INSP - Final | 4/8/1999 | 4/8/1999 | 4/8/1999 | P | PASS |
Russ Owen
|
|
|
###-#### ROD//FINAL LATE PM
|
SUPER- Supervisor's review | 4/6/1999 | 4/6/1999 | 4/6/1999 | | PEND |
|
|
|
|
Temporary occupancy | | | 4/1/1999 | | PASS |
|
|
|
Temp. Occ. Cert. #3910 issued 4-1-99 to Idaho Roasters, Inc.
|
INSP-Final Inspection | 3/26/1999 | 3/26/1999 | 3/26/1999 | P | PASS |
Rick Jackson
|
|
|
shell and core okay
|
INSP - Framing/Rough-in | 3/4/1999 | 3/5/1999 | 3/5/1999 | A | PASS |
Russ Owen
|
|
|
03/05/99 407 - partial insid.
|
INSP - Framing/Rough-in | 2/18/1999 | 2/19/1999 | 2/19/1999 | A | FAIL |
Russ Owen
|
|
|
02/19/99 407 - one side only interior,has corrections more screws.and co
|
INSP - Framing/Rough-in | 2/8/1999 | 2/8/1999 | 2/8/1999 | P | PART |
Wes Worcester
|
|
|
02/08/99 342 - ###-#### hoods remain
|
INSP - Framing/Rough-in | 1/22/1999 | 1/22/1999 | 1/29/1999 | P | PART |
Wes Worcester
|
|
|
01/22/99 342 - ROD...###-#### OK TO INSULATE ROOF STRUCTURE
|
Fee Review-notes | 9/29/1998 | | 1/27/1999 | | |
|
|
|
|
INSP - Framing/Rough-in | 1/22/1999 | 1/25/1999 | 1/25/1999 | P | PART |
Wes Worcester
|
|
|
01/22/99 342 - SHR OK
|
INSP - Framing/Rough-in | 1/20/1999 | 1/20/1999 | 1/20/1999 | P | FAIL |
Wes Worcester
|
|
|
01/20/99 342 - rod- ###-#### shear wall insp
|
INSP - Framing/Rough-in | 1/8/1999 | 1/11/1999 | 1/11/1999 | A | PART |
Wes Worcester
|
|
|
01/11/99 342 - rod- ###-####-roof nailing insp ok
|
INSP - Foundation | 10/13/1998 | 10/14/1998 | 10/14/1998 | A | PASS |
Wes Worcester
|
|
|
10/14/98 342 - ROD ###-####
|
INSP - Foundation | 10/13/1998 | 10/13/1998 | 10/13/1998 | P | PASS |
Wes Worcester
|
|
|
10/13/98 342 - ROD ###-####
|
INSP - Framing/Rough-in | 10/9/1998 | 10/12/1998 | 10/12/1998 | A | PASS |
Wes Worcester
|
|
|
10/09/98 342 - k-2 const-###-#### for stem wall insp-early if possible
|
Plan resubmittals received | | | 10/12/1998 | | |
|
|
|
RECEIVED TWO COPIES OF REVISED SHEETS S1.1. ROUTED TO WES W. KMM
|
Plan resubmittals received | | | 10/9/1998 | | |
|
|
|
RECEIVED TWO COPIES OF REVISED SHEETS C1.0, C1.1, A1.1, A1.2, A2.1, A2.2, A3.1, A4.1, A6.1, A7.1, A7.2, A7.3, A7.4, A7.5, A7.6, A7.7, S1.1, S1.2, S2.1, S2.2 ROUTED TO WES W. KMM
|
INSP - Foundation | 10/7/1998 | 10/8/1998 | 10/8/1998 | A | PART |
Wes Worcester
|
|
|
10/08/98 342 - ROD ###-####
|
INSP - Foundation | 10/8/1998 | 10/8/1998 | 10/8/1998 | P | PART |
Wes Worcester
|
|
|
10/08/98 342 - early afternoon footing rod ###-####
|
INSP - Foundation | 10/6/1998 | 10/7/1998 | 10/7/1998 | P | PART |
Wes Worcester
|
|
|
10/07/98 342 - ROD ###-#### FOOTING REsubmittal delivered, approved w/mi
|
Plan resubmittals received | | | 10/6/1998 | | |
|
|
|
RECEIVED TWO COPIES OF SHEETS S1.1 AND S1.2 ROUTED TO WES
|
(F) Reprint permit | | | 10/1/1998 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/30/1998 | | |
|
|
|
|
Print Occupancy Form | | | 9/29/1998 | | |
|
|
|
|
Inspection Record Card- Bld | | | 9/29/1998 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 9/28/1998 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 9/28/1998 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/28/1998 | | PASS |
|
|
|
|
Plan assigned to (M_P) | 1/14/1998 | | 9/28/1998 | | PASS |
Mike Phillips
|
|
|
09/28/98 11:18:55 M_P - this action updated by action script from <<>> in Case No. BLD98-0068
|
Routing - PUBLIC WORKS | 9/22/1998 | | 9/25/1998 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 9/22/1998 | | PEND |
|
|
|
returning to P.W. For review for two future restaurants and new certificate of value.
|
Routing - PLANNING | 9/14/1998 | | 9/15/1998 | | PASS |
|
|
|
approved per resubmitted plans, dated September 11,1998, and as noted on sheet C1.0 (change tree located west of s.w. bldg corner to White Ash), on sheet A1.1 (max. seating for entire bldg is 130, based on 65 prkg spaces), and on sheet A2.1 (awnings shall be consistent on entire bldg, black & white stripes and red at Broadway).
