Permit Information
Permit NumberBLD98-00209
StatusFinaled
Name MANWARING CAROLYN P
Site Address 1725 N CURTIS RD
Project NameDAYCARE
Customer Number 
ePlanReviewNo
Description
MR. TOAD CHILD CARE * REMODEL OF EXISTING TYPE V-N BUILDING AND TO CONSTRUCT A 794 SQ. FT. WOOD FRAMED ADDITION. ALL WORK TO MEET REQUIREMENTS FOR A DAY CARE CENTER LICENSED FOR 49 CHILDREN PER APPROVED PLANS,CU#38-97 PC#049-98
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes6/23/20036/23/20036/23/2003 DONE
Permanent occupancy  5/31/2000 DONE
Perm. Occ. Cert. #8247 issued 5-31-00 to Mr. Toad Child Care.
Permanent Occupancy 5/18/20005/18/2000 DONE
Details
BLD-Final5/18/20005/18/20005/18/2000APASS
DetailsBob Archibald
FIRE-Final Inspection5/12/20005/15/20005/15/2000PPASS
DetailsJoe Tawney
###-#### Reinsp. ok for perm. occ. ok'd key locking on front door. New gate opens inward. 5/16/00 10:04:57 AM
BLD-Conference5/12/20005/12/20005/9/2000APART
DetailsBob Archibald
Phone conference w/Anitta she informed me she had a conference scheduled w/Sam and her architect to review fire requirements on 5/12/00. Requested she keep me informed of status and would work with her on 5 day notice issued 5/4/00.
FIRE-Final Inspection5/5/20005/8/20005/8/2000PFAIL
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 05/05/2000 at 14:37:02. Contact: ###-####. Reinsp. fail C/N items not completed. 5/9/00 11:35:39 AM
BLD-Final5/5/20005/5/20005/4/2000PFAIL
DetailsCarl Dependahl
Occupancy violation issued.
FIRE-Final Inspection3/14/20003/15/20003/15/2000 FAIL
DetailsJoe Tawney
Joe - the owner called about this. call tom acoraci before you go. this is an old one and their temp has expired...Rick Reinsp. fail C/N issued. 3/16/00 1:25:00 PM
BLD-Final3/10/20003/14/20003/14/2000PFAIL
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 03/10/2000 at 13:27:10. Contact: ###-####. Fail not ready 3/16/00 11:22:12 AM
Code Occupancy Approval  3/7/2000 PASS
Meets compliance with the requirements of CU-38-97
BLD-Final10/29/199910/29/199910/29/1999PFAIL
DetailsJoe Tawney
old temp occ last insp 07/01/98 follow up for perm occ. "Supervisor Inspection" tenant did not call in or was aware of insp. Temp. occ. Over one year old.
Case Summary (BLD)  10/29/1999 DONE
Code Occupancy Approval  9/20/1999 FAIL
It would appear, as near as can be determined from the sketchy plan on file that the conditions of approval have been met. in regards to the Conditional Use Permit. However, there is still "prohibited outdoor storage of misc. bldg. materials and etc." at the north side of structure on the premises. This is only seperated from the playground by an "orange plastic web construction fence." With a violation of this nature at a "child care facility" I am reluctant to sign off a "final approval". I will talk to George S. and Planning Dept. Phone call with Ms. Leatham was very non-productive, she claims they are using the material and are allowed this storage. I believe this Building Permit has expired without being finaled - therefore, no rights to store materials for building on the property exist.
Discussion with Scott Spjute on 9/22/99. There is no "storage area" requested or approved on the plans.
Temporary occupancy  9/24/1998 PASS
Temp. Occ. Cert. #3698 issued 9-24-98 to Mr. Toad Child Care.
Code Occupancy Approval  8/24/1998 FAIL
bOND $1,310. POSTED -Temp. signed. Need Trash enclosure, some painting (bldg.) plantings to comply with Plans dated approved by Susan Riggs on 2/7 or 9/98. (Plans with this date and approval stamp are not in the file for (CUP97-0038).
