Letter of compliance | | | 4/29/1999 | | PASS |
|
|
|
Letter of Compliance #16565 issued 4-29-99.
|
INSP - Final | 4/26/1999 | 4/27/1999 | 4/27/1999 | A | PASS |
Carl Dependahl
|
|
|
04/27/99 340 - SIGNED COPY, CARD TO OWNERBill ###-####
|
Code Occupancy Approval | | | 4/22/1999 | | PASS |
|
|
|
Meets compliance - Signed Final - Release Bond.
|
INSP - Final | 4/20/1999 | 4/21/1999 | 4/21/1999 | A | FAIL |
Carl Dependahl
|
|
|
04/21/99 340 - ###-#### BILL//FINAL; need p&z 1st.
|
Temporary occupancy | | | 11/13/1998 | | PASS |
|
|
|
Temp. Occ. Cert. #3744 issued 11-13-98 to J. Weil Foodservice Company
|
Code Occupancy Approval | | | 11/12/1998 | | FAIL |
|
|
|
Bonded for the Parking lot Paving - $10,000.00/CZC98-0003
|
INSP-Final Inspection | 10/30/1998 | 11/2/1998 | 11/2/1998 | A | PASS |
Joe Tawney
|
|
|
11/02/98 406 - bob ###-#### final fire REINSP OK FOR PERM OCC
|
INSP - Final | 10/22/1998 | 10/22/1998 | 10/23/1998 | P | PART |
|
|
|
10/22/98 338 - signed the temp col of the occ req card told them to go d
|
INSP - Final | 10/21/1998 | 10/21/1998 | 10/22/1998 | P | NH |
|
|
|
10/21/98 338 - out of time will recall for 10/23/98
|
INSP-Final Inspection | 10/20/1998 | 10/21/1998 | 10/21/1998 | A | PART |
Joe Tawney
|
|
|
10/21/98 406 - ROGER ###-#### REINSP OK FOR TEMP OCC OF FREEZER ROOM SUPRV LABELING PIPES
|
INSP-Final Inspection | 9/21/1998 | 9/22/1998 | 9/22/1998 | A | FAIL |
Joe Tawney
|
|
|
09/22/98 406 - jennifer ###-#### FINAL FAIL WIRE VLV TAMPER SWITCH OBSTRUCTED SPKLR HEADS
|
INSP-Final Inspection | 9/11/1998 | 9/14/1998 | 9/13/1998 | A | NR |
|
|
|
09/14/98 338 - OTH-OTHER AGENCIES NOT APPROVED
|
INSP-Final Inspection | 8/28/1998 | 8/31/1998 | 8/31/1998 | A | PART |
Joe Tawney
|
|
|
08/31/98 406 - SHELLY ###-#### OK ON SPKLR ROUGH IN AND HYDRO TEST
|
INSP - Framing/Rough-in | 8/13/1998 | 8/13/1998 | 8/13/1998 | | PART |
|
|
|
08/05/98 338 - ok to cover
|
INSP - Framing/Rough-in | 8/13/1998 | 8/13/1998 | 8/13/1998 | | PART |
|
|
|
08/05/98 338 - ok to cover
|
INSP - Foundation | 7/21/1998 | 7/21/1998 | 7/23/1998 | P | PASS |
|
|
|
07/21/98 338 - made ok to pour all footings and walls are complete
|
INSP - Foundation | 6/30/1998 | 6/30/1998 | 6/30/1998 | P | PART |
|
|
|
06/30/98 338 - SLABS NOT INSPECTED BY ME
|
INSP - Framing/Rough-in | 6/8/1998 | 6/8/1998 | 6/8/1998 | P | PART |
|
|
|
06/08/98 338 - made ok to pour r-bar placed in the west and south walls
|
INSP - Framing/Rough-in | 5/15/1998 | 5/15/1998 | 5/15/1998 | P | PART |
|
|
|
05/15/98 338 - MADE OK FOR THE FREEZER EAST TO WEST WALLS ONLY
|
INSP - Foundation | 4/30/1998 | 4/30/1998 | 4/30/1998 | P | PASS |
|
|
|
MADE OK R-BAR PLACED
|
INSP - Foundation | 4/30/1998 | 4/30/1998 | 4/30/1998 | | PASS |
|
|
|
04/30/98 338 - FRMS-OK FORMS-REBAR
|
INSP - Foundation | 4/30/1998 | 4/30/1998 | 4/30/1998 | | PASS |
|
|
|
04/30/98 338 - FRMS-OK FORMS-REBAR
|
INSP - Foundation | 4/27/1998 | 4/28/1998 | 4/28/1998 | A | PART |
|
|
|
04/28/98 338 - north wall
|
INSP - Conference | 4/21/1998 | 4/21/1998 | 4/21/1998 | | PART |
|
|
|
/ / 338 - made k general ctr confirming conversation with Eng of earli
|
INSP - Conference | 4/21/1998 | 4/21/1998 | 4/21/1998 | | PART |
|
|
|
/ / 338 - with eng on design concrete 3000 is not reqired 10 min on ph
|
INSP - Foundation | 4/17/1998 | 4/20/1998 | 4/20/1998 | A | NR |
|
|
|
04/20/98 338 - NOT READY NEED SP INSP FOR DESIGN LOADS OF 3000 PSI PER C
