Permanent Occupancy | | 4/30/1999 | 4/30/1999 | | DONE |
|
|
|
|
INSP - Final | 4/30/1999 | 4/30/1999 | 4/30/1999 | P | PASS |
Jim Storey
|
|
|
04/30/99 301 - Adolph ###-####
|
Permanent occupancy | | | 4/30/1999 | | PASS |
|
|
|
Perm. Occ. Cert. #7758 issued 4-30-99 to the Wright Street Hangar.
|
Code Occupancy Approval | | | 12/1/1998 | | |
|
|
|
Final requested by Art Musser. He received a request on his cell phone.
|
INSP-Final Inspection | 11/24/1998 | 11/24/1998 | 11/24/1998 | P | PASS |
Rick Jackson
|
|
|
KEN...###-#### occ approved
|
INSP - Final | 11/19/1998 | 11/19/1998 | 11/20/1998 | P | PART |
Jim Storey
|
|
|
11/19/98 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED ok for temp oc
|
INSP - Final | 11/5/1998 | 11/6/1998 | 11/6/1998 | P | PART |
Tom Arcoraci
|
|
|
11/06/98 408 - TRYING TO GET A TEMP OCC--KEN ###-#### temp ok
|
INSP-Final Inspection | 11/5/1998 | 11/6/1998 | 11/6/1998 | A | PART |
Joe Tawney
|
|
|
11/06/98 406 - KEN ###-#### REINSP OK FOR TEMP OCC DOOR HDWRE,ROTATE FIRE HYDRANT
|
INSP-Sprinkler Rough-in/Hydro | 10/29/1998 | 10/30/1998 | 10/30/1998 | A | FAIL |
Rick Jackson
|
|
|
KEN ###-#### door hardware on both floors; extinguisher for hangar; address; hydrant steamer connection wring direction
|
INSP - Final | 10/27/1998 | 10/27/1998 | 10/28/1998 | P | NR |
Jim Storey
|
|
|
10/27/98 301 - work in progress n/r for final fire stopping, stairs and
|
INSP - Wall cover | 10/22/1998 | 10/22/1998 | 10/23/1998 | P | PASS |
Jim Storey
|
|
|
10/22/98 301 - ADOLPH ###-#### CEILING COVER SCLG-OK SUSPENDED CEILING
|
Print Occupancy Form | | | 10/22/1998 | | |
|
|
|
|
INSP - Framing/Rough-in | 8/10/1998 | 8/10/1998 | 8/11/1998 | P | PASS |
Jim Storey
|
|
|
08/10/98 301 - sheet rock cover adolf ###-#### FRAM-OK FRAMING
|
Receive PAYMENT IN FULL PRINT | | | 8/5/1998 | | |
|
|
|
|
Plan assigned to (JML) | 7/14/1998 | | 8/3/1998 | | PASS |
|
|
|
plan modification filed with $500 fee paid 7/14/98 sheets submitted M2,M3 &M4 and structural cals and stamped shop drawings of second floor floor framing.
|
Routing - PLAN CHECK | 8/3/1998 | | 8/3/1998 | | PASS |
|
|
|
plan modification approved
|
Routing - PLUMBING | 7/31/1998 | | 8/3/1998 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 7/30/1998 | | 7/30/1998 | | PEND |
|
|
|
Still needs plumbing approval of the plan modification. Building approval is based on architects response letter with calculations showing the second floor is less than 3000 Sq. Ft. of space which is required to be accessible and therefore no accessible route is required.
|
Routing - PLAN CHECK | 7/24/1998 | | 7/29/1998 | | FAIL |
|
|
|
Plan review for the plan modification failed 7/24 Resub failed 7/29
|
Routing - FIRE | 7/23/1998 | | 7/23/1998 | | PASS |
|
|
|
modified plans accepted as noted on orginal plan review attached to modified sheets.
|
Routing - PLANNING | 7/17/1998 | | 7/22/1998 | | PASS |
|
|
|
routing plan modification jml revisions are minor and do not require any additional Planning review.
|
Routing - PUBLIC WORKS | 7/15/1998 | | 7/17/1998 | | PASS |
|
|
|
NEW SEWER FEES TO BE PAID WHEN APPL. PICKS UP MODIFICATION PERMIT. PER LOUIS W. OF PW ROUTING FOR PLAN MODIFICATION JML
|
INSP - Framing/Rough-in | 7/9/1998 | 7/10/1998 | 7/10/1998 | A | PART |
Jim Storey
|
|
|
07/10/98 301 - conf. must proceed with submital info. to plan review be proceed. stair run not per code landing letter fo intent recieved for re
|
INSP - Framing/Rough-in | 7/8/1998 | 7/8/1998 | 7/8/1998 | P | PART |
Jim Storey
|
|
|
07/08/98 301 - adoff ###-#### CORR-CORREC-CALL FOR REINSP WHEN COMPLETEDengineering for bolt conection siecmic post to footing sedge anchor. final sign off letter of special i ok to rock exterior walls only.
