Permanent Occupancy | | 12/2/1998 | 12/2/1998 | | DONE |
|
|
|
|
Permanent occupancy | | | 12/2/1998 | | PASS |
|
|
|
Perm. Occ. cert. #7519 issued 12-2-98 to Fredriksen Health Insurance.
|
INSP - Final | 11/30/1998 | 11/30/1998 | 11/30/1998 | | PASS |
|
|
|
11/12/98 338 - madeok for perm
|
INSP - Final | 9/3/1998 | 9/3/1998 | 9/3/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP OK FOR PERM OCC
|
Fee Review-notes | 7/14/1998 | | 7/14/1998 | | |
|
|
|
|
Print Occupancy Form | | | 7/10/1998 | | |
|
|
|
|
INSP - Framing/Rough-in | 6/12/1998 | 6/12/1998 | 6/12/1998 | | PART |
|
|
|
/ / 333 - TOWNHOUSE WALL OK
|
Receive PAYMENT IN FULL | | | 6/9/1998 | | |
|
|
|
|
Temporary occupancy | | | 5/20/1998 | | PASS |
|
|
|
Temp. Occ. Cert. #3622 issued 5-20-98 to Fredriksen Health Insurance.
|
INSP - Final | 5/15/1998 | 5/18/1998 | 5/18/1998 | A | PART |
|
|
|
05/18/98 338 - OK FOR TEMP OCC. SIGNED FOR MECH C/N REMOVED. MOVED PLMG
|
INSP-Final Inspection | 5/15/1998 | 5/15/1998 | 5/15/1998 | P | PART |
Joe Tawney
|
|
|
05/15/98 406 - ###-#### FINAL OK FOR TEMP OCC ANNUAL INSP FOR SPKLR SYSTEM EXIT LIGHT
|
FEE REVIEW-NOTES | | | 5/15/1998 | | FEES |
|
|
|
additional values of 6499.00 for elect. plm and mech. lh
|
INSP-Final Inspection | 5/12/1998 | 5/13/1998 | 5/13/1998 | A | FAIL |
Joe Tawney
|
|
|
05/13/98 406 - ###-#### FINAL FAIL ADDRESS FIRE EXT DOOR SIGN COMPLETE BATHROOMS
|
INSP-Conference | 5/8/1998 | 5/11/1998 | 5/11/1998 | A | PART |
|
|
|
05/11/98 338 - ok to start moving in furn. etc prior to occ cert.
|
INSP - Framing/Rough-in | 4/17/1998 | 4/20/1998 | 4/20/1998 | P | NR |
|
|
|
04/20/98 338 - NEED PLM SIGNOFF FOR BOTH SETS OF BATHROOMS BEFOR GO AHEA
|
90 day tracking............. | | 1/16/1998 | 4/16/1998 | | PEND |
|
|
|
|
INSP - Framing/Rough-in | 3/30/1998 | 3/31/1998 | 3/31/1998 | P | PART |
|
|
|
conf \\ shawn ###-####
|
INSP - Framing/Rough-in | 3/23/1998 | 3/24/1998 | 3/24/1998 | A | NR |
|
|
|
03/24/98 338 - conf. shawn ###-####
|
INSP - Conference | 3/24/1998 | 3/24/1998 | 3/24/1998 | | PASS |
|
|
|
/ / 338 - with ctr to set up time to meet on site
|
Issue PAID IN FULL permit | | | 2/19/1998 | | |
|
|
|
|
Print Occupancy Form | | | 2/17/1998 | | |
|
|
|
|
Telephone call | | | 2/17/1998 | | |
|
|
|
CALLED GAVE DOLLAR AMOUNT ON MACHINE-ATTENDING BCA
|
Inspection Record Card- Bld | | | 2/17/1998 | | |
|
|
|
|
Plan assigned to (DRS) | 1/23/1998 | | 2/13/1998 | | PASS |
Dan Stuart
|
|
|
02/13/98 07:06:59 DRS - this action updated by action script from <<>> in Case No. BLD98-0115
|
Plan resubmittals received | | | 2/13/1998 | | |
|
|
|
Reveived faxed copy of flor plan layout change for restroom doors.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/13/1998 | | PASS |
|
|
|
|
Received Certificate of Value | | | 2/13/1998 | | |
|
|
|
Received new C.V. including $250.00 for the sprinkler system alteration costs.