|
INSP - Foundation | 4/15/1998 | 4/16/1998 | 4/16/1998 | A | NR |
|
|
|
04/16/98 338 - 2nd time on jobsite without the approved plans on site c/
|
INSP - Foundation | 4/14/1998 | 4/15/1998 | 4/15/1998 | P | NR |
|
|
|
04/15/98 338 - need to have approved plans on jobsite for proper inspect
|
Issue PAID IN FULL permit | | | 4/9/1998 | | |
|
|
|
|
Telephone call | | | 4/8/1998 | | |
|
|
|
CALLED AND GAVE BRAD $ AMOUNT
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/8/1998 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 4/7/1998 | | 4/8/1998 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 4/8/1998 | | 4/8/1998 | | PASS |
|
|
|
|
Print Occupancy Form | | | 4/8/1998 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/8/1998 | | |
|
|
|
|
Plan assigned to (ADS) | 1/14/1998 | | 4/8/1998 | | PASS |
|
|
|
|
90 day tracking............. | | 1/7/1998 | 4/7/1998 | | PEND |
|
|
|
|
Routing - PLAN CHECK | 3/26/1998 | | 4/2/1998 | | PASS |
|
|
|
|
Telephone call | | | 4/1/1998 | | |
|
|
|
Spoke to Brad Wheeler this AM. I told him that we still needed information on the thermal barrier inside the building. We also need drainage plan approval. He said the plan had been submitted. Brian Murphy phoned him about this later this same morning. The resubmittal recieved 30Jan only showed the location of existing drains and contained no calculations. It was not perceived as a drainage resubmittal.
|
Routing - PLAN CHECK | 2/5/1998 | | 3/26/1998 | | FAIL |
|
|
|
|
Routing - FIRE | 3/25/1998 | | 3/26/1998 | | PASS |
|
|
|
|
Routing - FIRE | 2/2/1998 | | 2/5/1998 | | FAIL |
|
|
|
|
Plan Reviewer's activity | | | 1/30/1998 | | FAIL |
|
|
|
Foam plastic in walls & ceiling need to be seperated from the interior by a thermal barrier. Notice faxed to Brad Wheeler. This was also explained to him in a phone call today.
|
Plan resubmittals received | | | 1/23/1998 | | PEND |
|
|
|
RECEIVED RESUBS FROM STAN COLE. STRUCTURAL CALCULATIONS AND PLANS. 2 SETS EACH.
|
Plan Reviewer's activity | | | 1/22/1998 | | FAIL |
|
|
|
Initial plan review report faxed to Brad Wheeler. More information is needed to complete the review.
|
Routing - PLANNING | 1/13/1998 | | 1/20/1998 | | PASS |
|
|
|
X-REF: CZC98-0003
|
Plan assigned to (JCM) | 1/8/1998 | | 1/14/1998 | | PASS |
John Menard
|
|
|
|
Routing - PUBLIC WORKS | 1/9/1998 | | 1/13/1998 | | FAIL |
|
|
|
REQUIRES DRAINAGE PLAN. PER BRIAN M. KMM
|
Routing Off Site - A.C.H.D | 1/8/1998 | | 1/9/1998 | | PASS |
|
|
|
CONTACTED BRAD WHEELER AT###-#### TO TAKE PLANS OUT TO ACHD NO ACHD FEES DUE. PER MGG
|
Routing Off Site - C.D.H | 1/8/1998 | | 1/8/1998 | | PASS |
|
|
|
BUD JUE DOING HIS REVIEW AT THIS TIME. APPROVED WITH CONDITIONS ATTACHED TO THE PLANS
|
Plans ACCEPTED BY PLAN CHECK | | | 1/8/1998 | | HOLD |
|
|
|
I SPOKE WITH ROGER JONES ABOUT A DR. HE STATED THAT A DR WOULD BE NEEDED. I CONTACTED BRAD WHEELER AT ###-#### OF THIS NEED AND TOLD HIM TO GET IN TOUCH WITH ROGER. I ALSO TOLD HIM I CANNOT ROUTE UNTIL HE RECEIVES HIS DR# BUD JUE WILL PROCEED WITH CDH'S REVIEW. KMM
|
Plan assigned to (MYS) | 1/7/1998 | | 1/8/1998 | | |
Marlene Southard
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 1/8/1998 | | HOLD |
|
|
|
SEE ACTION 007 HOLD
|
Received Certificate of Value | | | 1/8/1998 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/7/1998 | | PEND |
|
|
|
|
Application received | | | 1/7/1998 | | |
|
|
|
|