|
INSP - Framing/Rough-in | 7/6/1998 | 7/7/1998 | 7/7/1998 | A | PART |
Jim Storey
|
|
|
07/07/98 301 - fire walls first floor ok
|
Plan Reviewer's activity | | | 6/10/1998 | | FAIL |
|
|
|
REVISIONS/RESUBMITTALS MADE AFTER THE PERMIT WAS ISSUED. THEY ARE INCOMPLETE AND NEED PLANNING APPROVAL.
|
INSP - Concrete | 4/27/1998 | 4/27/1998 | 4/27/1998 | P | PASS |
Jim Storey
|
|
|
04/27/98 301 - FDN -OK FOUNDATION
|
INSP - Concrete | 4/20/1998 | 4/20/1998 | 4/20/1998 | P | FAIL |
Jim Storey
|
|
|
04/20/98 301 - strucral c/n still pending hail pin clearnce not ready.
|
INSP - Foundation | 3/29/1999 | 4/16/1998 | 4/16/1998 | | FAIL |
|
|
|
trench drain not permitted to drain to site sewer resubmit
|
INSP - Foundation | 4/8/1998 | 4/8/1998 | 4/8/1998 | P | PASS |
Jim Storey
|
|
|
04/08/98 301 - FRMS-OK FORMS-REBAR interior footings for mezanene ok
|
INSP - Foundation | 4/6/1998 | 4/7/1998 | 4/7/1998 | A | PART |
Jim Storey
|
|
|
04/07/98 301 - FRMS-OK FORMS-REBAR SPECIAL INSP. ON SITE PENDING REPORT
|
INSP - Foundation | 4/3/1998 | 4/3/1998 | 4/3/1998 | P | FAIL |
Jim Storey
|
|
|
04/03/98 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED engineering re
|
INSP - Foundation | 3/30/1998 | 3/30/1998 | 3/30/1998 | P | PASS |
Jim Storey
|
|
|
03/30/98 301 - FRMS-OK FORMS-REBAR
|
INSP - Foundation | 3/26/1998 | 3/30/1998 | 3/30/1998 | A | NR |
Jim Storey
|
|
|
03/30/98 301 - FOOTING--WRIGHT STREET HANGAR--ADOLPH ###-#### recall for pm mit to be on site.
|
(F) Reprint permit | | | 2/23/1998 | | |
|
|
|
|
90 day tracking............. | | 11/20/1997 | 2/18/1998 | | |
|
|
|
|
(F) Reprint permit | | | 2/12/1998 | | |
|
|
|
|
(F) Reprint permit | | | 2/11/1998 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 2/11/1998 | | |
|
|
|
|
Routing - PLAN CHECK | 2/9/1998 | | 2/10/1998 | | PASS |
|
|
|
ISSUED
|
Plan assigned to (PRP) | 12/1/1997 | | 2/10/1998 | | PASS |
|
|
|
failed, plumbing, planning, pu. Waiting for redesign. 02/10/98--ALL RESUBS IN AND APPROVED, APPROVED BY ALL AGENCIES, ISSUE 02/10/98 11:51:44 PRP - this action updated by action script from <<>> in Case No. BLD97-3484
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/10/1998 | | PASS |
|
|
|
ISSUE
|
Print Occupancy Form | | | 2/10/1998 | | |
|
|
|
|
Inspection Record Card- Bld | | | 2/10/1998 | | |
|
|
|
|
Telephone call | | | 2/10/1998 | | |
|
|
|
LEFT MESSAGE FOR DICK TO CALL ME FOR $ AMOUNT
|
Print Pending Permit.LaserJet4 | | | 2/10/1998 | | PASS |
|
|
|
FILES
|
Routing - PUBLIC WORKS | 2/2/1998 | | 2/9/1998 | | PASS |
|
|
|
THIS SET OF PLANS IS CHECKED OUT TO THE AIRPORT AT PW'S REQUEST. THEY NEEDED TO BE SIGNED OFF BECAUSE OF NEW DRAINAGE CALCS. KMM
|
Routing - PLANNING | 2/9/1998 | | 2/9/1998 | | PASS |
|
|
|
PACKAGE #1 X-REF: DRH97-0169 & DRH98-0010. APPROVED BY MS
|
Routing - AIRPORT | 2/3/1998 | | 2/5/1998 | | PASS |
|
|
|
SENT TO AIRPORT AT PW'S REQUEST. THESE PLANS ARE THE SAME SET THAT ARE CHECKED OUT TO PW'S. KMM BACK TO PW 2/6/98 DAR
|
Plan Reviewer's activity | | | 2/1/1998 | | PASS |
|
|
|
review plans and engineering, prepare correcton list, fax to Arch and Contractor, forward to Fire. 2/10/98--RESUBS ALL IN, REVIEWED, APPROVED, ALL AGENCIES APPROVED, ISSUE
|
Routing - PLUMBING | 1/27/1998 | | 1/30/1998 | | PASS |
|
|
|
|
Plan resubmittals received | | | 1/29/1998 | | |
|
|
|
RECEIVED 1 COPY OF SUPPLEMENTAL CALCS PREPARED BY BRIAN MARTINS OF EHM ENGINEERS. FROM ADOLPH OF TALBOY CONSTRUCTION. ROUTED TO DICK PIERCE. KMM
|
Routing - FIRE | 1/27/1998 | | 1/27/1998 | | PASS |
|
|
|
|
Plan resubmittals received | | | 1/26/1998 | | PEND |
|
|
|
RECEIVED RESUBMITTALS FROM TALBOY CONSTRUCTION 1/26/98 DAR. TO DICK PIERCE'S DESK
|
Routing - FIRE | 1/21/1998 | | 1/26/1998 | | FAIL |
|
|
|
PACKAGE #1
|
Plan resubmittals requested | 1/21/1998 | | 1/21/1998 | | |
|
|
|
|
Routing - PLAN CHECK | 1/16/1998 | | 1/21/1998 | | FAIL |
|
|
|
To Fire
|
Routing - PUBLIC WORKS | 1/15/1998 | | 1/16/1998 | | FAIL |
|
|
|
SEWER PLANS TO BE REVISED TO SHOW EXTENSION REVISIONS BY HUBBEL.
