Permit NumberBLD98-00202
StatusFinaled
Name DAVID MALONEY
Site Address 190 E BANNOCK ST
Project NameST LUKES-GROUND FLR
Customer Number 
ePlanReviewNo
Description
Remodel for CT Scanner equipment. To remodel portion of exisitng Scanner area by demolision of existing wall and construction fo new 1-hour corriodr walls to separate area from corridor & around new electrical room. To be noncombustible framing with firecode sheetrock. New suspended ceiling per code. Add to or modify existing electrical, mechanical & plumbing. NOTE: This building is fully fire sprinklered. Modifications to sprinkler, smoke & alarm systems per UBC & UFC as regulated by Fire Department. All per approved plans, notes & attachments. (P.C.#047-98)/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  7/21/1998 PASS
Letter of Compliance #15801 issued 7-21-98.
INSP - Final7/16/19987/17/19987/17/1998APASS
Details
07/17/98 333 - FNL -OK FINAL
INSP - Final7/17/19987/17/19987/17/1998 PART
Details
07/17/98 333 - 458 462 ok to occupy
INSP-Final Inspection7/16/19987/17/19987/17/1998APASS
DetailsRick Jackson
Scheduled by Hello!. Contact phone is [3812023]. occ approved
INSP - Final6/19/19986/19/19986/19/1998APART
Details
06/19/98 333 - temp ok
INSP-Final Inspection6/19/19986/19/19986/19/1998APART
DetailsRick Jackson
temp occ approved. complete the electrical room wall and add detector
SUPER- Supervisor's review6/18/1998 6/18/1998 D
discovered wood framed wall. remove and constuct with type 1 construction
INSP - Final6/17/19986/17/19986/17/1998PPART
Details
06/17/98 333 - REVIEWED TEMP REQ
INSP - Framing/Rough-in5/13/19985/14/19985/14/1998APASS
Details
05/14/98 333 - ceiling ok
90 day tracking............. 1/28/19984/28/1998 PEND
INSP - Framing/Rough-in4/27/19984/27/19984/27/1998PPASS
Details
04/27/98 333 - shafts ok
INSP - Framing/Rough-in4/7/19984/8/19984/8/1998ACANC
Details
canceled by contractor
INSP - Framing/Rough-in4/8/19984/8/19984/8/1998 CANC
Details
04/08/98 333 - will do tomorrow
Telephone call  4/1/1998
called julie gave her total $ amount with double fee
Issue PAID IN FULL permit  4/1/1998
Inspection Record Card- Bld  4/1/1998
Print Occupancy Form  4/1/1998
PLANS/APPL TAKEN TO FRONT DESK  4/1/1998 PASS
Approved with notes and attachments. Information to be provided to inspector at time of frame inspection
Routing - FIRE3/24/1998 3/31/1998 PASS
Plan assigned to (DRS)2/2/1998 3/31/1998 PASS
DetailsDan Stuart
03/31/98 19:34:56 DRS - this action updated by action script from <<>> in Case No. BLD98-0202
Routing - PLAN CHECK3/31/1998 3/31/1998 PASS
Processing for permit issuance with noted items stll to be clarified to be submitted to structural inspector at time of frame inspection.
Received Certificate of Value  3/27/1998 PASS
Received C of V with sprinkler cost included.
Additional plans submitted  3/27/1998
Received additional copy of sheet M1.0 not included with 3/16/98 submittals.
Telephone call  3/25/1998
Called Art Albanese to discuss mechanical plans & needed corrections to architectural plans to reflect requirements for rated two hour shafts at locations ducts penetrate floor per sec. 711. Art said he would review items noted to him on 3/23/98 when he gets his plans and bring me the needed Certificate of value and signed architect of record sheet and the M1.0 sheet not included with plans (got two M2.0 sheets)
Routing - PLAN CHECK3/17/1998 3/24/1998 PEND
Inserted new submittals and reviewed. second report to architect on items not clarified or shown on plan resubmittals. Removed HOLD & routed plans to fire dept for review.
Plan resubmittals received  3/16/1998 PEND
RECEIVED RESUBS. GAVE THEM TO DAN S. 3/16/98 DAR
Routing - PLAN CHECK2/4/1998 2/16/1998 HOLD
Started plan review process. Plans incomplete. Do not show fire wall locations or ratings. Some fire doors indicated other are not - do not knoe if they have been deleted or forgotten. New double doors shown in corridor that are not referenced on 1996 "Statement of Conditions" floor plans for SLRMC. Plan sheets of mechanical and electrical are not compatible with architectural plans details - need to have clarified which is correct and other brought into compliance. PLAN ON HOLD UNTIL NEW PLANS RECEIVED.
Plan resubmittals requested  2/16/1998 HOLD
PLANS INCOMPLETE PLACED ON HOLD UNTIL NEW PALNS RECEIVED.
Waiting for Cert. of Value  2/16/1998 HOLD
NEW C.V. REQUIRED FOR ADDITIONAL WORK NEEDED FOR FIRE-RESISTIVE REQUIREMENTS AND FOR SPRINKLER SYSTEM MODIFICATION TO BE REFLECTED AS PART OF COST.
Plan Reviewer's activity  2/16/1998 HOLD
FAXED COPY OF CORRECTIONPLAN REVIEW REPORT TO JEFF HULL AT SLRMC & MAILED COPY.
Print Pending Permit.LaserJet4  2/16/1998
Routing - PUBLIC WORKS2/2/1998 2/4/1998 PASS
Plan routing begun/TENANTS  2/2/1998
Route to PUBLIC WORKS, PLAN CHECK & FIRE.
Recd Pcfee & Taken To Pln CK  1/28/1998
Plan assigned to (MYS)1/28/1998 1/28/1998
DetailsMarlene Southard
Application received  1/28/1998