Case Summary (BLD) | | | 4/10/2014 | | DONE |
|
|
|
|
Fee Review-notes | 7/22/1998 | | 11/19/1998 | | DONE |
|
|
|
VALUES OVER ON SHELL AND CORE AND UNDER ON TI
|
INSP - Final | 9/14/1998 | 9/14/1998 | 9/14/1998 | | PASS |
Jim Storey
|
|
|
/ / 301 - FNL -OK FINAL
|
Letter of compliance | | | 9/14/1998 | | PASS |
|
|
|
Letter of Compliance #15975 issued 9-14-98.
|
INSP-Final Inspection | 9/10/1998 | 9/10/1998 | 9/10/1998 | P | PASS |
Rick Jackson
|
|
|
occ approved
|
Temporary occupancy | | | 6/19/1998 | | PASS |
|
|
|
Temp. Occ. Cert. #3639 issued 6-19-98 to Power Foods, Inc.
|
INSP-Final Inspection | 6/15/1998 | 6/15/1998 | 6/15/1998 | A | PART |
Rick Jackson
|
|
|
tested tampers for sprinkler - okay. knox box installed and duct detectors shut downs - okay. fire lanes painted on 6/16.
|
INSP - Final | 6/9/1998 | 6/10/1998 | 6/10/1998 | A | PART |
Jim Storey
|
|
|
06/10/98 301 - final ok pending fire insp. isues...
|
INSP-Final Inspection | 6/9/1998 | 6/9/1998 | 6/9/1998 | P | PART |
Rick Jackson
|
|
|
as per 409 2:30 TIME/TRACY ###-#### tampers retest, AHU shutdown, etc. c/n issued
|
Code Occupancy Approval | | | 6/3/1998 | | PASS |
|
|
|
SITE INSPECTION SHOWED SEVERAL TREES MISSING ALONG WEST SIDE OF PROJECT, I CALL PLANNING (TEMPRA WILSON) AND INFORMED HER THAT THIS AREA WAS UNSUITABLE FOR TREES DUE TO THE GRADE AND THAT NO OTHER BUILDING SITE WAS AVAILABLE TO THE WEST, TREES ARE NOT REQUIRED PER TEMPRA. ALL OTHER CONDITIONS WERE MET, FINAL OCCUPANCY SIGNED OFF.
|
INSP - Final | 5/21/1998 | 5/22/1998 | 5/26/1998 | P | NR |
Russ Owen
|
|
|
05/22/98 407 - not ready,need other inspections. plumbing,fire
|
PubWorks Occupancy Approval | | | 5/21/1998 | | DONE |
|
|
|
Drainage project complete 05/21/98. No occupancy card to sign. D.Hagen
|
INSP - Framing/Rough-in | 5/7/1998 | 5/7/1998 | 5/8/1998 | P | PART |
Russ Owen
|
|
|
05/07/98 407 - inside non-bearing walls ok. need stell joist lay out app
|
INSP-Sprinkler Rough-in/Hydro | 5/6/1998 | 5/6/1998 | 5/6/1998 | P | PART |
Rick Jackson
|
|
|
esfr sprinkler heads obstructed by ductwork
|
90 day tracking............. | | 12/31/1997 | 3/31/1998 | | PEND |
|
|
|
|
INSP - Foundation | 3/24/1998 | 3/24/1998 | 3/25/1998 | P | PART |
Russ Owen
|
|
|
03/24/98 407 - this foundation is required to have special inspector app to reports.
|
INSP - Foundation | 3/20/1998 | 3/23/1998 | 3/24/1998 | A | PART |
Russ Owen
|
|
|
03/23/98 407 - this job is under special inspection.Subject to the repor
|
INSP - Foundation | 3/23/1998 | 3/23/1998 | 3/23/1998 | P | PART |
|
|
|
03/23/98 333 - pending si reports
|
INSP - Foundation | 3/19/1998 | 3/19/1998 | 3/20/1998 | P | PART |
Russ Owen
|
|
|
03/19/98 407 - this requires special inspection,pending reports.
|
INSP - Foundation | 3/18/1998 | 3/18/1998 | 3/18/1998 | P | PART |
Russ Owen
|
|
|
03/18/98 407 - this requires special inspection subject to report.
