Permit Information
Permit NumberBLD98-00005
StatusFinaled
Name NEW IMAGES ACADEMY OF BEAUTY
Site Address 1270 S VINNELL WAY
Project NameNEW IMAGES ACADEMY
Customer Number 
ePlanReviewNo
Description
NEW IMAGES ACADEMY OF BEAUTY * THE PROJECT CONSISTS OF CONSTRUCTION OF A NEW 13,900 SQ. FT. VOCATIONAL TRAINING CENTER WITH TENANT LEASE SPACE AND SITE FACILITIES. DRH-97-0135 CU#63-97 PC#001-98 Type of construction changed from V-1 to II-N and framing system changed braced walls & steel roof under "plan modification" reviewed by fire dept. and plan review. ads
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  6/9/2004  
Receive PAYMENT IN FULL  3/24/1999
Permanent Occupancy 3/19/19993/19/1999 DONE
Details
Permanent occupancy UNPAID FEE  3/19/1999 PASS
Perm. Occ. Cert. #7695 issued 3-19-99 to New Images Academy of Beauty.
(F) Reprint permit  3/2/1999
PubWorks Occupancy Approval  2/10/1999 DONE
Drainage project complete 02/10/99. R.Rokovitz
INSP - Final2/8/19992/8/19992/8/1999PPASS
Details
02/08/99 338 - made ok for perm and occ cert
INSP-Final Inspection2/1/19992/2/19992/2/1999APASS
DetailsJoe Tawney
02/02/99 406 - ###-#### Tony REINSP OK FOR PERM OCC ì
(F) Reprint permit  1/25/1999
(F) Reprint permit  1/25/1999
CHANGE STATUS TO (F)  1/25/1999 FEES
additional values lh
(F) Reprint permit  1/25/1999
INSP - Final1/15/19991/15/19991/15/1999 PART
DetailsJoe Tawney
/ / 406 - ADV TONY CONTRACTOR THAT TEMP OCC ABOUT TO EXPIRE. NOT SIGNE
Code Occupancy Approval  10/21/1998 FAIL
Bonded for unfinished landscaping $5,355.35 - Temporary signed. They need to go back to Planning for Modification if they are not going to put the Southwest Planter (Vinnell St side) at the building in per plans (DRH97-0135)
Temporary occupancy  10/21/1998 PASS
Temp. Occ. Cert. #3722 issued 10-21-98 to New Images Academy of Beauty.
INSP - Final10/20/199810/20/199810/20/1998PPART
Details
10/20/98 338 - TONY ###-#### made ok for temp occ. confirmed bond place
INSP-Final Inspection10/19/199810/19/199810/19/1998PPART
DetailsJoe Tawney
10/19/98 406 - tony- ###-#### fn fire insp REINSP OK FOR TEMP OCC LED'S FOR AHU
INSP-Final Inspection10/15/199810/16/199810/16/1998AFAIL
DetailsJoe Tawney
10/16/98 406 - TONY-###-#### NEW IMAGES FINAL FAIL
INSP - Framing/Rough-in10/2/199810/5/199810/5/1998PPASS
Details
made ok to drop in the ceiling tiles
INSP - Framing/Rough-in9/3/19989/3/19989/3/1998APASS
DetailsWes Worcester
09/03/98 342 - TONY ###-#### ì
INSP - Foundation6/26/19986/26/19986/26/1998PPART
DetailsCarl Dependahl
MTI is coming out Tony ###-#### part; met w/ bldr...mti onsite...pending spec insp report.
INSP - Foundation6/22/19986/24/19986/24/1998PPART
DetailsCarl Dependahl
06/24/98 340 - footing tony ###-####; part, ext ftg's per 6-10 revision, spec insp report. 338 area
INSP - Conference6/23/19986/23/19986/23/1998 PASS
DetailsCarl Dependahl
/ / 340 - w/ tony of steed, ftg ready noon 6-24
(F) Reprint permit  6/22/1998
Print Pending Permit.LaserJet4  6/19/1998
Print Occupancy Form  6/19/1998
Print Occupancy Form  6/19/1998
Inspection Record Card- Bld  6/19/1998
Print Pending Permit.LaserJet4  6/19/1998
Inspection Record Card- Bld  6/19/1998
Plan Reviewer's activity  6/19/1998 PASS
Plan Modifications approved. No changes were made to the exterior appearance or the location of the building.
