Letter of compliance | | | 11/19/1999 | | DONE |
|
|
|
Letter of Compliance #18184 issued 11-19-99.
|
BLD-Final | 11/17/1999 | 11/18/1999 | 11/18/1999 | A | PASS |
Jim Storey
|
|
|
Final shell & core - Albertson's Bench Plaza
|
Code Occupancy Approval | | | 11/1/1999 | | PASS |
|
|
|
TRASH ENCLOSURE NOW SCREENED, ALL CONDITIONS NOW HAVE BEEN MET, FINAL SIGNED OFF AND BOND RELEASED.
|
CHANGE STATUS TO (TMP) | | | 10/29/1999 | | DONE |
|
|
|
|
INSP - Final | 8/12/1999 | 8/12/1999 | 8/12/1999 | P | PART |
Jim Storey
|
|
|
08/12/99 301 - ok pewnding others on requist occ. card
|
INSP-Final Inspection | 8/12/1999 | 8/12/1999 | 8/12/1999 | P | PASS |
Rick Jackson
|
|
|
dennis ###-#### shell occ approved
|
DOC - T/O Approved | 4/2/1999 | 4/2/1999 | 4/2/1999 | | PASS |
Jim Storey
|
|
|
/ / 301 - RECIEVED FINAL LETTER OF APPROVAL FROM SPECIAL INSP. WITH EN
|
Temporary occupancy | | | 3/22/1999 | | PASS |
|
|
|
Temp. Occ. Cert. #3797 issued 3-22-99 to Albertson's, Inc.
|
INSP - Final | 3/19/1999 | 3/19/1999 | 3/19/1999 | P | PART |
Rick Jackson
|
|
|
/ / 409 - ADDRESS; KNOX BOX;
|
Code Occupancy Approval | | | 3/11/1999 | | FAIL |
|
|
|
BOND HAS BEEN POSTED FOR $6596.00 TEMPORARY OKED FOR SIGN OFF.
|
Fee Review-notes | 1/29/1999 | | 2/23/1999 | | |
|
|
|
|
INSP-Final Inspection | 2/19/1999 | 2/19/1999 | 2/19/1999 | P | PART |
Rick Jackson
|
|
|
temp occ okay
|
INSP-Alarm Testing | 2/17/1999 | 2/18/1999 | 2/18/1999 | P | NR |
Rick Jackson
|
|
|
###-#### Dennis alarms/dampers not ready
|
INSP-Final Inspection | 2/16/1999 | 2/16/1999 | 2/16/1999 | P | FAIL |
Rick Jackson
|
|
|
dampers not working; alarms not complete
|
INSP-Final Inspection | 2/8/1999 | 2/9/1999 | 2/10/1999 | P | FAIL |
Rick Jackson
|
|
|
02/09/99 409 - DENNIS ###-#### test alarms; stairs not complete; sprinklers not complete; FDC caps; kno
|
INSP - Final | 1/28/1999 | 1/29/1999 | 2/1/1999 | P | NR |
Jim Storey
|
|
|
01/29/99 301 - N.R
|
INSP-Final Inspection | 1/28/1999 | 1/29/1999 | 1/29/1999 | P | FAIL |
Rick Jackson
|
|
|
DENNIS ###-#### FN FIRE INSP-1ST FLOOR BASEMENT alarms not complete
|
Code Occupancy Approval | | | 1/29/1999 | | FAIL |
|
|
|
A GENERATOR HAS BEEN LOCATED IN NORTH WEST CORNER OF LOT IN REQUIRED LANDSCAPE AREA, I INFORMED CONTRACTOR DENNIS CHERRY THAT THIS HAD TO BE REMOVED OR A MODIFICATION OBTAINED BY PLANNING, ALSO TO OBTAIN A TEMPORARY OCCUPANCY A BOND HAD TO BE POSTED FOR THE PLACEMENT OF REQUIRED LANDSCAPE HERE. I THEN RECEIVED A CALL QUESTIONING BOND REQUIREMENT. I INFORMED THEM THAT I WOULD REQUIRE A BOND FOR THE LANDSCAPE BUT THE GENERATOR WOULD REQUIRED A MODIFICATION TO THE DR.
