Fee Review-notes | 6/23/2003 | 6/23/2003 | 6/23/2003 | | DONE |
|
|
|
|
Permanent occupancy | | | 5/31/2000 | | DONE |
|
|
|
Perm. Occ. Cert. #8247 issued 5-31-00 to Mr. Toad Child Care.
|
Permanent Occupancy | | 5/18/2000 | 5/18/2000 | | DONE |
|
|
|
|
BLD-Final | 5/18/2000 | 5/18/2000 | 5/18/2000 | A | PASS |
Bob Archibald
|
|
|
|
FIRE-Final Inspection | 5/12/2000 | 5/15/2000 | 5/15/2000 | P | PASS |
Joe Tawney
|
|
|
###-#### Reinsp. ok for perm. occ. ok'd key locking on front door. New gate opens inward. 5/16/00 10:04:57 AM
|
BLD-Conference | 5/12/2000 | 5/12/2000 | 5/9/2000 | A | PART |
Bob Archibald
|
|
|
Phone conference w/Anitta she informed me she had a conference scheduled w/Sam and her architect to review fire requirements on 5/12/00. Requested she keep me informed of status and would work with her on 5 day notice issued 5/4/00.
|
FIRE-Final Inspection | 5/5/2000 | 5/8/2000 | 5/8/2000 | P | FAIL |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 05/05/2000 at 14:37:02. Contact: ###-####. Reinsp. fail C/N items not completed. 5/9/00 11:35:39 AM
|
BLD-Final | 5/5/2000 | 5/5/2000 | 5/4/2000 | P | FAIL |
Carl Dependahl
|
|
|
Occupancy violation issued.
|
FIRE-Final Inspection | 3/14/2000 | 3/15/2000 | 3/15/2000 | | FAIL |
Joe Tawney
|
|
|
Joe - the owner called about this. call tom acoraci before you go. this is an old one and their temp has expired...Rick Reinsp. fail C/N issued. 3/16/00 1:25:00 PM
|
BLD-Final | 3/10/2000 | 3/14/2000 | 3/14/2000 | P | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 03/10/2000 at 13:27:10. Contact: ###-####. Fail not ready 3/16/00 11:22:12 AM
|
Code Occupancy Approval | | | 3/7/2000 | | PASS |
|
|
|
Meets compliance with the requirements of CU-38-97
|
BLD-Final | 10/29/1999 | 10/29/1999 | 10/29/1999 | P | FAIL |
Joe Tawney
|
|
|
old temp occ last insp 07/01/98 follow up for perm occ. "Supervisor Inspection" tenant did not call in or was aware of insp. Temp. occ. Over one year old.
|
Case Summary (BLD) | | | 10/29/1999 | | DONE |
|
|
|
|
Code Occupancy Approval | | | 9/20/1999 | | FAIL |
|
|
|
It would appear, as near as can be determined from the sketchy plan on file that the conditions of approval have been met. in regards to the Conditional Use Permit. However, there is still "prohibited outdoor storage of misc. bldg. materials and etc." at the north side of structure on the premises. This is only seperated from the playground by an "orange plastic web construction fence." With a violation of this nature at a "child care facility" I am reluctant to sign off a "final approval". I will talk to George S. and Planning Dept. Phone call with Ms. Leatham was very non-productive, she claims they are using the material and are allowed this storage. I believe this Building Permit has expired without being finaled - therefore, no rights to store materials for building on the property exist.
Discussion with Scott Spjute on 9/22/99. There is no "storage area" requested or approved on the plans.
|
Temporary occupancy | | | 9/24/1998 | | PASS |
|
|
|
Temp. Occ. Cert. #3698 issued 9-24-98 to Mr. Toad Child Care.
|
Code Occupancy Approval | | | 8/24/1998 | | FAIL |
|
|
|
bOND $1,310. POSTED -Temp. signed. Need Trash enclosure, some painting (bldg.) plantings to comply with Plans dated approved by Susan Riggs on 2/7 or 9/98. (Plans with this date and approval stamp are not in the file for (CUP97-0038).
