Permit Information
Permit NumberBLD98-00029
StatusFinaled
Name SCOTT GROW
Site Address 5907 W CLINTON ST
Project NameWEIL J FOODSERVICE
Customer Number 
ePlanReviewNo
Description
WEIL J.FOODSERVICE COMPANY * TO CONSTRUCT A 2,940 SQ. FT. FREEZER ADDITION. Wall and roof are "R-Control" OSB/foamed plastic insulation sandwich panels PC#006-98 ads
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  4/29/1999 PASS
Letter of Compliance #16565 issued 4-29-99.
INSP - Final4/26/19994/27/19994/27/1999APASS
DetailsCarl Dependahl
04/27/99 340 - SIGNED COPY, CARD TO OWNERBill ###-####
Code Occupancy Approval  4/22/1999 PASS
Meets compliance - Signed Final - Release Bond.
INSP - Final4/20/19994/21/19994/21/1999AFAIL
DetailsCarl Dependahl
04/21/99 340 - ###-#### BILL//FINAL; need p&z 1st.
Temporary occupancy  11/13/1998 PASS
Temp. Occ. Cert. #3744 issued 11-13-98 to J. Weil Foodservice Company
Code Occupancy Approval  11/12/1998 FAIL
Bonded for the Parking lot Paving - $10,000.00/CZC98-0003
INSP-Final Inspection10/30/199811/2/199811/2/1998APASS
DetailsJoe Tawney
11/02/98 406 - bob ###-#### final fire REINSP OK FOR PERM OCC
INSP - Final10/22/199810/22/199810/23/1998PPART
Details
10/22/98 338 - signed the temp col of the occ req card told them to go d
INSP - Final10/21/199810/21/199810/22/1998PNH
Details
10/21/98 338 - out of time will recall for 10/23/98
INSP-Final Inspection10/20/199810/21/199810/21/1998APART
DetailsJoe Tawney
10/21/98 406 - ROGER ###-#### REINSP OK FOR TEMP OCC OF FREEZER ROOM SUPRV LABELING PIPES
INSP-Final Inspection9/21/19989/22/19989/22/1998AFAIL
DetailsJoe Tawney
09/22/98 406 - jennifer ###-#### FINAL FAIL WIRE VLV TAMPER SWITCH OBSTRUCTED SPKLR HEADS
INSP-Final Inspection9/11/19989/14/19989/13/1998ANR
Details
09/14/98 338 - OTH-OTHER AGENCIES NOT APPROVED
INSP-Final Inspection8/28/19988/31/19988/31/1998APART
DetailsJoe Tawney
08/31/98 406 - SHELLY ###-#### OK ON SPKLR ROUGH IN AND HYDRO TEST
INSP - Framing/Rough-in8/13/19988/13/19988/13/1998 PART
Details
08/05/98 338 - ok to cover
INSP - Framing/Rough-in8/13/19988/13/19988/13/1998 PART
Details
08/05/98 338 - ok to cover
INSP - Foundation7/21/19987/21/19987/23/1998PPASS
Details
07/21/98 338 - made ok to pour all footings and walls are complete
INSP - Foundation6/30/19986/30/19986/30/1998PPART
Details
06/30/98 338 - SLABS NOT INSPECTED BY ME
INSP - Framing/Rough-in6/8/19986/8/19986/8/1998PPART
Details
06/08/98 338 - made ok to pour r-bar placed in the west and south walls
INSP - Framing/Rough-in5/15/19985/15/19985/15/1998PPART
Details
05/15/98 338 - MADE OK FOR THE FREEZER EAST TO WEST WALLS ONLY
INSP - Foundation4/30/19984/30/19984/30/1998PPASS
Details
MADE OK R-BAR PLACED
INSP - Foundation4/30/19984/30/19984/30/1998 PASS
Details
04/30/98 338 - FRMS-OK FORMS-REBAR
INSP - Foundation4/30/19984/30/19984/30/1998 PASS
Details
04/30/98 338 - FRMS-OK FORMS-REBAR
INSP - Foundation4/27/19984/28/19984/28/1998APART
Details
04/28/98 338 - north wall
INSP - Conference4/21/19984/21/19984/21/1998 PART
Details
/ / 338 - made k general ctr confirming conversation with Eng of earli