|
Issue PAID IN FULL permit | | | 3/18/1998 | | |
|
|
|
|
Plan assigned to (M_O) | 1/5/1998 | | 3/17/1998 | | PASS |
|
|
|
|
Telephone call | | | 3/17/1998 | | PEND |
|
|
|
PUT IN CALL TO CH2MHILL AND GOT VERBAL OK FOR STRUCTURAL AT 1:20PM. MO
|
Telephone call | | | 3/17/1998 | | PEND |
|
|
|
PUT CALL IN TO CH2MHILL AT 11:45 AM REGARDING STATUS OF REVIEW. COULD NOT GET THROUGH TO ANYONE. WILL CALL BACK AFTER 1:00 PM. MO
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/17/1998 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 3/13/1998 | | 3/17/1998 | | PASS |
|
|
|
RESUBMITTALS FAXED TO CH2MHILL FOR TWO REMAINING ITEMS. MO
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/17/1998 | | PASS |
|
|
|
|
Print Occupancy Form | | | 3/17/1998 | | |
|
|
|
|
Telephone call | | | 3/17/1998 | | |
|
|
|
TALKED TO SHANA TO VERIFY PLANS ARE READY
|
Inspection Record Card- Bld | | | 3/17/1998 | | |
|
|
|
|
Telephone call | | | 3/16/1998 | | PEND |
|
|
|
PUT CALL IN TO HOWIE HENRICKSON AT CH2MHILL IN REGARDS TO STATUS OF REVIEW. HOWIE WAS NOT IN THE OFFICE TODAY. WILL TRY TOMORROW. MO
|
Routing Off Site - STRUCTURAL | 3/2/1998 | | 3/13/1998 | | FAIL |
|
|
|
REVISED PLANS SUBMITTED 3-2-98 SENT OUT TO CH2MHILL VIA PDQ. CALCS FOR WALL PANELS ILLEGIBLE ENGINEER NEEDS ROOF PLAN DEPICTING SMOKE VENTS.MO ROOF PLAN SENT TO CH2MHILL 3-11-98. MO. 3-13-98 RECEIVED ONE COPY OF PLAN OF SMOKE VENTS ON FOOR ONE STRUCTURAL REVIEW LETTER BY CH2MHILL DATED 3-12-98 ROUTED TO MIKE O. CORRECTIONS FAXED TO NEIL NELSON AT ESI 3-13-98.MO.
|
Plan resubmittals requested | | | 3/13/1998 | | PEND |
|
|
|
ADDITIONAL CORRECTIONS FOR STRUCTRUAL FAXED TO NEIL NELSON AT ESI 3-13-98. MO.
|
Plan resubmittals received | | | 3/13/1998 | | PEND |
|
|
|
KEITH JONES FAXED OVER RESPONSE TO TWO REMAINING ITEMS. INFORMATION WAS FAXED TO CH2MHILL FOR REVIEW. MO
|
Plan Reviewer's activity | | | 3/11/1998 | | PEND |
|
|
|
CALLED STRUCTURAL ENGINEER REGARDING STATUS OF PLAN REVIEW OF RESUBMITTALS. REVIEW WAS STARTED BUT CALCULATIONS PROVIDED BY WALL PANEL MANUFACTURE FABCON ARE ILLEGIBLE. ADDITIONAL CORRECTIONS ARE PENDING UPON COMPLETETION OF REVIEW ACCORDING TO CH2MHILL. MO
|
Telephone call | | | 3/11/1998 | | PEND |
|
|
|
ESI CONTACTED AT 1:45 PM TALKED TO RALINE ABOUT PROVIDING LEGIBLE CALCS ASAP. MO
|
Routing Off Site - A.C.H.D | 1/30/1998 | | 3/10/1998 | | PASS |
|
|
|
ROUTED TO ACHD VIA NEIL NELSON FOR FOUNDATION ONLY AT THIS TIME. KMM MET WITH LARRY SAIL AT BUILDING DEPT. REGARDING AGREEMENT PROVIDED BY ESI FROM ACHD WHICH IS SIGNED BY SUSAN EASTLAKE AND IS DATED JANUARY 23, 1998. AGREEMENT ALLOWS PERMIT TO BE ISSUED WITH FEES TO BE COLLECTED BY ACHD AT A LATTER DATE. THIS AGREEMENT WAS PRESENTED TO LARRY SAIL AND VERIFIED AS ACCURATE. LARRY SAIL STATED THAT IT WAS OK TO ISSUE THE PERMIT FOR THE BUILIDNG WITHOUT FEES COLLECTED BY THE CITY AT THIS TIME. MO.