|
INSP - Final | 1/20/1999 | 1/27/1999 | 1/27/1999 | P | FAIL |
Jim Storey
|
|
|
01/27/99 301 - jennifer- ###-#### fn occ insp
|
INSP - Framing/Rough-in | 1/19/1999 | 1/20/1999 | 1/20/1999 | A | FAIL |
Rick Jackson
|
|
|
01/20/99 409 - JENNIFER ###-#### sprinklers not ready; alarms not complete
|
INSP - Framing/Rough-in | 1/11/1999 | 1/12/1999 | 1/12/1999 | A | FAIL |
Jim Storey
|
|
|
01/12/99 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/Rough-in | 1/7/1999 | 1/7/1999 | 1/7/1999 | P | PASS |
Jim Storey
|
|
|
01/07/99 301 - FRAM-OK FRAMING insulation ok
|
INSP - Framing/Rough-in | 12/21/1998 | 12/22/1998 | 12/22/1998 | A | PART |
Jim Storey
|
|
|
12/22/98 301 - Dennis Cherry ###-####
|
INSP - Framing/Rough-in | 12/16/1998 | 12/17/1998 | 12/17/1998 | A | FAIL |
Russ Owen
|
|
|
12/17/98 407 - RDTG-STOP WORK ORDER POSTED
|
SUPER- Supervisor's review | 12/17/1998 | 12/17/1998 | 12/17/1998 | | |
|
|
|
stop work placed by russ owen. no permit tenant improvement on first floor and generator building is an h occupancy with no approvals. stopwork and vacate those areas. Mcalvaine removed crew while I was their.
|
INSP - Framing/Rough-in | 12/7/1998 | 12/8/1998 | 12/8/1998 | A | FAIL |
Jim Storey
|
|
|
12/08/98 301 - bathroom wall voids above hard ceilling grid ok to hang w
|
INSP - Framing/Rough-in | 11/24/1998 | 11/24/1998 | 11/24/1998 | P | PART |
Jim Storey
|
|
|
11/24/98 301 - lobby c/n idem ok basement showers ok for hard lid fire s
|
INSP - Framing/Rough-in | 11/20/1998 | 11/23/1998 | 11/23/1998 | A | FAIL |
Jim Storey
|
|
|
11/23/98 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/Rough-in | 11/20/1998 | 11/20/1998 | 11/20/1998 | P | FAIL |
Jim Storey
|
|
|
11/20/98 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/Rough-in | 11/3/1998 | 11/4/1998 | 11/4/1998 | A | PART |
Wes Worcester
|
|
|
11/04/98 342 - DENNIS ###-####
|
INSP - Framing/Rough-in | 10/26/1998 | 10/26/1998 | 10/26/1998 | P | PART |
Jim Storey
|
|
|
10/26/98 301 - dennis ###-#### FRAM-OK FRAMING ok for cover on first floor lobby area.
|
INSP-Supply line flush | 9/9/1998 | 9/9/1998 | 9/9/1998 | A | PASS |
Rick Jackson
|
|
|
underground flush okay
|
INSP - Framing/Rough-in | 9/8/1998 | 9/9/1998 | 9/9/1998 | A | FAIL |
Jim Storey
|
|
|
09/09/98 301 - JENNIFER ###-#### requist for fire flush insp not framing per jennifer.
|
INSP - Framing/Rough-in | 8/31/1998 | 8/31/1998 | 8/31/1998 | | PART |
Jim Storey
|
|
|
08/28/98 301 - DENNIS BASEMENT ###-#### FRAM-OK FRAMING part ok to start gyp need reinsp for top of wall details putty pads.
|
INSP - Foundation | 8/12/1998 | 8/13/1998 | 8/13/1998 | A | PASS |
Jim Storey
|
|
|
08/13/98 301 - slab pour at 5:00 am dennis ###-#### 2dn floor deck ok pending special insp report on concrete.
|
INSP - Foundation | 7/15/1998 | 7/16/1998 | 7/16/1998 | A | PART |
Jim Storey
|
|
|
07/16/98 301 - covered with special insp. pending report
|
INSP - Foundation | 6/25/1998 | 6/25/1998 | 6/25/1998 | P | PART |
Jim Storey
|
|
|
06/25/98 301 - placed with special insp. pending report.
|
INSP - Foundation | 6/18/1998 | 6/18/1998 | 6/19/1998 | P | PART |
Russ Owen
|
|
|
06/18/98 407 - Special inspector at site.
|
INSP - Foundation | 6/15/1998 | 6/16/1998 | 6/16/1998 | A | FAIL |
Jim Storey
|
|
|
06/16/98 301 - REBAR NOT PER PLAN / ENGINEER OF RECORD TO SUBMIT REVISIO
|
INSP - Framing/Rough-in | 6/15/1998 | 6/16/1998 | 6/16/1998 | A | CANC |
Jim Storey
|
|
|
06/16/98 301 - PENDING SPECIAL INSP. REPORT NOTED OTHER INSP. REQUIST SA
|
INSP - Foundation | 6/9/1998 | 6/11/1998 | 6/11/1998 | A | PART |
Jim Storey
|
|
|
06/11/98 301 - a wall pour approx. arround 11 a.m. spectial inspector on job site. dennis ###-#### covered w/special insp. pending report.
