Permit NumberBLD98-00093
StatusExpired
Name OLYMPUS BLDG CORE
Site Address 6225 N MEEKER
Project NameOLYMPUS BLDG.
Customer Number 
ePlanReviewNo
Description
(OLUMPUS BUILDING - EXIT/RESTROOM CORE) Fire sprinklers used for building area increase. To construct the exit/restroom core on the first and second floors. Work is to include 4 restrooms accessible to the disabled, 1-hr fire-resistive exit corridor (tunnel), elevator, and suspended ceilings all per approved drawings and plan review conditions on file. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. This permit does not extablish a Certificate of Occupancy. DR#60-96 PC-018-98 **CJW**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes7/21/1998 1/28/1999
Print Occupancy Form  1/21/1999
INSP - Letter of compliance12/11/199812/11/199812/11/1998 PASS
DetailsJim Sly
/ / 316 - C/C # 16310
INSP - Letter of compliance12/11/199812/11/199812/11/1998 PASS
DetailsJim Sly
/ / 316 - C/C # 16310
INSP - Final12/10/199812/10/199812/10/1998 PASS
DetailsJim Sly
12/10/98 316 - C/C # 16310
INSP - Final11/30/199812/1/199812/1/1998ANR
DetailsJim Sly
12/01/98 316 - DENNIS ###-####
INSP-Final Inspection11/27/199811/30/199811/30/1998APASS
DetailsJoe Tawney
11/30/98 406 - dennis at steed ###-#### reinspection - olympus bldg REINSP OK FOR PERM OCC
INSP - Final11/16/199811/16/199811/16/1998 PASS
DetailsJoe Tawney
/ / 406 - REINSP OK FOR CERT OF COMPLETION
INSP-Final Inspection10/28/199810/28/199810/28/1998PPART
DetailsJoe Tawney
10/28/98 406 - odie ###-#### fn insp-call 1st FINAL OK FOR TEMP ON CORE TEST DUCT DET ON AHU'S
INSP - Final7/27/19987/27/19987/27/1998PFAIL
DetailsJim Sly
07/27/98 316 - Need all req signatures Occ req card..Need letter of appr
INSP-Final Inspection6/15/19986/16/19986/16/1998PPART
DetailsJoe Tawney
06/16/98 406 - BRIAN ###-#### ALARM TEST FOR SPKLR SYSTEM OK
INSP - Framing/Rough-in6/3/19986/3/19986/3/1998PPASS
DetailsJim Sly
06/03/98 316 - CEILING GRID CORE AREA and firestopping corridors.....OK
INSP - Framing/Rough-in5/29/19986/1/19986/1/1998AFAIL
DetailsJim Sly
06/01/98 316 - C/N...Need appr plans...Firestop all penit at corr..compl
INSP - Framing/Rough-in5/28/19985/29/19985/29/1998APART
DetailsJim Sly
05/29/98 316 - ceiling grid OK
90 day tracking............. 1/15/19984/15/1998 PEND
INSP - Framing/Rough-in3/23/19983/23/19983/23/1998PPART
DetailsJim Sly
03/23/98 316 - OK to Rock Main floor corridor only...
Issue PAID IN FULL permit  2/25/1998
Plan assigned to (CJW)1/16/1998 2/23/1998 PASS
DetailsCarl Westfall
02/23/98 08:46:42 CJW - this action updated by action script from <<>> in Case No. BLD98-0093
Telephone call  2/23/1998
called steed/scott raymes out/told jody the permit ready and the $ amount
Inspection Record Card- Bld  2/23/1998
Print Occupancy Form  2/23/1998
PLANS/APPL TAKEN TO FRONT DESK  2/23/1998 PASS
Routing - FIRE2/13/1998 2/20/1998 PASS
Routing - PLAN CHECK2/10/1998 2/13/1998
Routing - PLUMBING2/6/1998 2/9/1998 PASS
testing condition printout  2/6/1998
Print permit w/o conditions  2/6/1998
Plan Reviewer's activity  2/2/1998 PASS
UBC plan review started Feb. 2, 1998 and finished Feb. 6, 1998. Drawings approved, with conditions, as noted and attached to the approved drawings.
Routing - PUBLIC WORKS1/16/1998 1/22/1998 PASS
Plan routing begun/TENANTS  1/16/1998 PASS
Received Certificate of Value  1/16/1998 PASS
Plans ACCEPTED BY PLAN CHECK  1/16/1998 PASS
Plan assigned to (MYS)1/15/1998 1/16/1998
DetailsMarlene Southard
Recd Pcfee & Taken To Pln CK  1/15/1998
Application received  1/14/1998
Routing - PLAN CHECK2/20/1998