Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD98-00298
StatusFinaled
Name RICHARD EVANS
Site Address 9357 W EMERALD ST
Project NameWESTPARK MEDICAL
Customer Number 
ePlanReviewNo
Description
WESTPARK MEDICAL * TO CONSTRUCT A 6306 SQ. FT.MEDICAL OFFICE BUILDING WITH TENANT IMPROVEMENTS. TO INCLUDE SITE WORK. ACHD approval required prior to occupancy, contact David Szplett (CUP-116-97). DRH97-0229 CUP97-0116 PC#069-98 ads
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  5/22/2003  
Receive PAYMENT IN FULL  5/11/1999
(F) Reprint permit  4/26/1999
Permanent occupancy  3/29/1999 PASS
Perm. Occ. Cert. #7706 issued 3-29-99 to Westpark Medical
INSP - Final3/26/19993/26/19993/26/1999 PASS
DetailsJoe Tawney
/ / 406 - REINSP OK FOR PER4M OCC
INSP - Final3/26/19993/26/19993/26/1999 PASS
DetailsCarl Dependahl
03/26/99 340 - ###-#### JANINE//FINAL OCCUPY fire ok; ok for c/o
INSP - Final3/25/19993/26/19993/26/1999PPASS
DetailsCarl Dependahl
###-#### JANINE//FINAL OCCUPY
Permanent Occupancy 3/26/19993/26/1999 DONE
Details
INSP - Final3/23/19993/23/19993/23/1999 PART
DetailsJoe Tawney
/ / 406 - REINSP OK EXC NEED NFPA 72 FORM
Fee Review-notes11/6/1998 1/27/1999
CHECK OUT THE ELECTRICAL VALUE
Fee Review-notes7/21/1998 1/27/1999 SUBS
ADDITIONAL VALUES FROM SUBS 4/26/99
INSP - Final11/9/199811/10/199811/12/1998APASS
Details
11/10/98 338 - made ok signed the occ req card on 111098 for the temp.
Temporary occupancy  11/12/1998 PASS
Temp. Occ. Cert. #3742 issued 11-12-98 to Westpark Medical.
INSP-Final Inspection11/9/199811/10/199811/10/1998APART
DetailsJoe Tawney
11/10/98 406 - RICHARD ###-#### REINSP OK FOR TEMP OCC HEAT IN RISER ROOM, KNOX BOX, NFPA FORM, FAX SIG
INSP-Final Inspection11/6/199811/9/199811/9/1998AFAIL
DetailsJoe Tawney
11/09/98 406 - RICHARD ###-#### FINAL FAIL ALARM SYSTEM, EMERG LIGHTS, RISER ROOM, EXIT LIGHTS
INSP - Final11/6/199811/9/199811/9/1998PCANC
Details
11/09/98 338 - cancelled by the contractor as fire life safety did not p
INSP-Final Inspection11/5/199811/6/199811/6/1998ANR
DetailsJoe Tawney
11/06/98 406 - RICH ###-#### FINAL NOT READY ì
INSP - Final11/5/199811/6/199811/6/1998PFAIL
DetailsCarl Dependahl
RICH ###-####...338 area, need fire/safety...no further insp performed.
Code Occupancy Approval  11/5/1998 PASS
Meets compliance - Pass
INSP - Final11/2/199811/4/199811/4/1998ANR
DetailsWes Worcester
11/04/98 342 - RICHARD ###-#### be sure to check for ventillation of the contractor about same 338
INSP-Sprinkler Rough-in/Hydro10/6/199810/6/199810/6/1998 PART
DetailsJoe Tawney
/ / 406 - OK ON ABOVE AND UNDERGROUND HYDRO TEST OK ON SPKLR ROUGH IN
INSP - Conference10/5/199810/5/199810/5/1998 PASS
DetailsAlan Hauser
/ / 350 - stop to see what was going on, haven't had any inspections h
INSP-Supply line flush9/30/19989/30/19989/30/1998 PART
DetailsJoe Tawney
/ / 406 - OK ON SUPPLY LINE FLUSH AND PARTIAL OK ON ROUGH IN REINSP RE
INSP - Framing/Rough-in9/22/19989/22/19989/22/1998PFAIL
Details
09/22/98 338 - called to explain
INSP - Framing/Rough-in8/3/19988/4/19988/4/1998APART
Details
08/04/98 338 - MADE OK TO HANG DRYWALL
INSP - Framing/Rough-in7/21/19987/22/19987/22/1998PPART
Details
07/22/98 338 - framing/ eric evans/ ###-#### need responsible person on
INSP - Framing/Rough-in6/1/19986/1/19986/2/1998PPART
Details
06/02/98 338 - ok for the s. and west ext walls of the /combustable
INSP - Concrete5/19/19985/20/19985/20/1998ANR
Details
late a.m. tony/###-#### suspended slab workers gone home no answer at access #
INSP - Foundation5/13/19985/14/19985/15/1998APART
Details
05/15/98 338 - POURED YEST.
