Fee Review-notes | 7/14/1998 | | 1/27/1999 | | DONE |
|
|
|
|
Receive PAYMENT IN FULL PRINT | | | 9/1/1998 | | |
|
|
|
|
CHANGE STATUS TO (I) | | | 9/1/1998 | | |
|
|
|
|
(F) Reprint permit | | | 8/5/1998 | | |
|
|
|
|
CHANGE STATUS TO (F) | | | 6/22/1998 | | FEES |
|
|
|
ADDITIONAL VALUE
|
FEE REVIEW-NOTES | | | 6/19/1998 | | FEES |
|
|
|
additional values ele plb mech 6436.00 additional
|
INSP - Final | 5/8/1998 | 5/11/1998 | 5/11/1998 | A | PASS |
Joe Tawney
|
|
|
05/11/98 406 - PERM OCC SIGNED OFF 4/27/98
|
INSP - Final | 5/11/1998 | 5/11/1998 | 5/11/1998 | A | PART |
Carl Dependahl
|
|
|
conf; has signatures...will recall
|
INSP - Final | 5/11/1998 | 5/11/1998 | 5/11/1998 | P | |
Wes Worcester
|
|
|
w/ Jeff at site, has card
|
Permanent Occupancy | | 5/11/1998 | 5/11/1998 | | DONE |
|
|
|
|
Permanent occupancy | | | 5/11/1998 | | PASS |
|
|
|
Perm. Occ. Cert. #7246 issued 5-11-98 to Parks & Rec.
|
Code Occupancy Approval | | | 5/1/1998 | | PASS |
|
|
|
Checked site and met with contractor Jeff. No landscape issue or other P&Z requirements. Signed final
|
Code Occupancy Approval | | | 4/29/1998 | | PEND |
|
|
|
Requested by: Jeff Fuller
|
INSP - Final | 4/27/1998 | 4/28/1998 | 4/28/1998 | A | FAIL |
Carl Dependahl
|
|
|
JEFF/###-#### 20201 - FINAL STRUCTURAL INSP. c/n firestop 1hr lid at penetrations, get other signatures (p&z, p. wks...) signed card for temp
|
INSP-Final Inspection | 4/27/1998 | 4/27/1998 | 4/27/1998 | P | PASS |
Joe Tawney
|
|
|
04/27/98 406 - ###-#### RADIO CODE 20201/JEFF - FIRE INSP. FINAL OK FOR PERM OCC
|
INSP - Final | 4/15/1998 | 4/15/1998 | 4/15/1998 | P | PASS |
Wes Worcester
|
|
|
04/15/98 342 - gerad ###-#### to insp roof only
|
SUPER- Supervisor's review | 4/6/1998 | 4/6/1998 | 4/6/1998 | | PEND |
|
|
|
review of roof construction.
|
INSP - Framing/Rough-in | 4/3/1998 | 4/6/1998 | 4/6/1998 | A | FAIL |
Wes Worcester
|
|
|
04/05/98 342 - still has outstanding c/n -10:00 AS PER 342-MARK ###-####
|
INSP - Framing/Rough-in | 4/3/1998 | 4/6/1998 | 4/6/1998 | A | NR |
Carl Dependahl
|
|
|
ROOF-10:00 342 IS ALSO GOING OUT...no insp, conf w/ wes
|
INSP - Framing/Rough-in | 4/1/1998 | 4/2/1998 | 4/2/1998 | A | FAIL |
Wes Worcester
|
|
|
04/01/98 342 - ROOF GERALD ###-####
|
INSP - Framing/Rough-in | 3/18/1998 | 3/19/1998 | 3/19/1998 | A | PART |
Wes Worcester
|
|
|
03/19/98 342 - placing double 5 bar at door headers
|
INSP - Foundation | 3/16/1998 | 3/17/1998 | 3/17/1998 | A | PART |
Wes Worcester
|
|
|
03/17/98 342 - GROUTING BLOCK WALL--JERROD ###-####
|
90 day tracking............. | | 12/16/1997 | 3/16/1998 | | |
|
|
|
|
INSP - Concrete | 3/12/1998 | 3/12/1998 | 3/12/1998 | A | NR |
Carl Dependahl
|
|
|
NEED PLBG OK BEFORE SLAB
|
INSP - Concrete | 3/6/1998 | 3/6/1998 | 3/6/1998 | A | PART |
Carl Dependahl
|
|
|
discussed insps w/ mason; found wall looks ok, will pour grout in approx 4' lifts.