|
Routing - FIRE | 3/10/1998 | | 3/10/1998 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 3/9/1998 | | 3/10/1998 | | PASS |
|
|
|
|
Plan resubmittals received | | | 3/9/1998 | | PEND |
|
|
|
PLAN RESUBS RECEIVED FROM ATWOD, HINZMAN, JONES.
|
Meeting | | | 3/5/1998 | | PEND |
|
|
|
MET WITH ARCHITECT, FLOYD VARLEY, JEFF JONES AND TIM HOGALND AND MIKE OTTO REGARDING SMOKE AND HEAT VENTS AND PROJECT STATUS.
|
Plan resubmittals received | | | 3/2/1998 | | |
|
|
|
RECEIVED 2 COPIES OF FAB CON REVISED CALCULATIONS. 2 COPIES OF REVISED SHOP DRAWINGS FOR WALL PANELS. ROUTED TO MIKE OTTO.
|
Plan Reviewer's activity | | | 2/25/1998 | | PEND |
|
|
|
NOTICE FAXED TO KEITH JONES PER CITY CONSULTING ENGINEER TO PROVIDE PLANS AND CALCULATIONS FOR THE WALL PANELS FOR STRUCTRUAL REVIEW. MO
|
Routing Off Site - STRUCTURAL | 2/10/1998 | | 2/16/1998 | | PEND |
|
|
|
REVISED PLANS SENT TO CH2MHILL VIA PDQ
|
Plan resubmittals received | | | 2/11/1998 | | |
|
|
|
RECEIVED 2 COPIES OF 1. SITE PLANS SHOWING PROPERTY LINES AND DIMENSIONS FROM PROPERTY LINE TO BUILDING ADDTION. 2. FLOOR PLAN OF WAREHOUSE ADDITION. 3. PLUMBING PLAN SHOWING UNDER SLAB PLUMBING. ROUTED TO MIKE OTTO.
|
Plan resubmittals received | | | 2/9/1998 | | |
|
|
|
THREE SETS OF STRUCTRUAL SHEETS S-1 THROUGH S-5 ALONG WITH THREE SETS OF REVISED CALCS AND TWO WRITTEN RESPONSES FROM THE STRUCTURAL ENGINEER RECEIVED 2:00PM 2-09-98. ONE SET OF CALCS AND PLANS WITH RESPONSE SENT TO CH2MHILL FOR REVIEW. MO.
|
Plan resubmittals received | | | 2/9/1998 | | PEND |
|
|
|
RESUBMITTALS RECEIVED FROM GEORGE BLEECHA AND ATWOOD HINZMAN JONES. 3 SETS OF S1 THROUGH S5 DATED 2/6/98 DAR 2/9/98
|
Plan Reviewer's activity | | | 2/9/1998 | | PEND |
|
|
|
sent letter to architect requesting second time that additional sheets be provided to complete foundation only permit as requested. mo
|
Routing Off Site - STRUCTURAL | 1/21/1998 | | 2/3/1998 | | FAIL |
|
|
|
01-21-98 RECEIVED 2 FULL SETS FOR ENG. ROUTED TO MIKE O. TO GIVE TO HOWIE OF CH2MHILL FOR OUTSIDE ENGINEERING. KMM 2-3-98 RECEIVED 1 COPY OF STRUCTURAL REVIEW LETTER BY CH2MHILL DATED 2-2-98. ROUTED TO MIKE OTTO. KMM 2-3-98-CORRECTIONS FAXED TO NEIL NELSON AT ESI AND MAILED TO ARCHITECT WHO WAS UNABLE TO RECEIVE FAX THIS DATE.MO
|
Plan resubmittals requested | | | 2/3/1998 | | FAIL |
|
|
|
STRUCTRUAL CORRECTIONS FAXED TO NEIL NELSON AT ESI AND MAILED THIS DATE TO ARCHITECT. 2-3-98 MO.
