Permanent occupancy | | | 7/30/1998 | | PASS |
|
|
|
Perm. Occ. Cert. #7333 issued 7-30-98 to Ethan Allen Home Interiors.
|
Permanent Occupancy | | 7/29/1998 | 7/29/1998 | | DONE |
|
|
|
|
INSP - Final | 6/26/1998 | 6/26/1998 | 6/26/1998 | P | NR |
Carl Dependahl
|
|
|
will place landing at door 3 per c/n; recall when ready. 338 area.
|
INSP - Final | 6/24/1998 | 6/25/1998 | 6/25/1998 | A | FAIL |
Carl Dependahl
|
|
|
06/25/98 340 - phil ###-#### c/n, need landing at rear door or approval door is from warehouse area w/ 1 other exit.
|
Code Occupancy Approval | | | 6/24/1998 | | PASS |
|
|
|
Inspected for Final - meets compliance with DRH97-0217
|
PubWorks Occupancy Approval | | | 6/24/1998 | | DONE |
|
|
|
Drainage project complete 06/24/98. R.Rokovitz
|
INSP - Final | 6/19/1998 | 6/22/1998 | 6/22/1998 | A | FAIL |
|
|
|
06/22/98 338 - not ready need code enforcement, public works drainage
|
SUPER- Supervisor's review | 6/22/1998 | | 6/22/1998 | | D |
|
|
|
a-1 said allen was writing new corrections each time he went to site. this is phased construction and he should be writing corrections in the area he is in at the time. no problem but inspectors need to be aware of the problems with phased permits.
|
INSP-Final Inspection | 6/18/1998 | 6/19/1998 | 6/19/1998 | A | PASS |
Joe Tawney
|
|
|
06/19/98 406 - Phil ###-#### REINSP OK FOR PERM OCC WHSE AND CERT OF COMPLETION FOR STORE
|
INSP - Final | 6/11/1998 | 6/11/1998 | 6/11/1998 | | FAIL |
Joe Tawney
|
|
|
/ / 406 - FINAL FAIL WORK NOT COMPLETED EXIT SIGNS SPKLR RISER CLEARAN
|
INSP-Final Inspection | 6/8/1998 | 6/10/1998 | 6/10/1998 | P | CANC |
Joe Tawney
|
|
|
06/10/98 406 - Phil ###-#### Will call and set up time CANCELLED RESCHED FOR 8:30 AM 6/11/98
|
INSP - Framing/Rough-in | 6/8/1998 | 6/9/1998 | 6/9/1998 | A | PART |
|
|
|
MADE OK TO COVER THE CEILING WILL INSPECT CORRECTIONS AT THE FINAL WALK THROUGH NEED SOME LIGHT FIXTURE WORK
|
INSP-Final Inspection | 6/1/1998 | 6/1/1998 | 6/1/1998 | P | FAIL |
Joe Tawney
|
|
|
06/01/98 406 - partial final temp occ/ warehouse/ ###-#### phil FINAL ON WHSE FAIL ALARM SYSTEM LIGHTS
|
INSP - Framing/Rough-in | 5/18/1998 | 5/19/1998 | 5/19/1998 | P | PART |
|
|
|
made ok to drywall and start the grid ceiling this section
|
INSP - Framing/Rough-in | 5/15/1998 | 5/18/1998 | 5/18/1998 | P | CANC |
|
|
|
05/19/98 338 - canc by the cntr 2:pm on the phone other agencies not app
|
INSP-Sprinkler Rough-in/Hydro | 3/26/1998 | 3/26/1998 | 3/26/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - OK ON HYDRO TEST
|
INSP-Sprinkler Rough-in/Hydro | 3/26/1998 | 3/26/1998 | 3/26/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - OK ON HYDRO TEST
|
INSP - Framing/Rough-in | 3/20/1998 | 3/23/1998 | 3/23/1998 | A | PASS |
|
|
|
03/24/98 338 - made ok to insulate called phil
|
INSP-Sprinkler Rough-in/Hydro | 3/18/1998 | 3/18/1998 | 3/18/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - OK ON SPKLR ROUGH IN FOR NEW ADDITION
|
INSP - Framing/Rough-in | 3/6/1998 | 3/9/1998 | 3/9/1998 | A | PASS |
|
|
|
03/09/98 338 - SHEER NAILING PHIL ###-#### SHEAR NAILING MADE OK NEED TO A-35 TOP OF INT SHEAR WALL # 4
|
90 day tracking............. | | 12/4/1997 | 3/4/1998 | | PEND |
|
|
|
|
INSP - Framing/Rough-in | 1/28/1998 | 1/28/1998 | 1/29/1998 | P | PASS |
|
|
|
01/28/98 338 - HIS IS FOR A WALL--KEVIN ###-#### made ok r-bar placed
|
INSP - Footings | 1/27/1998 | 1/28/1998 | 1/29/1998 | A | PASS |
|
|
|
01/28/98 338 - ETHAN ALLEN--###-#### KEVIN made ok r-bar placed
|
INSP - Foundation | 1/28/1998 | 1/28/1998 | 1/28/1998 | | |
|
|
|
/ / 338 -
|
INSP - Foundation | 1/26/1998 | 1/26/1998 | 1/26/1998 | P | PART |
|
|
|
01/26/98 338 - kevin ###-#### reinspection made ok sp insp not required
|
INSP - Footings | 1/23/1998 | 1/23/1998 | 1/26/1998 | P | PART |
