Fee Review-notes | 7/14/1998 | | 12/7/1998 | | |
|
|
|
|
Permanent occupancy | | | 9/14/1998 | | PASS |
|
|
|
Perm. Occ. Cert. #7406 issued 9-14-98 to Rite-Aid.
|
Permanent Occupancy | | 9/11/1998 | 9/11/1998 | | DONE |
|
|
|
|
Temporary occupancy | | | 9/10/1998 | | PASS |
|
|
|
Temp. Occ. Cert. #3692 issued 9-10-98 to Rite Aid.
|
INSP-Final Inspection | 9/8/1998 | 9/9/1998 | 9/9/1998 | P | PASS |
Joe Tawney
|
|
|
09/09/98 406 - KEN ###-#### REINSP OK FOR PERM OCC
|
INSP - Final | 8/24/1998 | 8/25/1998 | 8/25/1998 | A | NR |
|
|
|
08/25/98 338 - other agencies not approved
|
INSP-Final Inspection | 8/24/1998 | 8/25/1998 | 8/25/1998 | A | FAIL |
Joe Tawney
|
|
|
08/25/98 406 - ###-#### FINAL FAIL ALARM SYSTEM SPKLR PROT IN COOLER
|
Code Occupancy Approval | | | 8/17/1998 | | TEMP |
|
|
|
All in except need to finish small area of concrete curbing, - need to check on bike rack ..Temp signed.
|
INSP-Sprinkler Rough-in/Hydro | 8/6/1998 | 8/6/1998 | 8/6/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON HYDRO TEST
|
INSP - Framing/Rough-in | 8/5/1998 | 8/5/1998 | 8/5/1998 | P | PART |
|
|
|
08/05/98 338 - madee okto drop in the tiles will check the diffuser conn
|
INSP-Alarm Testing | 7/20/1998 | | 7/20/1998 | | FAIL |
|
|
|
Alarm plans rec'd from grinnel today. Alarm plans have been reviewed and approved by another vendor. No work allowed by grinnel until plan modification fee has been paid and new plans approved.
|
INSP-Sprinkler Rough-in/Hydro | 7/17/1998 | 7/17/1998 | 7/17/1998 | | PART |
Joe Tawney
|
|
|
07/17/98 406 - Tracy ###-#### OK ON SPKLR ROUGH IN NEED FIRE HYD INSTALLED WITHIN 290' OF FDC
|
INSP - Framing/Rough-in | 7/1/1998 | 7/2/1998 | 7/2/1998 | A | PART |
|
|
|
07/02/98 338 - Dominick ###-#### made ok to drywall the inside of the ex
|
INSP - Framing/Rough-in | 6/23/1998 | 6/23/1998 | 6/23/1998 | P | PART |
|
|
|
06/23/98 333 - exterior wall drywall needs to be checked for nailing whe
|
INSP-Supply line flush | 6/18/1998 | 6/18/1998 | 6/18/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON UNDERGROUND FLUSH
|
INSP - Foundation | 5/20/1998 | 5/20/1998 | 5/20/1998 | P | PART |
|
|
|
foundation walls/ ###-#### made ok sp insp made ok to cover
|
INSP - Foundation | 5/8/1998 | 5/11/1998 | 5/8/1998 | A | PART |
|
|
|
05/11/98 338 - made ok after 5:00 r-bar placed sp insp made ok
|
INSP-Conference | 5/5/1998 | 5/6/1998 | 5/6/1998 | P | PASS |
|
|
|
05/06/98 338 - will schedule pre job conf for next week
|
90 day tracking............. | | 1/23/1998 | 4/23/1998 | | PEND |
|
|
|
|
(F) Reprint permit | | | 4/21/1998 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/10/1998 | | |
|
|
|
|
Plan resubmittals received | | | 4/9/1998 | | PEND |
|
|
|
RECEIVED ONE SET OF RESUBS VICE TWO AS INDICATED ON THE TRANSMITTAL.DAR
|
Telephone call | | | 4/9/1998 | | PASS |
|
|
|
TALKED TO RUTH TO VERIFY PLANS ARE READY AND GAVE $ AMT
|
Routing Off Site - A.C.H.D | 1/26/1998 | | 4/7/1998 | | PASS |
|
|
|
PACKAGE #2 CONTACTED MARC COLEMAN AT ###-#### TO TAKE PLANS OUT TO ACHD. 4-7-98 I VERIFIED WITH BARB KEMP THAT THE FEES WERE PAID..DF
|
Telephone call | | | 4/3/1998 | | |
|
|
|
called marc office told denise permit ready and left my number
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/3/1998 | | PASS |
|
|
|
ISSUE
|
Inspection Record Card- Bld | | | 4/3/1998 | | |
|
|
|
|
Print Occupancy Form | | | 4/3/1998 | | |
|
|
|
|
Plan Reviewer's activity | | | 4/2/1998 | | PASS |
|
|
|
REVIEWED BOTH RESUBS, APPROVE, INSERT INTO PLANS, INPUT TO TIDEMARK, ISSUE.
|
Print Pending Permit.LaserJet4 | | | 4/2/1998 | | PASS |
|
|
|
FILES
|
Plan assigned to (PRP) | 2/5/1998 | | 4/2/1998 | | PASS |
|
|
|
04/02/98 15:50:05 PRP - this action updated by action script from <<>> in Case No. BLD98-0166
|
Routing - PLAN CHECK | 4/1/1998 | | 4/2/1998 | | PASS |
|
|
|
ISSUE
|
Plan resubmittals received | | | 4/2/1998 | | |
|
|
|
RECEIVED ONE RESPONSE LETTER AND REVISED PLANS. RECEIVED TWO COPIES OF SHEETS P-1, P-3, A-1, A-8, A-11,A-12B AND A-16. ROUTED TO DICK P.