Routing Off Site - STRUCTURAL6/11/1998 6/18/1998
plan resubs dated 6-10-98 sent to Atwood Hinzman Jones via PDQ. 6/18/98 received reply from atwood hinzman jones
Plan resubmittals received  6/10/1998 PEND
RECEIVED RESUBS FROM T.J. SCOFIELD, PASSED SAME TO ARLAN SMITH
Routing Off Site - STRUCTURAL5/20/1998 6/1/1998
RESUBS SENT TO RILEY AT ATWOOD, HINZMAN, JONES. DAR-- RECEIVED RESUBS BACK FROM ATWOOD HINZMAN JONES FORWARDED COMMENTS AND PLANS TO ARLAN SMITH 6/1/98-------------------------- --------------------------------------------------------- --------------------------------------------------------- --------------------------------------------------------- --------------------------------------------------------- --------------------------------------------------------- --------------------------------------------------------- --------------------------------------------------------- --------------------------------------------------------- --------------------------------------------------------- --------------------------------------------------------- --------------------------------------------------------- --------------------------------------------------------- --------------------------------------------------------- --------------------------------------------------------- --------------------------------------------------------- --------------------------------------------------------- --------------------------------------------------------- --------------------------------------------------------- --------------------------------------------------------- --------------------------------------------------------- --------------------------------------------------------- --------------------------------------------------------- --------------------------------------------------------- --------------------------------------------------------- --------------------------------------------------------- --------------------------------------------------------- --------------------------------------------------------- --------------------------------------------------------- --------------------------------------------------------- ---------------
(F) Reprint permit  4/29/1998
Issue PAID IN FULL permit  4/28/1998
Telephone call  4/27/1998 MESS
LEFT MESSAGE WITH DAN ELSON THAT PLANS ARE READY
Telephone call  4/9/1998 PASS
LEFT MESSAGE WITH TERRY SCOFFIELD TO CALL ME REGARDING PLANS
90 day tracking............. 1/5/19984/5/1998
Plan assigned to (ADS)1/6/1998 3/20/1998 PASS
Details
PLANS/APPL TAKEN TO FRONT DESK  3/20/1998 PASS
Print Occupancy Form  3/20/1998
Inspection Record Card- Bld  3/20/1998
Telephone call  3/20/1998
CALLED TERRY SCHOFIELD/FAXED OVER FEE BREAKDOWN
Routing - PLAN CHECK3/6/1998 3/20/1998 PASS
Plans approved as noted. ads
Routing Off Site - STRUCTURAL3/18/1998 3/19/1998
CONTACTED PDQ TO TAKE REVISED PLANS OUT TO ATWOOD HINZMAN JONES. ROUTED 1 COPY OF SHEETS S-1 AND S-5 PLUS STRUCTURAL CALC. POSTED A NOTE ON PLANS REQUESTING PLANS BE RETURNED WITH REVIEW COMMENTS. KMM 3-20-98 RECEIVED ONE RESPONSE LETTER FROM ATWOOD HINZMAN AND JONES DATED 3-19-98. RECEIVED ORIGINAL PLANS PLUS RESUBMITALS. ROUTED TO ARLAN. KMM
Plan resubmittals received  3/18/1998
RECEIVED 2 COPIES OF STRUCTURAL DRAWINGS, S-1 AND S-5. 2 COPIES OF STRUCTURAL CALCULATIONS. ROUTED TO ARLAN SMITH.
Routing - PLUMBING11/10/19982/25/19982/25/1998 PART
THIS IS AN EXAMPLE FOR jERRY, BUT HE COULD PUT A PERTINANT NOTE IN HERE ON ONE OF HIS REVIEWS IF HE SO CHOOSE AND i COULD QUICKLY ACCESS IT FOR REVIEW FOR A FIELD INSPECTOR WHEN HE IS ON THE JOB INSPECTING AND LOOKING AT THE APPROVED PLANS.
Routing Off Site - A.C.H.D1/6/1998 2/20/1998 PASS
PACKAGE #2 CONTACTED TERRY SCOFIELD AT ###-#### TO TAKE PLANS OUT TO ACHD IMPACT FEES PAID NEED COPY OF FEES RECEIPT IMPACT FEES RECEIPT #98-0841 FEES PAID. COPIES MADE AND ROUTED TO ARLAN.
Routing - PUBLIC WORKS2/19/1998 2/20/1998 PASS
Plan Reviewer's activity  1/23/1998 FAIL
Initial plan review comments faxed to T J Scofield.
Routing - PLUMBING1/21/1998 1/21/1998 PASS
PACKAGE #1
Routing - PLANNING1/14/1998 1/21/1998 PASS
PACKAGE #1 CUP97-0063, DRH97-0135. APPROVED BY JH & MGS.
Routing Off Site - STRUCTURAL1/6/1998 1/20/1998
PACKAGE #3 CONTACED PDQ TO TAKE PLANS OUT TO ATWOOD HINZMAN AND JONES. 1-20-98 RECEIVED PLANS (PACKAGE #3) STRUCTURAL CALCULATIONS AND ONE COPY OF THE STRUCTURAL PLAN CHECK REVIEW COMMENTS. ROUTED TO ARLIN SMITH.
Plan resubmittals requested  1/14/1998
CU conditions 3a, 3b, 3c have not been met.
Routing - PUBLIC WORKS1/6/1998 1/14/1998 FAIL
PACKAGE #1 REQUIRES DRAINAGE PLAN REVISION.
Plans ACCEPTED BY PLAN CHECK  1/6/1998 PASS
PLANS RECEIVED 1. PACKAGE #1 TWO COPIES OF FULL SETS OF PLANS. TWO FULL SPECS. TWO STRUCT. CALCS. THREE DRAINAGE CALCS 2. PACKAGE #2 TWO COPIES OF ACHD SETS. 3. PACKAGE #3 ONE COPY OF OUTSIDE ENG. WHICH WILL BE SENT TO ENGINEERS. ONE STRUCT. CALC.
Plan routing begun/NEW & ADDTN  1/6/1998 PASS
Plan assigned to (MYS)1/5/1998 1/6/1998
DetailsMarlene Southard
Recd Pcfee & Taken To Pln CK  1/5/1998
Application received  1/5/1998
Routing - FIRE3/2/1998 3/5/1909 PASS
PACKAGE #1
Routing - PLAN CHECK1/22/1998  
PACKAGE #3 PLANS AND STRUCTURAL PLAN CHECK REVIEW COMMENTS AND STRUCTURAL CALCS. KMM