|
Print Pending Permit.LaserJet4 | | | 2/13/1998 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 2/13/1998 | | 2/13/1998 | | PASS |
|
|
|
Received fax of floor plan corrections from Mr. Cook for floor plan. He will come by this afternoon to stamp and sign plans. Preparing to process for issuing permit.
|
Telephone call | | | 2/12/1998 | | |
|
|
|
Call to John Cook office. There was no answer but I left phone mail message to cal concerning this project when he is available
|
Telephone call | | | 2/12/1998 | | |
|
|
|
Received call from Mr. Cook in late P.M. Will be in tommorrow to stamp & sign plans. Will fax over rearrangement of doors to restrooms from the coffeee #1 area and take off note for futrue door location at men's restroom. The special inspection information will be handled with the engineer & owner.
|
Routing - PLAN CHECK | 2/12/1998 | | 2/12/1998 | | PEND |
|
|
|
Inserted new submittal into plan. Submittals incomplete & sheets not stamped and signed by architect. Prepared list of needed items and faxed and mailed copies to Mr. Cook.
|
Plan resubmittals requested | | | 2/12/1998 | | |
|
|
|
New cover letter & copy of questions 03 & 06 from former request back to Mr. Cook for further clarification. Faxed & mailed copy of cover letter, items not complete, form for Special Inspection & Testing Agreement & Special Inspection Testing Schedule, new C.V., copy of ER-4627 for Hilti Kwik Bolt II and note on needing his architectural stamp on the plans submitted Feb. 10, 1998.
|
Plan resubmittals received | | | 2/10/1998 | | |
|
|
|
Received new sheet A2.0 & A3.0 (not stamped and signed by architect) and engineering calculations from John Mortin, Briggs Engineering. Questions concerning clear floor area at restroom doors was not addressed on new submittals and details for special inspection were incomplete.
|
Routing - FIRE | 2/2/1998 | | 2/3/1998 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 1/27/1998 | | 1/31/1998 | | |
|
|
|
Picked up plans to start review.
|
Plan resubmittals requested | | | 1/31/1998 | | PEND |
|
|
|
Faxed & mailed copy of correction list to Harold Cook, architect for response. Forwarding plans to fire dept for review.
|
Routing - PLAN CHECK | 1/31/1998 | | 1/31/1998 | | PEND |
|
|
|
Preliminary plan review completed. Correction requirement list faxed & mailed to Harold Cook, Architect for response. Forwarding plans to fire department for review.
|
Print Pending Permit.LaserJet4 | | | 1/31/1998 | | PEND |
|
|
|
|
Routing - PUBLIC WORKS | 1/26/1998 | | 1/27/1998 | | PASS |
|
|
|
|
Plan routing begun/TENANTS | | | 1/23/1998 | | |
|
|
|
Route to PUBLIC WORKS, PLAN CHECK and FIRE.
|
Plan assigned to (MYS) | 1/16/1998 | | 1/23/1998 | | |
Marlene Southard
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 1/21/1998 | | |
|
|
|
SEE ACTION OO7 HOLD
|
Plans ACCEPTED BY PLAN CHECK | | | 1/20/1998 | | HOLD |
|
|
|
PLANS NEED TO BE STAMPED AND SIGNED. CONTACTED JOHN COOK AT ###-#### TO LET HIM KNOW OF THIS NEED. 1-21-98 JOHN COOK STAMPED AND SIGNED PLANS. ROUTED TO MARLENE.
|
Application received | | | 1/16/1998 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/16/1998 | | PEND |
|
|
|
|