 301 - wall bracing c/n resolved ok for wall cover.
|
INSP - Framing/Rough-in | 7/29/1998 | 7/30/1998 | 7/30/1998 | A | NR |
Jim Storey
|
|
|
07/30/98 301 - matt ###-#### CORR-CORREC-CALL FOR REINSP WHEN COMPLETED ì
|
INSP - Framing/Rough-in | 7/27/1998 | 7/28/1998 | 7/28/1998 | A | PART |
Jim Storey
|
|
|
07/28/98 301 - framing air cargo steel frame. matt ###-#### CORR-CORREC-CALL FOR REINSP WHEN COMPLETED pend plum and ele
|
INSP-Supply line flush | 6/10/1998 | 6/11/1998 | 6/11/1998 | A | PART |
Joe Tawney
|
|
|
06/11/98 406 - ###-#### fire line flush said he already spoke to you abo OK ON UNDERGROUND FLUSH
|
INSP-Sprinkler Rough-in/Hydro | 6/11/1998 | 6/11/1998 | 6/11/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON UNDERGROUND HYDRO TEST
|
INSP - Foundation | 6/3/1998 | 6/3/1998 | 6/3/1998 | P | PART |
Jim Storey
|
|
|
06/03/98 301 - Matt ###-#### Masonry Wall placed w/special insp pending
|
INSP - Framing/Rough-in | 6/1/1998 | 6/1/1998 | 6/1/1998 | P | PART |
Jim Storey
|
|
|
06/01/98 301 - masorny/ ###-#### first cource ok
|
INSP - Framing/Rough-in | 5/14/1998 | 5/15/1998 | 5/15/1998 | A | FAIL |
Jim Storey
|
|
|
05/15/98 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED work n/r arch.
|
INSP - Foundation | 3/29/1999 | 4/23/1998 | 4/23/1998 | | PART |
|
|
|
conference with plumber on gw opk
|
INSP - Foundation | 4/13/1998 | 4/14/1998 | 4/14/1998 | A | PART |
Jim Storey
|
|
|
04/14/98 301 - C/N REQUIR SPECIAL INSP.SCOPE OF WORK. RESUBMITTAL OF FO
|
INSP - Foundation | 4/8/1998 | 4/8/1998 | 4/8/1998 | P | PART |
Jim Storey
|
|
|
04/08/98 301 - matt ###-####
|
Issue PAID IN FULL permit | | | 3/20/1998 | | |
|
|
|
|
Print Occupancy Form | | | 3/16/1998 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/16/1998 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 3/16/1998 | | |
|
|
|
|
Routing - PLAN CHECK | 3/3/1998 | | 3/13/1998 | | PASS |
|
|
|
PACKAGE #1
|
Routing Off Site - STRUCTURAL | 3/12/1998 | | 3/12/1998 | | PASS |
|
|
|
ISSUES RESOLVED BY PHONE. FAX FROM ATTWOOD-HINZMAN-JONES APPROVING STRUCTURAL SENT TO BLDG. DEPT. 3-12-98. MO
|
Plan resubmittals requested | | | 3/11/1998 | | FAIL |
|
|
|
CORRECTIONS FROM ATTWOOD-HINZMAN-JONES SENT TO ARCHITECT. MO.
|
Routing Off Site - STRUCTURAL | 3/2/1998 | | 3/10/1998 | | FAIL |
|
|
|
RESUBS SENT TO ATWOOD, HINZMAN, JONES. CORRECTIONS MAIELD AND FAXED TO ARCHITECT. MO
|
Plan resubmittals received | | | 3/3/1998 | | |
|
|
|
RECEIVED 1 COPY OF REVISED STRUCTURAL SHEETS S1.1 THRU S1.3. ROUTED TO MIKE OTTO
|
Routing Off Site - STRUCTURAL | 2/27/1998 | | 3/2/1998 | | PEND |
|
|
|
SENT PLANS TO ATWOOD, HINZMAN, JONES 2/27/98 DAR 3-02-98 PLANS FOR THE MANUFACTURED METAL BUILDING PORTION OF THE PROJECT HAVE PASSED. RESPONCES FOR THE CORRECTIONS OF 2-13-98 SENT THIS DATE TO ATT-HINZ -JONES. MO
|
90 day tracking............. | | 11/20/1997 | 2/18/1998 | | |
|
|
|
|
Plan resubmittals requested | | | 2/5/1998 | | FAIL |
|
|
|
STRUCTURAL REVIEW COMMENTS FAXED AND MAILED TO DAVE BLISS AT CSHQA. MO
|
Routing Off Site - A.C.H.D | 11/25/1997 | | 1/22/1998 | | PEND |
|
|
|
ACHD FEES CONTACTED D. BLISS TO TAKE PLANS OUT TO ACHD ACHD FEES NOT PAID.