|
INSP - Final | 7/21/1998 | 7/21/1998 | 7/21/1998 | | FAIL |
Joe Tawney
|
|
|
/ / 406 - REINSP FAIL C/N STILL NOT COMPLETED FOR PERM OCC
|
INSP - Final | 7/2/1998 | 7/2/1998 | 7/2/1998 | P | NR |
|
|
|
07/02/98 338 - last thing today please / this is for a temp occ. anita 3 ###-#### other agencies not approved/ need p/z with bond. occ req card is on cathys desk
|
INSP-Final Inspection | 6/30/1998 | 7/1/1998 | 7/1/1998 | P | PART |
Joe Tawney
|
|
|
07/01/98 406 - anitia ###-#### OK FOR TEMP OCC ALARM SYST CALCS EXIT DOOR LANDINGS FIRE EXT
|
INSP - Final | 6/26/1998 | 6/29/1998 | 6/29/1998 | A | NR |
|
|
|
06/29/98 338 - temp occ. anita ###-#### no answer on contact # no occ re
|
INSP-Final Inspection | 6/26/1998 | 6/26/1998 | 6/26/1998 | P | FAIL |
Joe Tawney
|
|
|
06/26/98 406 - temp occ anita ###-#### ALARM SYSTEM FINAL FAIL STROBE INTENSITY BAT & VOLT DROP CALCS
|
INSP-Conference | 6/17/1998 | 6/17/1998 | 6/18/1998 | P | PART |
Joe Tawney
|
|
|
06/18/98 406 - CONF/ ANITA ###-#### PERRY GOING OUT TODAY ALSO. CONF ON ALARM SYSTEM AND EXITS
|
INSP - Framing/Rough-in | 6/16/1998 | 6/17/1998 | 6/17/1998 | A | PART |
|
|
|
06/18/98 338 - made ok to cover with ele insp blessing
|
Print Occupancy Form | | | 6/4/1998 | | |
|
|
|
|
Inspection Record Card- Bld | | | 6/4/1998 | | |
|
|
|
|
INSP - Framing/Rough-in | 6/1/1998 | 6/2/1998 | 6/2/1998 | A | NR |
|
|
|
06/02/98 338 - need to adjus plans to be congruant details do not match
|
INSP - Foundation | 5/4/1998 | 5/4/1998 | 5/4/1998 | P | PASS |
|
|
|
setbacks and grade made ok
|
90 day tracking............. | | 1/28/1998 | 4/28/1998 | | PEND |
|
|
|
|
Issue PAID IN FULL permit | | | 3/16/1998 | | |
|
|
|
|
Plan assigned to (M_O) | 1/29/1998 | | 3/13/1998 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 3/13/1998 | | |
|
|
|
|
Routing - PLAN CHECK | 3/13/1998 | | 3/13/1998 | | PASS |
|
|
|
|
Routing - FIRE | 3/12/1998 | | 3/13/1998 | | PASS |
|
|
|
|
Print Occupancy Form | | | 3/13/1998 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/13/1998 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 3/13/1998 | | |
|
|
|
|
Telephone call | | | 3/13/1998 | | |
|
|
|
left message that plans are ready
|
Plan resubmittals received | | | 3/12/1998 | | |
|
|
|
REVISED PLANS RECEIVED. MO
|
Routing - PUBLIC WORKS | 2/19/1998 | | 2/20/1998 | | PASS |
|
|
|
|
Routing - FIRE | 2/11/1998 | | 2/19/1998 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 2/6/1998 | | 2/11/1998 | | FAIL |
|
|
|
CORRECTIONS MAILED AND FAXED TO OWNER. MO
|
Plan resubmittals requested | | | 2/11/1998 | | FAIL |
|
|
|
CORRECTIONS MAIELD AND FAXED TO OWNER. MO
|
Routing - PLANNING | 2/2/1998 | | 2/5/1998 | | PASS |
|
|
|
X-REF: CUP97-0038. APPROVED BY SAR.
|
Routing - PUBLIC WORKS | 1/29/1998 | | 2/2/1998 | | FAIL |
|
|
|
CHECK WITH MIKE OTTO FOR FURTHER ROUTING. REQUIRES DRAINAGE PLAN REVISIONS. KMM
|
Plan routing begun/NEW & ADDTN | | | 1/29/1998 | | PASS |
|
|
|
|
Plan assigned to (MYS) | 1/28/1998 | | 1/29/1998 | | |
Marlene Southard
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 1/29/1998 | | PASS |
|
|
|
RECEIVED 2 COPIES OF ARCH. SHEETS AND 5 COPIES OF CIVIL SHEETS. PUT 2 CIVIL COPIES WITH ARCH. SHEETS LEFT 3 COPIES FOR BRIAN MURPHY. ALSO RECEIVED APPLICATION WITH A LETTER FROM DALE & ANITA LEATHAM REGARDING RIGHT OF WAY. NO PROJECT MANUEL OR STRUCTURAL CALCS. RECEIVED. ALL ROUTED TO P.W. KMM
|
Received Certificate of Value | | | 1/29/1998 | | PASS |
|
|
|
|
Application received | | | 1/28/1998 | | |
|
|
|
|
Case Summary (BLD) | | | | | |
|
|
|
|