Letter of compliance | | | 7/21/1998 | | PASS |
|
|
|
Letter of Compliance #15801 issued 7-21-98.
|
INSP - Final | 7/16/1998 | 7/17/1998 | 7/17/1998 | A | PASS |
|
|
|
07/17/98 333 - FNL -OK FINAL
|
INSP - Final | 7/17/1998 | 7/17/1998 | 7/17/1998 | | PART |
|
|
|
07/17/98 333 - 458 462 ok to occupy
|
INSP-Final Inspection | 7/16/1998 | 7/17/1998 | 7/17/1998 | A | PASS |
Rick Jackson
|
|
|
Scheduled by Hello!. Contact phone is [3812023]. occ approved
|
INSP - Final | 6/19/1998 | 6/19/1998 | 6/19/1998 | A | PART |
|
|
|
06/19/98 333 - temp ok
|
INSP-Final Inspection | 6/19/1998 | 6/19/1998 | 6/19/1998 | A | PART |
Rick Jackson
|
|
|
temp occ approved. complete the electrical room wall and add detector
|
SUPER- Supervisor's review | 6/18/1998 | | 6/18/1998 | | D |
|
|
|
discovered wood framed wall. remove and constuct with type 1 construction
|
INSP - Final | 6/17/1998 | 6/17/1998 | 6/17/1998 | P | PART |
|
|
|
06/17/98 333 - REVIEWED TEMP REQ
|
INSP - Framing/Rough-in | 5/13/1998 | 5/14/1998 | 5/14/1998 | A | PASS |
|
|
|
05/14/98 333 - ceiling ok
|
90 day tracking............. | | 1/28/1998 | 4/28/1998 | | PEND |
|
|
|
|
INSP - Framing/Rough-in | 4/27/1998 | 4/27/1998 | 4/27/1998 | P | PASS |
|
|
|
04/27/98 333 - shafts ok
|
INSP - Framing/Rough-in | 4/7/1998 | 4/8/1998 | 4/8/1998 | A | CANC |
|
|
|
canceled by contractor
|
INSP - Framing/Rough-in | 4/8/1998 | 4/8/1998 | 4/8/1998 | | CANC |
|
|
|
04/08/98 333 - will do tomorrow
|
Telephone call | | | 4/1/1998 | | |
|
|
|
called julie gave her total $ amount with double fee
|
Issue PAID IN FULL permit | | | 4/1/1998 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/1/1998 | | |
|
|
|
|
Print Occupancy Form | | | 4/1/1998 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/1/1998 | | PASS |
|
|
|
Approved with notes and attachments. Information to be provided to inspector at time of frame inspection
|
Routing - FIRE | 3/24/1998 | | 3/31/1998 | | PASS |
|
|
|
|
Plan assigned to (DRS) | 2/2/1998 | | 3/31/1998 | | PASS |
Dan Stuart
|
|
|
03/31/98 19:34:56 DRS - this action updated by action script from <<>> in Case No. BLD98-0202
|
Routing - PLAN CHECK | 3/31/1998 | | 3/31/1998 | | PASS |
|
|
|
Processing for permit issuance with noted items stll to be clarified to be submitted to structural inspector at time of frame inspection.
|
Received Certificate of Value | | | 3/27/1998 | | PASS |
|
|
|
Received C of V with sprinkler cost included.
|
Additional plans submitted | | | 3/27/1998 | | |
|
|
|
Received additional copy of sheet M1.0 not included with 3/16/98 submittals.
|
Telephone call | | | 3/25/1998 | | |
|
|
|
Called Art Albanese to discuss mechanical plans & needed corrections to architectural plans to reflect requirements for rated two hour shafts at locations ducts penetrate floor per sec. 711. Art said he would review items noted to him on 3/23/98 when he gets his plans and bring me the needed Certificate of value and signed architect of record sheet and the M1.0 sheet not included with plans (got two M2.0 sheets)
|
Routing - PLAN CHECK | 3/17/1998 | | 3/24/1998 | | PEND |
|
|
|
Inserted new submittals and reviewed. second report to architect on items not clarified or shown on plan resubmittals. Removed HOLD & routed plans to fire dept for review.
|
Plan resubmittals received | | | 3/16/1998 | | PEND |
|
|
|
RECEIVED RESUBS. GAVE THEM TO DAN S. 3/16/98 DAR
|
Routing - PLAN CHECK | 2/4/1998 | | 2/16/1998 | | HOLD |
|
|
|
Started plan review process. Plans incomplete. Do not show fire wall locations or ratings. Some fire doors indicated other are not - do not knoe if they have been deleted or forgotten. New double doors shown in corridor that are not referenced on 1996 "Statement of Conditions" floor plans for SLRMC. Plan sheets of mechanical and electrical are not compatible with architectural plans details - need to have clarified which is correct and other brought into compliance. PLAN ON HOLD UNTIL NEW PLANS RECEIVED.
|
Plan resubmittals requested | | | 2/16/1998 | | HOLD |
|
|
|
PLANS INCOMPLETE PLACED ON HOLD UNTIL NEW PALNS RECEIVED.
|
Waiting for Cert. of Value | | | 2/16/1998 | | HOLD |
|
|
|
NEW C.V. REQUIRED FOR ADDITIONAL WORK NEEDED FOR FIRE-RESISTIVE REQUIREMENTS AND FOR SPRINKLER SYSTEM MODIFICATION TO BE REFLECTED AS PART OF COST.
|
Plan Reviewer's activity | | | 2/16/1998 | | HOLD |
|
|
|
FAXED COPY OF CORRECTIONPLAN REVIEW REPORT TO JEFF HULL AT SLRMC & MAILED COPY.
|
Print Pending Permit.LaserJet4 | | | 2/16/1998 | | |
|
|
|
|
Routing - PUBLIC WORKS | 2/2/1998 | | 2/4/1998 | | PASS |
|
|
|
|
Plan routing begun/TENANTS | | | 2/2/1998 | | |
|
|
|
Route to PUBLIC WORKS, PLAN CHECK & FIRE.
|
Recd Pcfee & Taken To Pln CK | | | 1/28/1998 | | |
|
|
|
|
Plan assigned to (MYS) | 1/28/1998 | | 1/28/1998 | | |
Marlene Southard
|
|
|
|
Application received | | | 1/28/1998 | | |
|
|
|
|