|
Routing - PLAN CHECK | 1/14/1998 | | 1/15/1998 | | PEND |
|
|
|
PACKAGE #1 to pw
|
Routing - AIRPORT | 12/22/1987 | | 1/14/1998 | | PASS |
|
|
|
PACKAGE #1
|
Routing Off Site - A.C.H.D | 11/24/1997 | | 12/22/1997 | | PASS |
|
|
|
PACKAGE #2 CONTACTED DICK TALBOY AT ###-#### TO TAKE PLANS OUT TO ACHD ACHD FEES DUE.
|
Routing - PLAN CHECK | 12/22/1997 | | 12/22/1997 | | PEND |
|
|
|
PACKAGE #2 to Airport
|
Routing - PUBLIC WORKS | 12/18/1997 | | 12/19/1997 | | FAIL |
|
|
|
NEEDS DRAINAGE PLAN PER BM
|
Routing - PLUMBING | 12/16/1997 | | 12/17/1997 | | FAIL |
|
|
|
PACKAGE #1
|
Routing - PLANNING | 12/12/1997 | | 12/15/1997 | | FAIL |
|
|
|
PACKAGE #1 X-REF: DRH97-0169. DESIGN HAS CHANGED. APPLICANT NEEDS TO SUBMIT A MODIFICATION APPLICATION AT STAFF LEVEL. CONTACTED ARCHITECT, JAMES GIPSON. REVIEWED BY MGS.
|
Routing - PUBLIC WORKS | 12/2/1997 | | 12/12/1997 | | FAIL |
|
|
|
PACKAGE #1 CHECK ON GRADING AND DRAINAGE AFTER BRIAN TALKS TO MATT PATEJA. SEWER PLAN TO BE REVISED. TO SHOW EXTENSION
|
Routing Off Site - STRUCTURAL | 12/2/1997 | | 12/2/1997 | | |
|
|
|
PACKAGE #3 WE ARE DOING ENGINEERING PER JOHN M.
|
Plans ACCEPTED BY PLAN CHECK | | | 12/2/1997 | | PASS |
|
|
|
SEE ACTION 007 HOLD
|
Plan assigned to (MYS) | 11/20/1997 | | 12/1/1997 | | PASS |
Marlene Southard
|
|
|
|
Received Certificate of Value | | | 11/24/1997 | | PASS |
|
|
|
CERT. OF VALUE NOT SIGNED. CONTACTED DICK TALBOY AT ###-#### OR CELL ###-#### SIGNED 11-24-97 PM
|
Plan routing begun/NEW & ADDTN | | | 11/24/1997 | | PASS |
|
|
|
AM ROUTING ACHD PACKAGE AND SENDING PACKAGE #1 TO PW FOR BRIAN TO TAKE A LOOK AT BEFORE OFFICAL ROUTING BEGINS. KMM 12-02-97 SENT PACKAGE #1 TO P.W. TO START ROUTING.
|
Gay Receipt For Partial Pay | | | 11/20/1997 | | |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 11/20/1997 | | HOLD |
|
|
|
CONTACTED DICK TALBOY AT ###-#### TO LET HIM KNOW OF THE NEEDS LISTED BELOW 1. REQUIRES A SIGNED CERT. OF VALUE. RECEIVED 11-24-97 2. STRUCTURAL SHEETS NEED TO BE STAMPED AND SIGNED. RECEIVED 12-01-97 3. INFORMATION FROM MANUFACTURER OF PRE ENGINEERED BLD. RECEIVED 12-01-97 5. REQUIRES ADDITIONAL PROJECT MANUEL RECEIVED 12-01-97 (GRADING AND DRAINAGE IS GOING TO BE DONE BY THE AIRPORT) SO THE GRADING AND DRAINAGE SHEET I HAVE CAN STAY AS IS. AS OF 11-28-97 12-02-97 GAVE ENG. PACKAGE TO JOHN M. TO SEE IF OUTSIDE ENG. IS NEEDED. 12-02-97 JOHN M. STATES WE WILL DO ENGINEERING.
|
Application received | | | 11/20/1997 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/20/1997 | | |
|
|
|
|