90 day tracking............. 2/9/19985/10/1998
INSP - Foundation5/5/19985/5/19985/5/1998PFAIL
Details
05/05/98 338 - c/n issued approved plans do not match the work in progre
INSP - Foundation4/30/19985/1/19985/1/1998PPASS
DetailsWes Worcester
05/01/98 342 - early pm please tony ###-####
INSP - Foundation5/1/19985/1/19985/1/1998PPART
Details
made ok to pour the perimeted foundation walls only. r-bar is placed
(F) Reprint permit  4/27/1998
Issue PAID IN FULL permit  4/24/1998
Inspection Record Card- Bld  4/23/1998
PLANS/APPL TAKEN TO FRONT DESK  4/23/1998 PASS
Print Occupancy Form  4/23/1998
Telephone call  4/23/1998
called richard evans told him $ amount
Routing - PLAN CHECK4/3/1998 4/23/1998 PASS
PACKAGE #1 need ACHD PLANS with signature. See memo under ACHD routing
Plan assigned to (ADS)2/10/1998 4/23/1998 PASS
Details
Routing Off Site - A.C.H.D2/10/1998 4/22/1998 PASS
PACKAGE #2 CONTACTED RICHARD EVANS AT ###-#### TO TAKE PLANS OUT TO ACHD RICHARD BROUGHT IN ACHD CERTIFICATE OF FEES PAID #98-1260. CONFIRMED ADDRESS WITH JOYCE..DF Approved for construction by David Szplett. Need ACHD approval prior to occupancy. See the letter from ACHD dated 22 Apr.1998. ACHD file # CUP-116-97
Telephone call  4/20/1998 PEND
The day Mr. Evans brought in the ACHD fee receipt Arlan phoned him and told him we also need the signed plans from ACHD.
Routing - PUBLIC WORKS4/2/1998 4/2/1998 PASS
Routing - PLUMBING3/27/1998 3/31/1998 PASS
PACKAGE #1
Routing - PUBLIC WORKS3/24/1998 3/27/1998 FAIL
MARK KNOWLES TO SUPPLY SPECS IN ACCORDANCE TO FAX DATED 3-26-98.
Routing - PLAN CHECK3/23/1998 3/24/1998 PASS
Plan resubmittals received  3/24/1998
RECEIVED 2 COPIES OF REVISED SHEETS P-1 AND 2 COPIES OF REVIESED CIVIL SHEETS C-1.0 AND C1.1. ROUTED TO ARLAN. KMM
Routing - PLUMBING3/19/1998 3/23/1998 FAIL
Routing Off Site - STRUCTURAL3/19/1998 3/20/1998 PASS
SENT RESUBS TO ATWOOD, HINZMAN, JONES DAR 3-20-98 RECEIVED ENG. PACKAGE AND ONE RESPONSE LETTER FROM ATWOOD HINZMAN AND JONES DATED 3-19-98 - Letter stated that all their comments were adequately addressed.
Routing - FIRE3/11/1998 3/13/1998 PASS
pass - changes per M Knowlese letter 3/10/98 attached to plans
Routing - FIRE3/3/1998 3/9/1998 FAIL
PACKAGE #1
Routing - PLUMBING2/25/1998 3/2/1998 FAIL
PACKAGE #1
Routing - PLANNING2/19/1998 2/24/1998 PASS
PACKAGE #1 Design Review approved 2/25/98 by tkw
Plan resubmittals requested  2/23/1998 FAIL
Structural correction list faxed to architect.
Routing - PUBLIC WORKS2/11/1998 2/19/1998 FAIL
PACKAGE #1 GAVE 3 ADDITIONAL CIVIL DRAWINGS TO BRIAN MURPHY MARK KNOWLES TO SUPPLY SPECIFICATIONS FOR X-RAY MACHINE FOR RATING PURPOSES.
Routing Off Site - STRUCTURAL2/10/1998 2/17/1998
PACKAGE #3 CONTCTED PDQ TO TAKE PLANS OUT TO ATWOOD, HINZMAN AND JONES 2-17-98 RECEIVED ONE COPY OF PLANS AND ONE STRUCTURAL PLAN CHECK REVIEW COMMENTS AND 1 SET OF STRUCTURAL CALCS. ROUTED TO ARLAN SMITH. STORAGE ROOM
Plan resubmittals requested  2/11/1998 FAIL
Initial plan reveiw report faxed to Architect. This was an initial review and does not include engineering review of the structural design.
Routing - PLAN CHECK2/10/1998 2/10/1998
PACKAGE #1
Plan routing begun/NEW & ADDTN  2/10/1998 PASS
STILL REQUIRES ADDITIONAL STRUCT. CALCS FOR PACKAGE #1. CONTACTED RICHARD EVANS OF THIS NEED. 2-10-98 RECEIVED ADDITIONAL SET OF STRUCT. CALCS FROM MARK KNOWLES. ROUTED TO ARLAN SMITH
Plan assigned to (JCM)2/9/1998 2/10/1998 PASS
DetailsJohn Menard
Recd Pcfee & Taken To Pln CK  2/9/1998
Received Certificate of Value  2/9/1998 PASS
Plans ACCEPTED BY PLAN CHECK  2/9/1998 PASS
RECEIVED 5 PACKAGE SUBMITTAL. GAVE PACKAGE #3 TO JOHN FOR OUTSIDE ENG. WITH THIS SUBMITTAL I RECEIVED 3 EXTRA GRADING AND DRAINAGE PLANS WITH CALC.. GAVE TO BRIAN WITH PACKAGE #1. 02-10-98 JOHN STATED TO SEND OUT FOR ENG. I CONTACTED RICHARD EVANS TO LET HIM KNOW I STILL NEED AN ADDITIONAL SET OF STRUCT. CALCS FOR PACKAGE #1. 2-10-98 RECEIVED ADDITIONAL SET OF STRUCT. CALCS FOR PACKAGE #1 FROM MARK KNOWLES
Plan assigned to (MYS)2/9/1998 2/9/1998
DetailsMarlene Southard
Application received  2/6/1998