Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD98-00380
StatusFinaled
Name ALBERSTONS INC
Site Address 3041 PASADENA DR
Project NameALBERTSONS BENCH
Customer Number 
ePlanReviewNo
Description
ALBERTSONS BENCH PLAZA * TO CONSTRUCT A 61,871 SQ. FT., TYPE II-1HR, THREE STORY PLUS BASEMENT OFFICE SHELL ONLY BUILDING. OTHER WORK INCLUDES ALL SITE IMPROVEMENTS, PAVING AND LANDSCAPING. ALL WORK IS PER DRH97-0221, PC#092-98. FLOORS 1-3 HAVE 15,485 SQ. FT AND THE BASEMENT HAS 15,416 SQ. FT. FIRE SPRINKLERS ARE USED FOR ONE-HOUR SUBSTITUTION. NO OCCUPANCY IS ALLOWED UNDER THIS PERMIT. SEPARATE PERMITS ARE REQUIRED FOR ALL TENANT IMPROVEMENTS.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  11/19/1999 DONE
Letter of Compliance #18184 issued 11-19-99.
BLD-Final11/17/199911/18/199911/18/1999APASS
DetailsJim Storey
Final shell & core - Albertson's Bench Plaza
Code Occupancy Approval  11/1/1999 PASS
TRASH ENCLOSURE NOW SCREENED, ALL CONDITIONS NOW HAVE BEEN MET, FINAL SIGNED OFF AND BOND RELEASED.
CHANGE STATUS TO (TMP)  10/29/1999 DONE
INSP - Final8/12/19998/12/19998/12/1999PPART
DetailsJim Storey
08/12/99 301 - ok pewnding others on requist occ. card
INSP-Final Inspection8/12/19998/12/19998/12/1999PPASS
DetailsRick Jackson
dennis ###-#### shell occ approved
DOC - T/O Approved4/2/19994/2/19994/2/1999 PASS
DetailsJim Storey
/ / 301 - RECIEVED FINAL LETTER OF APPROVAL FROM SPECIAL INSP. WITH EN
Temporary occupancy  3/22/1999 PASS
Temp. Occ. Cert. #3797 issued 3-22-99 to Albertson's, Inc.
INSP - Final3/19/19993/19/19993/19/1999PPART
DetailsRick Jackson
/ / 409 - ADDRESS; KNOX BOX;
Code Occupancy Approval  3/11/1999 FAIL
BOND HAS BEEN POSTED FOR $6596.00 TEMPORARY OKED FOR SIGN OFF.
Fee Review-notes1/29/1999 2/23/1999
INSP-Final Inspection2/19/19992/19/19992/19/1999PPART
DetailsRick Jackson
temp occ okay
INSP-Alarm Testing2/17/19992/18/19992/18/1999PNR
DetailsRick Jackson
###-#### Dennis alarms/dampers not ready
INSP-Final Inspection2/16/19992/16/19992/16/1999PFAIL
DetailsRick Jackson
dampers not working; alarms not complete
INSP-Final Inspection2/8/19992/9/19992/10/1999PFAIL
DetailsRick Jackson
02/09/99 409 - DENNIS ###-#### test alarms; stairs not complete; sprinklers not complete; FDC caps; kno
INSP - Final1/28/19991/29/19992/1/1999PNR
DetailsJim Storey
01/29/99 301 - N.R
INSP-Final Inspection1/28/19991/29/19991/29/1999PFAIL
DetailsRick Jackson
DENNIS ###-#### FN FIRE INSP-1ST FLOOR BASEMENT alarms not complete
Code Occupancy Approval  1/29/1999 FAIL
A GENERATOR HAS BEEN LOCATED IN NORTH WEST CORNER OF LOT IN REQUIRED LANDSCAPE AREA, I INFORMED CONTRACTOR DENNIS CHERRY THAT THIS HAD TO BE REMOVED OR A MODIFICATION OBTAINED BY PLANNING, ALSO TO OBTAIN A TEMPORARY OCCUPANCY A BOND HAD TO BE POSTED FOR THE PLACEMENT OF REQUIRED LANDSCAPE HERE. I THEN RECEIVED A CALL QUESTIONING BOND REQUIREMENT. I INFORMED THEM THAT I WOULD REQUIRE A BOND FOR THE LANDSCAPE BUT THE GENERATOR WOULD REQUIRED A MODIFICATION TO THE DR.