|
INSP - Foundation | 3/4/1998 | 3/5/1998 | 3/5/1998 | P | PART |
Carl Dependahl
|
|
|
JERROD ###-####; allready grouted, bar looks ok. Told gen'l to have mason call me
|
INSP - Foundation | 3/4/1998 | 3/4/1998 | 3/4/1998 | A | PASS |
Carl Dependahl
|
|
|
BAR IN PLACE; TOLD CONT TO HAVE ALL MASONRY INSPS CALLED IN...NO SPEC. INSP. PER ARLAN S.
|
INSP - Foundation | 3/3/1998 | 3/4/1998 | 3/4/1998 | A | CANC |
Wes Worcester
|
|
|
03/03/98 342 - JERAD ###-#### ASAP given to Carl
|
INSP - Foundation | 3/3/1998 | 3/3/1998 | 3/3/1998 | | NR |
Wes Worcester
|
|
|
/ / 342 -
|
INSP - Foundation | 3/2/1998 | 3/3/1998 | 3/3/1998 | A | NR |
Wes Worcester
|
|
|
03/03/98 342 - ATHLETIC COMPLEX--BATHROOMS--FOOTING--11 am apt
|
INSP - Concrete | 3/3/1998 | 3/3/1998 | 3/3/1998 | A | NR |
Carl Dependahl
|
|
|
DISCUSSED INSP PROCESS, NEED REBAR IN; TOLD TO RECALL, WOULD TRY TO HAVE WES GO BY LATE AM.
|
INSP - Foundation | 2/26/1998 | 3/2/1998 | 3/2/1998 | P | NR |
Carl Dependahl
|
|
|
gerard ###-#### for a footing insp...NR, NEED BAR IN & DETERMINATION FOR SPEC INSP FOR STRUCT MASONRY.
|
(F) Reprint permit | | | 2/26/1998 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 2/25/1998 | | |
|
|
|
|
Telephone call | | | 2/23/1998 | | |
|
|
|
talked to curtis crystall csqa. said value changing to 104,000 and park lane dev would be coming it to pick it up. gave plans to dave radford to change value.pe
|
Print Occupancy Form | | | 1/29/1998 | | |
|
|
|
|
Telephone call | | | 1/29/1998 | | |
|
|
|
called gave dollar amount-answering machine
|
Routing - PLAN CHECK | 1/29/1998 | | 1/29/1998 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 1/29/1998 | | |
|
|
|
|
Routing Off Site - A.C.H.D | 1/29/1998 | | 1/29/1998 | | PASS |
|
|
|
CONTACTED MARCUS TO INQUIRE ABOUT ACHD FEES. HE STATED THAT NONE WERE REQUIRED.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/29/1998 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 1/28/1998 | | 1/28/1998 | | PASS |
|
|
|
|
Plan resubmittals received | | | 1/20/1998 | | |
|
|
|
RECEIVED 2 COPIES OF REVIESED SHEET A4.1 AND 2 COPIES OF RESPONSE TO STRUCTURAL COMMENT. ROUTED TO ARLAN SMITH
|
Routing - PLAN CHECK | 1/2/1998 | | 1/20/1998 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 1/2/1998 | | PEND |
|
|
|
Intial plan review report faxed to CSHQA.
|
Routing - FIRE | 1/2/1998 | | 1/2/1998 | | PASS |
|
|
|
|
Routing - PLANNING | 12/29/1997 | | 12/30/1997 | | PASS |
|
|
|
APPROVED BY RLB. ALLOWED USE.
|
Plan Reviewer's activity | | | 12/29/1997 | | PEND |
|
|
|
Ads meet with Curtis Crystal of CSHQA. The type of consrruction is to be changed to V-1hr. for fire access reasons. plan changes are to be submitted.
|
Routing - PLUMBING | 12/23/1997 | | 12/26/1997 | | PASS |
|
|
|
|
Plan assigned to (JCM) | 12/17/1997 | | 12/23/1997 | | PASS |
John Menard
|
|
|
|
Routing - PUBLIC WORKS | 12/17/1997 | | 12/17/1997 | | FAIL |
|
|
|
INCOMPLETE SITE PLAN. JR
|
Plan routing begun/NEW & ADDTN | 12/17/1997 | | 12/17/1997 | | |
|
|
|
|
Received Certificate of Value | | | 12/17/1997 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 12/17/1997 | | PASS |
|
|
|
|
Plan assigned to (MYS) | 12/16/1997 | | 12/17/1997 | | |
Marlene Southard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/16/1997 | | |
|
|
|
505688826/
|
Application received | | | 12/16/1997 | | |
|
|
|
|
Plan assigned to (ADS) | 12/23/1997 | | 1/29/1997 | | PASS |
|
|
|
|