|
|
|
01/26/98 338 - POURING AT 2:30--KEVIN--###-####--ENGINEER SAYS THEY DON' INSPECTION. made ok for the rear/north footing wall only to use concrete the road
|
INSP - Footings | 1/23/1998 | 1/23/1998 | 1/26/1998 | P | PASS |
|
|
|
01/26/98 338 - PER YOUR REQUEST made ok to pour r-bar placed FTG -OK FOOTING
|
INSP - Footings | 1/22/1998 | 1/23/1998 | 1/23/1998 | A | PART |
|
|
|
01/23/98 333 - special insp required appears ok as far as they have gote
|
INSP - Footings | 1/23/1998 | 1/23/1998 | 1/23/1998 | | FAIL |
|
|
|
/ / 338 - r-bar not placed
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/16/1998 | | PASS |
|
|
|
ISSUE
|
Inspection Record Card- Bld | | | 1/16/1998 | | |
|
|
|
|
Print Occupancy Form | | | 1/16/1998 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 1/16/1998 | | |
|
|
|
|
Plan resubmittals received | | | 1/15/1998 | | PASS |
|
|
|
RECEIVED PLANS AND ADDENDUMS, REVIEW CHANGES, APPROVE, INSERT TO PROJECT PLANS, ISSUE
|
Plan Reviewer's activity | | | 1/15/1998 | | PASS |
|
|
|
REVIEWED PLANS, SPECS, AND STRUCTURAL ENGINEERING INCLUDING CALULATIONS, RED-LINE, PREPARE CORRECTION LIST, FAX TO ARCH, FORWARD TO FIRE AND PW FOR APPROVAL. 1/15/98--RECEIVED RESUBS, APPROVE AND ISSUE PERMIT
|
Plan assigned to (PRP) | 12/4/1997 | | 1/15/1998 | | PASS |
|
|
|
pkg 2 routing-12/5/97: Package 1 at Johns Desk. 12/19/97--to Dick for review start. 12/22/97--REVIEW COMPLETE, FORWARD TO FIRE AND PW FOR APPROVAL. 01/15/98 16:25:23 PRP - this action updated by action script from <<>> in Case No. BLD97-3583
|
Routing - PLAN CHECK | 1/5/1998 | | 1/15/1998 | | PASS |
|
|
|
PACKAGE #1 to Dick ISSUED PERMIT-1/15/98
|
Routing - PUBLIC WORKS | 1/6/1998 | | 1/8/1998 | | PASS |
|
|
|
|
Routing Off Site - A.C.H.D | 12/5/1997 | | 1/8/1998 | | PASS |
|
|
|
PACKAGE #2 CONTACTED JERRY TEAL TO TAKE PLANS OUT TO ACHD ACHD FEES DUE 1/8/98 DAR ACHD CERTIFICATE #98-0580 RECIEVED FROM CONTRACTOR-1/15/98
|
Routing - PUBLIC WORKS | 1/2/1998 | | 1/5/1998 | | FAIL |
|
|
|
PACKAGE #1 REQUIRES DRAINAGE PLAN (3 MORE COPIES) PER BRIAN MURPHY.
|
Routing - FIRE | 12/22/1997 | | 1/2/1998 | | PASS |
|
|
|
PACKAGE #1
|
Print Pending Permit.LaserJet4 | | | 12/22/1997 | | PEND |
|
|
|
FILES
|
Plan resubmittals requested | 12/22/1997 | | 12/22/1997 | | |
|
|
|
|
Routing - PLUMBING | 12/17/1997 | | 12/18/1997 | | PASS |
|
|
|
PACKAGE #1
|
Routing - PLANNING | 12/15/1997 | | 12/17/1997 | | PASS |
|
|
|
PACKAGE #1 X-REF: DRH97-0217. APPROVED BY MGS.
|
Routing - PUBLIC WORKS | 12/9/1997 | | 12/15/1997 | | FAIL |
|
|
|
PACKAGE #1 NEEDS DRAINAGE PLAN REVISION.
|
Plans ACCEPTED BY PLAN CHECK | 12/9/1997 | | 12/9/1997 | | PASS |
|
|
|
|
Application received | | | 12/4/1997 | | |
|
|
|
|
Routing - ELECTRICAL | 12/4/1997 | | 12/4/1997 | | PASS |
|
|
|
NO REVIEW FIELD VERIFY
|
Plan assigned to (MYS) | 12/4/1997 | | 12/4/1997 | | PASS |
Marlene Southard
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 12/4/1997 | | PEND |
|
|
|
SEE ACTION 007 HOLD
|
Received Certificate of Value | | | 12/4/1997 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 12/4/1997 | | 12/4/1997 | | |
|
|
|
PLANS GIVEN TO JOHN M. FOR REVIEW. HE STATED WE WILL BE DOING ENGINEERING.
|
Plans ACCEPTED BY PLAN CHECK | | | 12/4/1997 | | HOLD |
|
|
|
SUBMITTED AS A FIVE PACKAGE SUBMITTAL PACKAGE 1 (IN HOUSE) PACKAGE 2 (ACHD) PACKAGE 3 (OUTSIDE ENGINEERING) GAVE TO JOHN M. TO LOOK OVER HE STATED WE WILL DO THE ENGINEERING. PLANS REQUIRE DRAINAGE CALCS AND A SOILS REPORT (2000 PSF). I CONTACTED JERRY TEAL AT ###-#### TO LET HIM KNOW OF THESE NEEDS. NO PROJECT MANUEL WAS SUBMITTED WITH THESE PLANS. KMM 12-05-97 I AM GOING TO ROUTE THE ACHD PACKAGE. 12-05-97 RECEIVED SOILS REPORT. 12-09-97 RECEIVED DRAINAGE CALCS.
|
Routing - PLAN CHECK | 12/4/1997 | | | | PEND |
|
|
|
|