|
Plan resubmittals received | | | 9/11/1998 | | PEND |
|
|
|
RECEIVED RESUBMITTALS FROM DESIGN RESOURCES, FORWARDED SAME TO MIKE PHILLIPS.
|
Application received | | | 9/8/1998 | | |
|
|
|
|
Routing - PLANNING | 9/4/1998 | | 9/8/1998 | | FAIL |
|
|
|
X-ref. DRH98-0144. The applicant has not submitted revised plans to staff for approval as required under the conditions of approval of DRH98-0144.
|
Plan resubmittals received | | | 9/1/1998 | | PEND |
|
|
|
RECEIVED RESUBMITTALS FROM DESIGN RESOURCES, FORWARDED SAME TO MIKE PHILLIPS. DAR
|
Plan Reviewer's activity | | | 7/29/1998 | | |
|
|
|
Sent letter of expiration on 07/29/98 gave extension to August 30 1998 and then plans will be thrown away on September 10 '98
|
Plan resubmittals received | | | 5/5/1998 | | PEND |
|
|
|
RECEIVED RESUBS FROM ROCKY, PASSED SAME TO MIKE PHILLIPS.
|
Telephone call | | | 5/4/1998 | | FAIL |
|
|
|
NEED ADDITIONAL INFORMATION ON STRUCTURAL DETAILS.
|
Plan Reviewer's activity | | | 5/4/1998 | | PEND |
|
|
|
WAITING FOR ACHD FEE RECEIPT.
|
Routing - PLUMBING | 4/29/1998 | | 4/30/1998 | | PASS |
|
|
|
bUILDING IS BEING CHANGED TO A SHELL ONLY AT THIS TIME.
|
Routing - PLANNING | 4/27/1998 | | 4/28/1998 | | PASS |
|
|
|
x-ref. DR-130-96 and DRH97-0119
|
Routing - PLANNING | 4/9/1998 | | 4/27/1998 | | FAIL |
|
|
|
Need revised plan in order to sign off. Return to Mike Phillips.
|
90 day tracking............. | | 1/13/1998 | 4/13/1998 | | PEND |
|
|
|
|
Routing - PLUMBING | 4/8/1998 | | 4/9/1998 | | FAIL |
|
|
|
|
Routing - FIRE | 3/31/1998 | | 4/8/1998 | | PASS |
|
|
|
PACKAGE #1
|
Routing - PLANNING | 3/16/1998 | | 3/31/1998 | | FAIL |
|
|
|
PACKAGE #1 x-ref. DR-130-96 & DRH97-0119 Contacted applicant last week and told them revised plans were needed per DR conditions.
|
Application received | | | 3/31/1998 | | |
|
|
|
|
Plan resubmittals received | | | 3/24/1998 | | |
|
|
|
RECEIVED 2 REVISED SHEETS P1.0. ROUTED TO MIKE P. KMM
|
Routing - PLUMBING | 3/16/1998 | | 3/16/1998 | | FAIL |
|
|
|
PACKAGE #1
|
Routing - PUBLIC WORKS | 3/4/1998 | | 3/16/1998 | | PASS |
|
|
|
PACKAGE #1
|
Plan Reviewer's activity | | | 3/4/1998 | | FAIL |
|
|
|
REQUESTED ADDITIONAL INFORMATION TO BE SUBMITTED FOR REVIEW.
|
Plan resubmittals requested | | | 3/4/1998 | | FAIL |
|
|
|
REQUESTED ADDITIONAL INFORMATIONTO BE SUBMITTED FOR REVIEW
|
Print Pending Permit.LaserJet4 | | | 3/4/1998 | | FAIL |
|
|
|
|
Routing Off Site - C.D.H | 1/13/1998 | | 2/23/1998 | | PASS |
|
|
|
PACKAGE #1 CONTACTED BOB LEMOINE AT ###-#### TO TAKE PLANS OUT TO CDH
|
Routing Off Site - A.C.H.D | 1/13/1998 | | 1/23/1998 | | PEND |
|
|
|
PACKAGE #2 CONTACTED BOB LEMOINE AT ###-#### TO TAKE PLANS OUT TO ACHD ACHD IMPACT FEE DUE 1/26/98
|
Routing Off Site - STRUCTURAL | 1/13/1998 | | 1/14/1998 | | |
|
|
|
PACKAGE #3 WAITING FOR STRUCT. CALCS. JOHN REVIEWED BUT COULD NOT DECIDE UNTIL HE HAS THE CALCS. 1-14-98 MIKE PHILLIPS WILL REVIEW PER JOHN M.
|
Plan assigned to (JCM) | 1/13/1998 | | 1/14/1998 | | PASS |
John Menard
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 1/14/1998 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 1/14/1998 | | PASS |
|
|
|
SEE ACTION 007 PEND
|
Application received | | | 1/13/1998 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 1/13/1998 | | PEND |
|
|
|
WAITING FOR STRUCT. CALCS. SOILS INFORMATION AM ROUTING TO PACKAGE #1 TO CDH AND PACKAGE #3 TO ACHD 1-14-98 RECEIVED STRUCT. CALCS.
|
Plan assigned to (MYS) | 1/13/1998 | | 1/13/1998 | | |
Marlene Southard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/13/1998 | | PEND |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 1/13/1998 | | PEND |
|
|
|
WAITING FOR STRUCTURAL CALCS. CONTACTED ROCKY TOWLE OF THIS NEED. KMM ALSO NEED TO KNOW SOILS BEARING PRESSURE 1-14-98 RECEIVED STRUCT. CALCS. SOIL BEARING IS 1500 PSF
|
Received Certificate of Value | | | 1/13/1998 | | PASS |
|
|
|
|