INSP - Conference4/21/19984/21/19984/21/1998 PART
Details
/ / 338 - with eng on design concrete 3000 is not reqired 10 min on ph
INSP - Foundation4/17/19984/20/19984/20/1998ANR
Details
04/20/98 338 - NOT READY NEED SP INSP FOR DESIGN LOADS OF 3000 PSI PER C
INSP - Foundation4/15/19984/16/19984/16/1998ANR
Details
04/16/98 338 - 2nd time on jobsite without the approved plans on site c/
INSP - Foundation4/14/19984/15/19984/15/1998PNR
Details
04/15/98 338 - need to have approved plans on jobsite for proper inspect
Issue PAID IN FULL permit  4/9/1998
Telephone call  4/8/1998
CALLED AND GAVE BRAD $ AMOUNT
PLANS/APPL TAKEN TO FRONT DESK  4/8/1998 PASS
Routing - PUBLIC WORKS4/7/1998 4/8/1998 PASS
Routing - PLAN CHECK4/8/1998 4/8/1998 PASS
Print Occupancy Form  4/8/1998
Inspection Record Card- Bld  4/8/1998
Plan assigned to (ADS)1/14/1998 4/8/1998 PASS
Details
90 day tracking............. 1/7/19984/7/1998 PEND
Routing - PLAN CHECK3/26/1998 4/2/1998 PASS
Telephone call  4/1/1998
Spoke to Brad Wheeler this AM. I told him that we still needed information on the thermal barrier inside the building. We also need drainage plan approval. He said the plan had been submitted. Brian Murphy phoned him about this later this same morning. The resubmittal recieved 30Jan only showed the location of existing drains and contained no calculations. It was not perceived as a drainage resubmittal.
Routing - PLAN CHECK2/5/1998 3/26/1998 FAIL
Routing - FIRE3/25/1998 3/26/1998 PASS
Routing - FIRE2/2/1998 2/5/1998 FAIL
Plan Reviewer's activity  1/30/1998 FAIL
Foam plastic in walls & ceiling need to be seperated from the interior by a thermal barrier. Notice faxed to Brad Wheeler. This was also explained to him in a phone call today.
Plan resubmittals received  1/23/1998 PEND
RECEIVED RESUBS FROM STAN COLE. STRUCTURAL CALCULATIONS AND PLANS. 2 SETS EACH.
Plan Reviewer's activity  1/22/1998 FAIL
Initial plan review report faxed to Brad Wheeler. More information is needed to complete the review.
Routing - PLANNING1/13/1998 1/20/1998 PASS
X-REF: CZC98-0003
Plan assigned to (JCM)1/8/1998 1/14/1998 PASS
DetailsJohn Menard
Routing - PUBLIC WORKS1/9/1998 1/13/1998 FAIL
REQUIRES DRAINAGE PLAN. PER BRIAN M. KMM
Routing Off Site - A.C.H.D1/8/1998 1/9/1998 PASS
CONTACTED BRAD WHEELER AT###-#### TO TAKE PLANS OUT TO ACHD NO ACHD FEES DUE. PER MGG
Routing Off Site - C.D.H1/8/1998 1/8/1998 PASS
BUD JUE DOING HIS REVIEW AT THIS TIME. APPROVED WITH CONDITIONS ATTACHED TO THE PLANS
Plans ACCEPTED BY PLAN CHECK  1/8/1998 HOLD
I SPOKE WITH ROGER JONES ABOUT A DR. HE STATED THAT A DR WOULD BE NEEDED. I CONTACTED BRAD WHEELER AT ###-#### OF THIS NEED AND TOLD HIM TO GET IN TOUCH WITH ROGER. I ALSO TOLD HIM I CANNOT ROUTE UNTIL HE RECEIVES HIS DR# BUD JUE WILL PROCEED WITH CDH'S REVIEW. KMM
Plan assigned to (MYS)1/7/1998 1/8/1998
DetailsMarlene Southard
Plan routing begun/NEW & ADDTN  1/8/1998 HOLD
SEE ACTION 007 HOLD
Received Certificate of Value  1/8/1998 PASS
Recd Pcfee & Taken To Pln CK  1/7/1998 PEND
Application received  1/7/1998