Information based on query as of Friday, July 19, 2024.
Permit Information
Permit NumberBLD97-03787
StatusFinaled
Name GIFT SHOP - GROVE HOTEL
Site Address 245 S CAPITOL BLVD
Project NameGROVE HOTEL-1ST FLR
Customer Number 
ePlanReviewNo
Description
(LOBBY GIFT SHOP) Fire sprinklers used to meet high rise requirements. To finish a 276 square foot area to be used as a gift shop. This area was originally approved for storage. Work is to include a display window, suspended ceilings, and millwork all per approved drawings and plan check conditions on file. The location of fire sprinkler heads shall comply with NFPA 13 as regulated by the Fire Department. PC-830-97 **CJW**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes9/29/1998 9/29/1998 DONE
(F) Reprint permit  8/5/1998 PASS
INSP - Final7/16/19987/16/19987/16/1998APASS
Details
07/16/98 333 - FNL -OK FINAL
(F) Reprint permit  7/16/1998
Permanent Occupancy 7/15/19987/15/1998 DONE
Details
Permanent occupancy  7/15/1998 PASS
Perm. Occ. Cert. #7314 issued 7-15-98 to the Grove Hotel Gift Shop.
CHANGE STATUS TO (I)  7/15/1998
INSP - Final7/7/19987/7/19987/7/1998 PART
Details
/ / 333 - PROFIT MEETING
(F) Reprint permit  6/23/1998
INSP-Final Inspection6/18/19986/18/19986/18/1998PPASS
DetailsRick Jackson
occ approved
CHANGE STATUS TO (F)  6/15/1998 FEES
ADD VALUE FROM MECH AND ELE LH
INSP - Final6/11/19986/11/19986/11/1998AFAIL
Details
06/11/98 333 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
Temporary occupancy  5/11/1998 PASS
Temp. Occ. Cert. #3611 issued 5-11-98 to the Grove Hotel gift shop.
INSP-Final Inspection4/17/19984/17/19984/17/1998PPASS
DetailsRick Jackson
occ approved
90 day tracking............. 12/29/19973/29/1998
Plan assigned to (CJW)1/9/1998 3/6/1998 PASS
DetailsCarl Westfall
03/06/98 09:13:16 CJW - this action updated by action script from <<>> in Case No. BLD97-3787
Print permit w/o conditions  3/6/1998
Issue PAID IN FULL permit  3/6/1998
PLANS/APPL TAKEN TO FRONT DESK  3/6/1998 PASS
testing condition printout  3/6/1998
Plan Reviewer's activity  3/6/1998 PASS
After resubmittal review, drawings approved, with conditions, as noted and attached to the approved drawings.
Print Occupancy Form  3/6/1998
Inspection Record Card- Bld  3/6/1998
Telephone call  3/6/1998
called april and gave her $ amount
Plan resubmittals received  2/26/1998
Resubmittal was lost until March 6, 1998.
Routing - FIRE1/21/1998 1/21/1998 PASS
Plan Reviewer's activity  1/20/1998
UBC plan check started January 20, 1998 and finished January 21, 1998. Response required from applicant. See conditions list.
Plan routing begun/TENANTS  1/9/1998
PLAN CHECK and FIRE.
Plan assigned to (MYS)12/29/1997 1/9/1998
DetailsMarlene Southard
Plans ACCEPTED BY PLAN CHECK  1/7/1998 PASS
Plans ACCEPTED BY PLAN CHECK  12/30/1997 HOLD
NEED NEW PLANS STAMPED AND SIGNED BY IDAHO ARCHITECT. MINIMUM SIZE OF PLANS IS 18X24, ADVISED APRIL. 01-7-98 CONTACTED APRIL OF SKIP HYDE TO LET HE KNOW I NEED A KEY PLAN 1-7-98 RECEIVED KEY PLAN. ROUTED TO MARLENE. KMM
Recd Pcfee & Taken To Pln CK  12/29/1997 PEND
Application received  12/29/1997
Routing - PLAN CHECK1/21/1998