|
Telephone call | | | 1/30/1998 | | |
|
|
|
RECEIVED CALL FROM NEIL NELSON AT ESI REQUESTING NOW THE FOUNDATION ONLY PERMIT. NELSON TOLD THAT FIRE DEPT. APPROVAL IS REQUIRED AND STRUCTRUAL REVIEW MUST BE COMPLETED. ACHD PKG. SENT BACK TO ACHD FOR SIGN-OFF OF FOUNDATION ONLY. MO
|
Routing - FIRE | 1/23/1998 | | 1/26/1998 | | FAIL |
|
|
|
PACKAGE #1
|
Plan resubmittals requested | | | 1/22/1998 | | FAIL |
|
|
|
corrections maield and faxed to architect. mo
|
Routing - PLAN CHECK | 1/13/1998 | | 1/22/1998 | | FAIL |
|
|
|
Corrections mailed and faxed to architect. MO
|
Plans ACCEPTED BY PLAN CHECK | | | 1/21/1998 | | PASS |
|
|
|
RECEIVED 2 COPIES OF FULL SETS OF CONSTRUCTION DOCUMENTS. ROUTED TO MIKE O. MIKE WILL GIVE TO HOWIE OF CH2MHILL.
|
Routing Off Site - A.C.H.D | 1/2/1997 | | 1/16/1998 | | PEND |
|
|
|
PACKAGE #2 AM WAITING TO RECEIVE THIS PACKAGE FROM NEIL NELSON. I CONTACTED HIM 12-31-97 OF THIS NEED. ###-#### RECEIVE 1-2-98 ACHD SET. WILL ROUTE TO ACHD PER NEIL NELSON. 1-16-98 approved for grading only. routed to mike otto
|
Routing - PUBLIC WORKS | 1/12/1998 | | 1/13/1998 | | PASS |
|
|
|
PACKAGE #1
|
Routing - PLANNING | 1/9/1998 | | 1/12/1998 | | PASS |
|
|
|
PACKAGE #1 X-REF: DRH97-0243. APPROVED BY MGS.
|
Routing - PLUMBING | 1/7/1998 | | 1/9/1998 | | PASS |
|
|
|
PACKAGE #1
|
Routing - PUBLIC WORKS | 12/31/1997 | | 1/7/1998 | | FAIL |
|
|
|
PACKAGE #1 NEEDS DRAINAGE REVISION PER BM
|
Plan assigned to (JCM) | 12/31/1997 | | 1/5/1998 | | PASS |
John Menard
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 1/2/1998 | | PASS |
|
|
|
|
Plan assigned to (MYS) | 12/31/1997 | | 12/31/1997 | | |
Marlene Southard
|
|
|
|
Application received | | | 12/31/1997 | | |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 12/31/1997 | | PEND |
|
|
|
RECEIVED 1. TWO SEPARATE SUBMITTALS OF PACKAGE #1. 2. TWO SEPARATE SUBMITTALS OF CIVIL SHEET WITH A LETTER TO JIM WYLEE AND ONE DRAINAGE CALCS. PACKET. I PUT THESE WITH PACKAGE #1 3. TWO SETS OF STRUCTRUAL CALCS. I CONTACTED NEIL NELSON TO REQUEST AN ACHD SET OF PLANS. HE AGREED TO DO SO. WHEN I RECEIVE THEM I WILL ROUTE PACKAGE #2 TO ACHD 4. NO SOILS REPORT. I REQUEST ONE OF THESE ALSO 5. NO PROJECT MANUALS 01-02-98 RECEIVED ACHD SET AND SOILS REPORT. KMM 01-21-98 RECEIVED 2 FULL COPIES OF PLANS. ROUTED TO MIKE O. MIKE WILL GIVE TO HOWIE OF CH2MHILL. KMM
|
Received Certificate of Value | | | 12/31/1997 | | PASS |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 12/31/1997 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/31/1997 | | PEND |
|
|
|
|
Routing Off Site - STRUCTURAL | 3/19/1998 | | | | |
|
|
|
RECEIVED 1 COPY OF RESUBMITTAL NO. 1 WALL PANEL DESIGN FOR WAREHOUSE ADDITION OF POWER BAR IN. STRUCTURAL REVIEW LETTER BY CH2MHILL DATED 3-18-98. ROUTED TO MIKE O.
|