INSP - Final1/20/19991/27/19991/27/1999PFAIL
DetailsJim Storey
01/27/99 301 - jennifer- ###-#### fn occ insp
INSP - Framing/Rough-in1/19/19991/20/19991/20/1999AFAIL
DetailsRick Jackson
01/20/99 409 - JENNIFER ###-#### sprinklers not ready; alarms not complete
INSP - Framing/Rough-in1/11/19991/12/19991/12/1999AFAIL
DetailsJim Storey
01/12/99 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP - Framing/Rough-in1/7/19991/7/19991/7/1999PPASS
DetailsJim Storey
01/07/99 301 - FRAM-OK FRAMING insulation ok
INSP - Framing/Rough-in12/21/199812/22/199812/22/1998APART
DetailsJim Storey
12/22/98 301 - Dennis Cherry ###-####
INSP - Framing/Rough-in12/16/199812/17/199812/17/1998AFAIL
DetailsRuss Owen
12/17/98 407 - RDTG-STOP WORK ORDER POSTED
SUPER- Supervisor's review12/17/199812/17/199812/17/1998
stop work placed by russ owen. no permit tenant improvement on first floor and generator building is an h occupancy with no approvals. stopwork and vacate those areas. Mcalvaine removed crew while I was their.
INSP - Framing/Rough-in12/7/199812/8/199812/8/1998AFAIL
DetailsJim Storey
12/08/98 301 - bathroom wall voids above hard ceilling grid ok to hang w
INSP - Framing/Rough-in11/24/199811/24/199811/24/1998PPART
DetailsJim Storey
11/24/98 301 - lobby c/n idem ok basement showers ok for hard lid fire s
INSP - Framing/Rough-in11/20/199811/23/199811/23/1998AFAIL
DetailsJim Storey
11/23/98 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP - Framing/Rough-in11/20/199811/20/199811/20/1998PFAIL
DetailsJim Storey
11/20/98 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP - Framing/Rough-in11/3/199811/4/199811/4/1998APART
DetailsWes Worcester
11/04/98 342 - DENNIS ###-####
INSP - Framing/Rough-in10/26/199810/26/199810/26/1998PPART
DetailsJim Storey
10/26/98 301 - dennis ###-#### FRAM-OK FRAMING ok for cover on first floor lobby area.
INSP-Supply line flush9/9/19989/9/19989/9/1998APASS
DetailsRick Jackson
underground flush okay
INSP - Framing/Rough-in9/8/19989/9/19989/9/1998AFAIL
DetailsJim Storey
09/09/98 301 - JENNIFER ###-#### requist for fire flush insp not framing per jennifer.
INSP - Framing/Rough-in8/31/19988/31/19988/31/1998 PART
DetailsJim Storey
08/28/98 301 - DENNIS BASEMENT ###-#### FRAM-OK FRAMING part ok to start gyp need reinsp for top of wall details putty pads.
INSP - Foundation8/12/19988/13/19988/13/1998APASS
DetailsJim Storey
08/13/98 301 - slab pour at 5:00 am dennis ###-#### 2dn floor deck ok pending special insp report on concrete.
INSP - Foundation7/15/19987/16/19987/16/1998APART
DetailsJim Storey
07/16/98 301 - covered with special insp. pending report
INSP - Foundation6/25/19986/25/19986/25/1998PPART
DetailsJim Storey
06/25/98 301 - placed with special insp. pending report.
INSP - Foundation6/18/19986/18/19986/19/1998PPART
DetailsRuss Owen
06/18/98 407 - Special inspector at site.
INSP - Foundation6/15/19986/16/19986/16/1998AFAIL
DetailsJim Storey
06/16/98 301 - REBAR NOT PER PLAN / ENGINEER OF RECORD TO SUBMIT REVISIO
INSP - Framing/Rough-in6/15/19986/16/19986/16/1998ACANC
DetailsJim Storey
06/16/98 301 - PENDING SPECIAL INSP. REPORT NOTED OTHER INSP. REQUIST SA
INSP - Foundation6/9/19986/11/19986/11/1998APART
DetailsJim Storey
06/11/98 301 - a wall pour approx. arround 11 a.m. spectial inspector on job site. dennis ###-#### covered w/special insp. pending report.