|
Routing - PUBLIC WORKS | 3/31/1998 | | 3/31/1998 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 3/26/1998 | | 3/27/1998 | | FAIL |
|
|
|
PACKAGE #1 REQUIRES STREET LIGHTING PLAN.PER BILL COLSON.DAR 3/27/98
|
Routing - PLAN CHECK | 3/19/1998 | | 3/26/1998 | | |
|
|
|
|
Routing - PUBLIC WORKS | 3/18/1998 | | 3/19/1998 | | FAIL |
|
|
|
FAILED BY BILL COLSON REQUIRES STREET LIGHT PLAN. DAR 3/19/98
|
Routing - PLANNING | 3/4/1998 | | 3/17/1998 | | PASS |
|
|
|
APPROVED BY MARTY SANTOYA AND RICHARD COOK CUP97-0039 & DRH97-0208
|
Plan resubmittals received | | | 3/11/1998 | | |
|
|
|
RECEIVED ONE RESPONSE LETTER CORRELATION TO THE CORRECTION LIST OF FEB. 28. (ARCHITECTURAL AND STRUCTURAL) TWO COPIES OF SHEETS A-2 A-3 A-16 S-1 S-2 AND S-4. 2 REVISED STRUCTURAL CALCULATIONS. ROUTED TO DICK PIERCE
|
Plan resubmittals requested | 2/28/1998 | | 2/28/1998 | | |
|
|
|
|
Plan Reviewer's activity | | | 2/28/1998 | | FAIL |
|
|
|
REVIEWED PLANS, PREPARED CORRECTION LIST, FAX TO ARCH INCLUDING OUTSIDE ENGINEERING COMMENTS, FORWARD TO FIRE.
|
Routing - PLAN CHECK | 2/11/1998 | | 2/28/1998 | | FAIL |
|
|
|
PACKAGE #1--1ST REVIEW FINISHED/FAILED, FORWARD TO FIRE
|
Routing - PLUMBING | 2/10/1998 | | 2/11/1998 | | PASS |
|
|
|
PACKAGE #1
|
Routing - PLANNING | 1/28/1998 | | 2/10/1998 | | FAIL |
|
|
|
PACKAGE #1 X-REF: CUP97-0039, DRH97-0093, DRH97-0208. CU APPROVED BY RC. DR CONDITIONS HAVE NOT BEEN MET FOR LANDSCAPING. PHONED STEVE BENNER WITH CSHQA TO LET HIM KNOW WE NEED REVISED PLAN. ALSO LEFT MESSAT FOR JIM MURRAY WITH CSHQA. DR REVIEWED BY MGS.
|
Telephone call | | | 2/6/1998 | | |
|
|
|
Phoned Jim Murray with CSHQA to let him know that D.R. conditions for landscaping have not been met. Also spoke with Steve Benner, with CSHQA, and asked him to bring in a revised plan. If revised plan was not submitted within 3 days, building set would be routed to another agency/division.
|
Plan assigned to (JCM) | 1/26/1998 | | 2/5/1998 | | PASS |
John Menard
|
|
|
|
Routing Off Site - STRUCTURAL | 1/26/1998 | | 2/4/1998 | | |
|
|
|
PACKAGE #3 CONTACTED PDQ TO TAKE PLANS OUT TO ATWOOD, HINZMAN, AND JONES. COMMENTS RETURNED FROM ATWOOD HINZMAN JONES 2/4/98 FUTHER COMMENT REQUIRED FOR ATWOOD HINZMAN JONES. DAR 3-11-98 SENT VIA PDQ ONE COPY OF SUPPLEMENTAL STRUCT. DESIGN CALCS.AND ONE STRUCTURAL DEPARTMENT RESPONSE LETTER FOR COMMENTS DATED 2-28-98. COPY OF STRUCT. REVIEW COMMENTS AND ONE LETTER OF STRCT. PLAN CHECK REVIEW COMMENTS.
|
Routing - PUBLIC WORKS | 1/28/1998 | | 1/28/1998 | | FAIL |
|
|
|
PACKAGE #1 REQUIRES LEGAL DESCRIPTION PER JIM RICH. KMM
|
Plans ACCEPTED BY PLAN CHECK | | | 1/28/1998 | | PASS |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 1/26/1998 | | PASS |
|
|
|
SEE ACTION 007 PEND. WILL ROUTE PACKAGES #2, AND #3. KMM 1-27-98 SEE ACTION 007 PEND. SHEETS STAMPED AND SIGNED WILL ROUTE PACKAGE #1.
|
Plans ACCEPTED BY PLAN CHECK | | | 1/26/1998 | | PEND |
|
|
|
SHEETS # A-2 AND A-10-a NEED TO BE STAMPED AND SIGNED ON THE OFFICE COPY OF PACKAGE #1 1-27-98 SHEETS A-2 AND A-10-A STAMPED AND SIGNED. KMM
|
Received Certificate of Value | | | 1/23/1998 | | PASS |
|
|
|
|
Application received | | | 1/23/1998 | | |
|
|
|
|
Plan assigned to (MYS) | 1/23/1998 | | 1/23/1998 | | |
Marlene Southard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/23/1998 | | PEND |
|
|
|
|
Routing - FIRE | 3/2/1998 | | 3/4/1997 | | PASS |
|
|
|
PACKAGE #1
|
Routing - PLAN CHECK | 1/23/1998 | | | | PEND |
|
|
|
|