Fee Review-notes | 11/16/1998 | | 12/7/1998 | | |
|
|
|
|
Permanent Occupancy | | 9/30/1998 | 9/30/1998 | | DONE |
|
|
|
|
Permanent occupancy | | | 9/30/1998 | | PASS |
|
|
|
Perm. Occ. Cert. #7438 issued 9-30-98 to the Aramark Coffee Bar/Gift Shop.
|
INSP - Final | 9/29/1998 | 9/29/1998 | 9/29/1998 | P | PASS |
Jim Storey
|
|
|
09/29/98 301 - andy ###-#### FNL -OK FINAL pending ele sign. ì
|
INSP-Sprinkler Rough-in/Hydro | 9/25/1998 | 9/25/1998 | 9/25/1998 | P | PASS |
Rick Jackson
|
|
|
ANDY ###-#### occ approved for perm - not a sprinkler rough-in
|
INSP-Sprinkler Rough-in/Hydro | 9/16/1998 | 9/16/1998 | 9/16/1998 | P | FAIL |
Rick Jackson
|
|
|
ANDY ###-#### this was a final insp. sliding gate lock problem; sprinkler heads obstructed in coffee shop and storage room; alarms tested okay
|
INSP - Framing/Rough-in | 7/22/1998 | 7/22/1998 | 7/22/1998 | | PASS |
Jim Storey
|
|
|
/ / 301 - FRAM-OK FRAMING fire stopping of occ. septration in walls through floor
|
INSP - Framing/Rough-in | 7/17/1998 | 7/17/1998 | 7/17/1998 | | PART |
Jim Storey
|
|
|
07/17/98 301 - ARAMARK COFFEE BAR/GIFT SHOP/ ANDY SURMELIS/ ###-#### CORR-CORREC-CALL FOR REINSP WHEN COMPLETED fire stopping required at all assembly to be done and submital to be on site at reinsp ok to rock all locations that will be concealed in wall c
|
INSP - Framing/Rough-in | 7/16/1998 | 7/17/1998 | 7/17/1998 | P | PART |
Jim Storey
|
|
|
07/17/98 301 - floor fire stopping at 5 locations must have submittals a other walls ok for cover.
|
Issue PAID IN FULL permit | | | 6/9/1998 | | |
|
|
|
|
Telephone call | | | 6/4/1998 | | |
|
|
|
DAVE CALLED SAID THEY WOULD BE IN THE 11TH TO PICK UP
|
Telephone call | | | 5/27/1998 | | |
|
|
|
CHARLIE SAID THEY WILL BE IN WITHIN THE NEXT TWO WEEKS TO PICK UP THIS PERMIT..
|
Telephone call | | | 5/22/1998 | | PASS |
|
|
|
TALKED TO DAVE WARD, WILL PICK UP IN 2 WEEKS
|
90 day tracking............. | | 2/17/1998 | 5/18/1998 | | PEND |
|
|
|
|
Plan Reviewer's activity | | | 4/2/1998 | | PASS |
|
|
|
Drawings approved, with conditions, as noted and attached to the approved drawings.
|
Print permit w/o conditions | | | 4/2/1998 | | |
|
|
|
|
Telephone call | | | 4/2/1998 | | |
|
|
|
CALLED DAVE WARD GAVE HIM $ AMOUNT
|
Inspection Record Card- Bld | | | 4/2/1998 | | |
|
|
|
|
Print Occupancy Form | | | 4/2/1998 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/2/1998 | | PASS |
|
|
|
|
testing condition printout | | | 4/2/1998 | | |
|
|
|
|
Plan assigned to (CJW) | 2/20/1998 | | 4/2/1998 | | PASS |
Carl Westfall
|
|
|
04/02/98 10:42:18 CJW - this action updated by action script from <<>> in Case No. BLD98-0360
|
Plan resubmittals received | | | 4/1/1998 | | |
|
|
|
RECEIVED 1 COPY OF REVISED DETAIL FOR NEW COLUMN AND HEADER AT EXISTING TRUSS - DETAIL 18 ON SHEET A2.2 RECEIVED 1 COPY OF REVISED DETAIL FOR POST CONNECTION AT EXISTING JOIST GIRDER. ROUTED TO CARL. KMM
|
Plan resubmittals received | | | 3/20/1998 | | |
|
|
|
A letter was received from the Architect resolving all remaining issues.
|
Plan Reviewer's activity | | | 3/16/1998 | | |
|
|
|
Sent resubmittal review (2nd report) to the Architect. I Included the letter about occupancy separations signed by Tim Hogland and Renn Ross which resolved item #8.
|
Plan resubmittals requested | | | 3/16/1998 | | |
|
|
|
After the letter about occupancy separations signed by Tim Hogland & Renn Ross was received, an abbreviated report was sent to the architect. It contained items left unresolved by the latest resubmittal. A response from the architect was required.
|
Plan resubmittals received | | | 3/13/1998 | | |
|
|
|
RECEIVED TWO COPIES OF LETTER DATED 3-12-98 FROM CSHQA. TWO COPIES OF REVISED STRUCTURAL CALCS. TWO COPIES OF REVISED SHEETS A2.1 A2.2 P1.0,M1.0 AND E1.1 ROUTED TO CARL W.
|
Routing - FIRE | 3/5/1998 | | 3/9/1998 | | PASS |
|
|
|
|
Meeting | | | 3/5/1998 | | |
|
|
|
Talked with Curtis Cristal about this project. He wasn't very familiar with it. I gave him a preliminary report to deliver back to Larry Kalousek. Item 8 was blank since that issue was pending. The intent was to give the architect extra time to make changes. A final report will be sent when item 8 is resolved.
|
Plan Reviewer's activity | | | 3/4/1998 | | |
|
|
|
UBC plan review started March 4, 1998 and finished March 5, 1998. A response from the architect is required. See conditions list.
|
Routing - PLUMBING | 2/27/1998 | | 3/3/1998 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 2/27/1998 | | 2/27/1998 | | PASS |
|
|
|
|
Plan routing begun/TENANTS | | | 2/20/1998 | | |
|
|
|
Route to CENTRAL DISTRICT HEALTH, PUBLIC WORKS, PLUMBING, PLAN CHECK and FIRE.
|
Plan assigned to (MYS) | 2/17/1998 | | 2/20/1998 | | |
Marlene Southard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/17/1998 | | |
|
|
|
|
Application received | | | 2/17/1998 | | |
|
|
|
|
Routing Off Site - C.D.H | 2/23/1998 | | 1/26/1998 | | PASS |
|
|
|
CALLED DAVE WARD TO TAKE PLANS TO CDH 2/23/98. CSDI TELEPHONE ###-####.
|
Routing - PLAN CHECK | 3/9/1998 | | | | |
|
|
|
|