INSP - Framing/Rough-in6/5/19986/8/19986/8/1998APART
DetailsRuss Owen
06/08/98 407 - this job is under special inspection and is subject to re 9 and Wed 1:30 Dennis ###-####
INSP - Concrete6/4/19986/5/19986/5/1998APART
DetailsJim Storey
06/05/98 301 - special insp on site pending report
INSP - Foundation6/3/19986/4/19986/4/1998APART
DetailsJim Storey
06/04/98 301 - AIR INTRANMENT NOT TO SPEC. MONROCK AND MTI ON SITE TO AD
INSP - Foundation6/2/19986/3/19986/3/1998APART
DetailsJim Storey
06/03/98 301 - placed w/special insp. pending report / c/n fo pielaster
INSP - Concrete5/28/19985/29/19985/29/1998APASS
DetailsJim Storey
05/29/98 301 - pouring 50 yards/specal inspector on site/8:30
90 day tracking............. 2/18/19985/19/1998 PEND
INSP - Foundation5/18/19985/18/19985/18/1998PPART
DetailsJim Storey
05/18/98 301 - special insp. gary on site rebar ok
(F) Reprint permit  5/5/1998
Plan assigned to (MLO)2/23/1998 5/1/1998 PASS
DetailsMike Otto
Inspection Record Card- Bld  5/1/1998
PLANS/APPL TAKEN TO FRONT DESK  5/1/1998 PASS
Telephone call  5/1/1998
called dennis gave $ amount
Print Occupancy Form  5/1/1998
Issue PAID IN FULL permit  5/1/1998
Routing Off Site - A.C.H.D2/19/1998 4/30/1998 PASS
CONTACTED DAVID RUDEEN AT ###-#### TO TAKE PLANS OUT TO ACHD PACKAGE #2 ACHD FEES PAID RECEIPT #98-1419
Telephone call  4/27/1998 PEND
SPOKE WITH TED ISABELL FROM HOSFORD, LARSON, RUDEEN REGARDING PLAN APPROVAL FROM ACHD ALL REMAINING TO ISSUE PERMIT. MLO
Routing Off Site - STRUCTURAL4/17/1998 4/23/1998 PASS
Plan resubmittals received  4/17/1998 PEND
RECEIVED RESUBS FROM ATWOOD HINZMAN JONES, PASSED ON SAME TO MIKE OTTO 4/17/98
Routing - FIRE3/31/1998 4/9/1998 PASS
PACKAGE #1
Routing - PLAN CHECK3/19/1998 3/31/1998 PASS
Routing - PLUMBING3/17/1998 3/19/1998 PASS
PACKAGE #1
Routing - PLANNING2/25/1998 3/16/1998 PASS
PACKAGE #1, approved per DRH97-0221.
Routing Off Site - STRUCTURAL2/19/1998 3/13/1998 FAIL
PACKAGE #3 CONTACTED PDQ TO TAKE PLANS OUT TO CH2MHILL 3-13-98 RECEIVED ONE COPY OF STRUCTURAL REVIEW LETTER BY CHEMHILL DATED 3-12-98. ROUTED TO MIKE O. KMM
Plan resubmittals received  2/25/1998 PEND
RECEIVED ONE COPY OF THE SOILS REPORT TWO COPIES OF STRUCTRUAL CALCS ONE PROJECT MANUAL ROUTED TO MIKE OTTO.
Routing - PUBLIC WORKS2/19/1998 2/25/1998 PASS
PACKAGE #1
Plan assigned to (JCM)2/19/1998 2/23/1998 PASS
DetailsJohn Menard
Plans ACCEPTED BY PLAN CHECK  2/19/1998 PASS
Plan routing begun/NEW & ADDTN  2/19/1998 PASS
Received Certificate of Value  2/19/1998 PASS
Plan assigned to (MYS)2/18/1998 2/19/1998
DetailsMarlene Southard
Application received  2/18/1998
Recd Pcfee & Taken To Pln CK  2/18/1998 PEND