|
Routing Off Site - STRUCTURAL | 1/12/1998 | | 1/20/1998 | | FAIL |
|
|
|
PACKAGE #3 AM HOLDING PACKAGE UNTIL PRE ENGINEERED BLDG. PLANS AND CALCS COME IN. I GAVE DAVE BLISS A COPY OF WHAT IS NEEDED FOR THE ENG. SET. 1-12-98 RECEIVED PRE-ENGINEERED METAL BLDG. SHOP DRAWINGS AM READY TO ROUTE TO ATWOOD, HINZMAN AND JONES. COMMENTS BACK FROM AHJ. RESUBS REQUIRED
|
Plans ACCEPTED BY PLAN CHECK | | | 1/12/1998 | | PASS |
|
|
|
SEE ACTION 007 PEND
|
Plan routing begun/NEW & ADDTN | | | 1/12/1998 | | PASS |
|
|
|
AM ROUTING PACKAGE #3 TO OUTSIDE ENG. ALL THREE PACKAGES ARE NOW ROUTING AS OF THIS TIME. KMM
|
Received partial PAYMENT | | | 1/7/1998 | | |
|
|
|
PLAN CHECK FEE ONLY FOR BOISE AIRPORT-301315032/619601699487-TRANSFER SHELLY BISS/JOURNAL ENTRY
|
Plan resubmittals requested | | | 12/22/1997 | | FAIL |
|
|
|
CORRECTIONS MAILED AND FAXED TO ARCHITECT. MO
|
Routing - PLAN CHECK | 12/16/1997 | | 12/22/1997 | | FAIL |
|
|
|
CORRECTIONS MAIELD AND FAXED TO ARCHITECT. MO
|
Routing - PLUMBING | 12/11/1997 | | 12/16/1997 | | PASS |
|
|
|
PACKAGE #1
|
Routing - PLANNING | 12/8/1997 | | 12/11/1997 | | PASS |
|
|
|
PACKAGE #1 APPROVED BY SRS.
|
Routing - PUBLIC WORKS | 11/25/1997 | | 12/5/1997 | | PASS |
|
|
|
PACKAGE #1 NEEDS TO GO TO AIRPORT BEFORE APPORVAL
|
Plan assigned to (MYS) | 11/20/1997 | | 12/1/1997 | | PASS |
Marlene Southard
|
|
|
|
Routing - AIRPORT | 11/28/1997 | | 11/28/1997 | | PASS |
|
|
|
CONTACTED DAVE BLISS TO TAKE PLANS OUT TO AIRPORT.
|
Plan routing begun/NEW & ADDTN | | | 11/25/1997 | | PEND |
|
|
|
AM ROUTING ACHD PACKAGE AND PACKAGE #1 (PW. PLUMB, ELEC., & P&Z)
|
Received Certificate of Value | | | 11/25/1997 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 11/21/1997 | | PEND |
|
|
|
CONTACTED DAVID BLISS AT ###-#### TO LET HIM KNOW 1. PLANS REQUIRE DRAINAGE CALCS. (RECEIVED 11-25-97 2. TWO SEPARATE SUBMITTALS (ONE SET) FOR ACHD ROUTING(RECEIVED 11-25-97) 3. ONE SUBMITTAL OF ONE FOR OUTSIDE ENGINEERING 4. PRE ENGINEERED BUILDING INFORMATION: PLANS AND CALCULATIONS I TOLD HIM PLANS WILL BE ON HOLD UNTIL THE ABOVE ITEMS ARE RECEIVED. (DAVE HAD SUBMITTED ONLY ONE SET ORIGINALLY) 11-25-97 RECEIVED DRAINAGE CALCS. RECEIVED ACHD SET PER MARLENE AM NOW ROUTING TO PW PLUMB ELEC, P&Z #1. ALSO ROUTING ACHD PACKAGE. OUTSIED ENGINEERING WILL BE SENT WHEN I RECEIVE PRE ENGINERRED INFO. 1-7-98 RECEIVED TWO COPIES OF PREENGINEERED METAL BUILDING ANCHOR BOLT/ERECTION DRAWINGS. HOWEVER THEY WERE NOT STAMPED OR SIGNED. THEY WERE ALSO STAMPED FOR APPROVAL ONLY. CONTACTED DAVE BLISS TO LET HIM KNOW THIS ISSUE MUST BE RESOLVED BEFORE ROUTING. I ALSO RECEIVED 2 COPIES OF DESIGN CALCULATIONS. KMM 1-12-98 RECEIVED 2 COPIES OF PRE-ENGINEERED METAL BLDG. SHOP DRAWINGS-STAMPED AND SIGNED. I CALLED DAVE TO ASK FOR ONE MORE COPY FOR PACKAGE #3 ( 1 COPY TO OUTSIDE ENG. AND 2 COPIES FOR PACKAGE #1) 1-13-98 RECEIVED LAST COPY OF PRE MANUFACTURED BLD PLANS AND GAVE TO MIKE O.
|
Application received | | | 11/20/1997 | | |
|
|
|
|
Plan assigned to (M_O) | 12/1/1997 | | 3/13/1997 | | PASS |
|
|
|
|
Routing - FIRE | 12/23/1997 | | 1/2/1997 | | PASS |
|
|
|
PACKAGE #1
|