Case Summary (BLD) | | | 3/22/2011 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 12/8/2010 | | |
|
|
|
|
Case Summary (BLD) | | | 11/18/2010 | | |
|
|
|
|
INSP - Framing/Rough-in | 3/26/1999 | 3/26/1999 | 3/26/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - NEED APPROVED PLAN W/ NOTES...CONF. ONLY W/ HAROLD, MGR.OK T
|
INSP - Framing/Rough-in | 3/10/1999 | 3/10/1999 | 3/10/1999 | P | FAIL |
Carl Dependahl
|
|
|
03/10/99 340 - NORALYN ###-#### FIRE SEAL ON DOORS need plans
|
INSP - Framing/Rough-in | 3/3/1999 | 3/3/1999 | 3/3/1999 | | NR |
Carl Dependahl
|
|
|
03/03/99 340 - need ul listed smoke seals
|
INSP - Final | 11/9/1998 | 11/9/1998 | 11/9/1998 | | PART |
|
|
|
10/29/98 338 - made k by 408
|
Permanent Occupancy | | 11/9/1998 | 11/9/1998 | | DONE |
|
|
|
|
INSP - Final | 11/4/1998 | 11/5/1998 | 11/5/1998 | A | PART |
Tom Arcoraci
|
|
|
11/05/98 408 - HERITAGE RETIREMENT CENTER\###-#### NORALYN ok for perm occ after code enforcement sign off
|
INSP - Final | 10/28/1998 | 10/28/1998 | 10/28/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP OK FOR PERM OCC OF DINING ROOM EXPANSION
|
INSP - Final | 10/20/1998 | 10/21/1998 | 10/22/1998 | P | NR |
|
|
|
10/21/98 338 - other agencies not approved
|
INSP-Final Inspection | 10/20/1998 | 10/21/1998 | 10/21/1998 | P | FAIL |
Joe Tawney
|
|
|
10/21/98 406 - FIRE SPRINKLER AND LIFE SAFETY FINAL FAIL ALARM SYSTEM TEST OF NEW DEVICES
|
INSP - Final | 10/19/1998 | 10/19/1998 | 10/19/1998 | | NR |
|
|
|
10/15/98 338 - other agencies not approved
|
INSP - Framing/Rough-in | 7/7/1998 | 7/8/1998 | 7/8/1998 | P | PART |
|
|
|
07/08/98 338 - harold ###-#### MOSTLY CONF ON THE PLACEMENT OF THE RATED
|
INSP - Concrete | 6/23/1998 | 6/24/1998 | 6/24/1998 | P | PASS |
|
|
|
06/24/98 333 - floor ok
|
INSP - Foundation | 6/19/1998 | 6/19/1998 | 6/19/1998 | P | PASS |
|
|
|
06/19/98 338 - made ok r-bar is placed ok to pour
|
INSP - Foundation | 6/17/1998 | 6/18/1998 | 6/18/1998 | A | PASS |
Tom Arcoraci
|
|
|
made ok r-bar placedAROLD ###-####
|
INSP - Foundation | 6/18/1998 | 6/18/1998 | 6/18/1998 | | PASS |
Tom Arcoraci
|
|
|
/ / 408 -
|
Routing - PLAN CHECK | 3/16/1998 | | 3/27/1998 | | PASS |
|
|
|
field inspector to check for (1) accessible route (see comments attached to the plans) and (2) existing brick veneer for 1-hour rating
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/27/1998 | | PASS |
|
|
|
|
Issue PAID IN FULL permit | | | 3/27/1998 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/27/1998 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 3/27/1998 | | PASS |
|
|
|
APPROVED (CONDITION: NEEDS FIRE REVIEW APPROVAL)
|
Print Occupancy Form | | | 3/27/1998 | | |
|
|
|
|
Routing - FIRE | 3/27/1998 | | 3/27/1998 | | PASS |
|
|
|
|
Plan assigned to (JML) | 12/1/1997 | | 3/27/1998 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 12/22/1997 | | 3/27/1998 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 3/13/1998 | | 3/16/1998 | | PASS |
|
|
|
|
Telephone call | | | 3/4/1998 | | FAIL |
|
|
|
I advised Tom Neiwirth ( architect ) to access the entire building for an accessible route in compliance with UBC appendix ch. 11. I sent Tom a fax and letter with the re-review findings.
|
90 day tracking............. | | 11/20/1997 | 2/18/1998 | | |
|
|
|
|
Meeting | | | 2/12/1998 | | PEND |
|
|
|
Meet w/ Harold Drake. He has agreed to an upgrade of the existing facilities to comply with the 1970 UBC 1. gasketting the 20 minute doors and 2. installing fire dampers in the ceiling openings in the corridoor. The work is to be completed within two years. He was told to resubmit plans showing the addition being separated from the existing dining room by 1-hour corridor walls and openings.
|
Plan Reviewer's activity | | | 2/9/1998 | | FAIL |
|
|
|
meet with owner Harold Drake for the second time with Dan Stuart on 2-3-98. Marlene Southard agreed to allow the existing dining room to remain as approved on the original 1972 permit # 6808 as long as the addition is separated from the cooridor/dining room as per an approved 1-hour corridor wall. I researched and found the 1970 code to have been adopted at that time. Sent the owner a copy of my findings today and requested an upgrade agreement schedule for the corridor upgrade for fire dampers and gaskets on the doors etc. With such the addition could be permited. The allowable area is meet with three yards ( 37' min.) sprinklers, existing area separation walls and type V-1hour.
|
Plan Reviewer's activity | | | 12/22/1997 | | PEND |
|
|
|
MET WITH PROJECT ARCHITECT AND DAN STUART. ARCH. NEEDS TO DO FURTHER RESEARCH AND RESUBMIT.
|
Routing - PUBLIC WORKS | 12/17/1997 | | 12/19/1997 | | FAIL |
|
|
|
NEEDS STAMPED ENGINEERING ON DRAINAGE PLANS.
|
Plans ACCEPTED BY PLAN CHECK | | | 12/16/1997 | | PASS |
|
|
|
SEE ACTION A007 HOLD
|
Plan Reviewer's activity | | | 12/8/1997 | | FAIL |
|
|
|
I am withholding my plan review comments until I have an opportunity to confer with Dan Stuart concerning a pre-ap. meeting he may have had about this project. 12/8/97 JML
|
Routing - PLANNING | 12/1/1997 | | 12/2/1997 | | PASS |
|
|
|
APPROVED BY SRS.
|
Plan assigned to (MYS) | 11/20/1997 | | 12/1/1997 | | PEND |
Marlene Southard
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 12/1/1997 | | PEND |
|
|
|
AM ROUTING TO P&Z TO CHECK ON DR AND CU#. STILL HOLDING FOR P.W. UNTIL I RECEIVE LETTER FORM ENG. SEE ACTION 007 HOLD
|
Application received | | | 11/20/1997 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/20/1997 | | |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 11/20/1997 | | HOLD |
|
|
|
PLANS REQUIRE CORRESPONDENCE FROM PROJECT ENGINEER ABOUT DRAINAGE OF COURT YARD AREA. CONTACTED TOM NEIWERTH AT 1-###-#### OF THIS NEED ON 11-25-97. KMM 12-16-97 RECEIVED LETTER REGARDING DRAINAGE OF COURT YARD AREA FROM GARY BURKETT AT EHM ENGINEERS. GAVE TO JOHN L. TO PUT WITH PLANS.
|
Gay Receipt For Partial Pay | | | 11/20/1997 | | |
|
|
|
|