|
INSP - Framing/Rough-in | 6/5/1998 | 6/8/1998 | 6/8/1998 | A | PART |
Russ Owen
|
|
|
06/08/98 407 - this job is under special inspection and is subject to re 9 and Wed 1:30 Dennis ###-####
|
INSP - Concrete | 6/4/1998 | 6/5/1998 | 6/5/1998 | A | PART |
Jim Storey
|
|
|
06/05/98 301 - special insp on site pending report
|
INSP - Foundation | 6/3/1998 | 6/4/1998 | 6/4/1998 | A | PART |
Jim Storey
|
|
|
06/04/98 301 - AIR INTRANMENT NOT TO SPEC. MONROCK AND MTI ON SITE TO AD
|
INSP - Foundation | 6/2/1998 | 6/3/1998 | 6/3/1998 | A | PART |
Jim Storey
|
|
|
06/03/98 301 - placed w/special insp. pending report / c/n fo pielaster
|
INSP - Concrete | 5/28/1998 | 5/29/1998 | 5/29/1998 | A | PASS |
Jim Storey
|
|
|
05/29/98 301 - pouring 50 yards/specal inspector on site/8:30
|
90 day tracking............. | | 2/18/1998 | 5/19/1998 | | PEND |
|
|
|
|
INSP - Foundation | 5/18/1998 | 5/18/1998 | 5/18/1998 | P | PART |
Jim Storey
|
|
|
05/18/98 301 - special insp. gary on site rebar ok
|
(F) Reprint permit | | | 5/5/1998 | | |
|
|
|
|
Plan assigned to (MLO) | 2/23/1998 | | 5/1/1998 | | PASS |
Mike Otto
|
|
|
|
Inspection Record Card- Bld | | | 5/1/1998 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/1/1998 | | PASS |
|
|
|
|
Telephone call | | | 5/1/1998 | | |
|
|
|
called dennis gave $ amount
|
Print Occupancy Form | | | 5/1/1998 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/1/1998 | | |
|
|
|
|
Routing Off Site - A.C.H.D | 2/19/1998 | | 4/30/1998 | | PASS |
|
|
|
CONTACTED DAVID RUDEEN AT ###-#### TO TAKE PLANS OUT TO ACHD PACKAGE #2 ACHD FEES PAID RECEIPT #98-1419
|
Telephone call | | | 4/27/1998 | | PEND |
|
|
|
SPOKE WITH TED ISABELL FROM HOSFORD, LARSON, RUDEEN REGARDING PLAN APPROVAL FROM ACHD ALL REMAINING TO ISSUE PERMIT. MLO
|
Routing Off Site - STRUCTURAL | 4/17/1998 | | 4/23/1998 | | PASS |
|
|
|
|
Plan resubmittals received | | | 4/17/1998 | | PEND |
|
|
|
RECEIVED RESUBS FROM ATWOOD HINZMAN JONES, PASSED ON SAME TO MIKE OTTO 4/17/98
|
Routing - FIRE | 3/31/1998 | | 4/9/1998 | | PASS |
|
|
|
PACKAGE #1
|
Routing - PLAN CHECK | 3/19/1998 | | 3/31/1998 | | PASS |
|
|
|
|
Routing - PLUMBING | 3/17/1998 | | 3/19/1998 | | PASS |
|
|
|
PACKAGE #1
|
Routing - PLANNING | 2/25/1998 | | 3/16/1998 | | PASS |
|
|
|
PACKAGE #1, approved per DRH97-0221.
|
Routing Off Site - STRUCTURAL | 2/19/1998 | | 3/13/1998 | | FAIL |
|
|
|
PACKAGE #3 CONTACTED PDQ TO TAKE PLANS OUT TO CH2MHILL 3-13-98 RECEIVED ONE COPY OF STRUCTURAL REVIEW LETTER BY CHEMHILL DATED 3-12-98. ROUTED TO MIKE O. KMM
|
Plan resubmittals received | | | 2/25/1998 | | PEND |
|
|
|
RECEIVED ONE COPY OF THE SOILS REPORT TWO COPIES OF STRUCTRUAL CALCS ONE PROJECT MANUAL ROUTED TO MIKE OTTO.
|
Routing - PUBLIC WORKS | 2/19/1998 | | 2/25/1998 | | PASS |
|
|
|
PACKAGE #1
|
Plan assigned to (JCM) | 2/19/1998 | | 2/23/1998 | | PASS |
John Menard
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 2/19/1998 | | PASS |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 2/19/1998 | | PASS |
|
|
|
|
Received Certificate of Value | | | 2/19/1998 | | PASS |
|
|
|
|
Plan assigned to (MYS) | 2/18/1998 | | 2/19/1998 | | |
Marlene Southard
|
|
|
|
Application received | | | 2/18/1998 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/18/1998 | | PEND |
|
|
|
|