INSP - Final7/21/19987/21/19987/21/1998 FAIL
DetailsJoe Tawney
/ / 406 - REINSP FAIL C/N STILL NOT COMPLETED FOR PERM OCC
INSP - Final7/2/19987/2/19987/2/1998PNR
Details
07/02/98 338 - last thing today please / this is for a temp occ. anita 3 ###-#### other agencies not approved/ need p/z with bond. occ req card is on cathys desk
INSP-Final Inspection6/30/19987/1/19987/1/1998PPART
DetailsJoe Tawney
07/01/98 406 - anitia ###-#### OK FOR TEMP OCC ALARM SYST CALCS EXIT DOOR LANDINGS FIRE EXT
INSP - Final6/26/19986/29/19986/29/1998ANR
Details
06/29/98 338 - temp occ. anita ###-#### no answer on contact # no occ re
INSP-Final Inspection6/26/19986/26/19986/26/1998PFAIL
DetailsJoe Tawney
06/26/98 406 - temp occ anita ###-#### ALARM SYSTEM FINAL FAIL STROBE INTENSITY BAT & VOLT DROP CALCS
INSP-Conference6/17/19986/17/19986/18/1998PPART
DetailsJoe Tawney
06/18/98 406 - CONF/ ANITA ###-#### PERRY GOING OUT TODAY ALSO. CONF ON ALARM SYSTEM AND EXITS
INSP - Framing/Rough-in6/16/19986/17/19986/17/1998APART
Details
06/18/98 338 - made ok to cover with ele insp blessing
Print Occupancy Form  6/4/1998
Inspection Record Card- Bld  6/4/1998
INSP - Framing/Rough-in6/1/19986/2/19986/2/1998ANR
Details
06/02/98 338 - need to adjus plans to be congruant details do not match
INSP - Foundation5/4/19985/4/19985/4/1998PPASS
Details
setbacks and grade made ok
90 day tracking............. 1/28/19984/28/1998 PEND
Issue PAID IN FULL permit  3/16/1998
Plan assigned to (M_O)1/29/1998 3/13/1998 PASS
Inspection Record Card- Bld  3/13/1998
Routing - PLAN CHECK3/13/1998 3/13/1998 PASS
Routing - FIRE3/12/1998 3/13/1998 PASS
Print Occupancy Form  3/13/1998
PLANS/APPL TAKEN TO FRONT DESK  3/13/1998 PASS
Inspection Record Card- Bld  3/13/1998
Telephone call  3/13/1998
left message that plans are ready
Plan resubmittals received  3/12/1998
REVISED PLANS RECEIVED. MO
Routing - PUBLIC WORKS2/19/1998 2/20/1998 PASS
Routing - FIRE2/11/1998 2/19/1998 FAIL
Routing - PLAN CHECK2/6/1998 2/11/1998 FAIL
CORRECTIONS MAILED AND FAXED TO OWNER. MO
Plan resubmittals requested  2/11/1998 FAIL
CORRECTIONS MAIELD AND FAXED TO OWNER. MO
Routing - PLANNING2/2/1998 2/5/1998 PASS
X-REF: CUP97-0038. APPROVED BY SAR.
Routing - PUBLIC WORKS1/29/1998 2/2/1998 FAIL
CHECK WITH MIKE OTTO FOR FURTHER ROUTING. REQUIRES DRAINAGE PLAN REVISIONS. KMM
Plan routing begun/NEW & ADDTN  1/29/1998 PASS
Plan assigned to (MYS)1/28/1998 1/29/1998
DetailsMarlene Southard
Plans ACCEPTED BY PLAN CHECK  1/29/1998 PASS
RECEIVED 2 COPIES OF ARCH. SHEETS AND 5 COPIES OF CIVIL SHEETS. PUT 2 CIVIL COPIES WITH ARCH. SHEETS LEFT 3 COPIES FOR BRIAN MURPHY. ALSO RECEIVED APPLICATION WITH A LETTER FROM DALE & ANITA LEATHAM REGARDING RIGHT OF WAY. NO PROJECT MANUEL OR STRUCTURAL CALCS. RECEIVED. ALL ROUTED TO P.W. KMM
Received Certificate of Value  1/29/1998 PASS
Application received  1/28/1998
Case Summary (BLD)