Permit Information
Permit NumberBLD98-00383
StatusFinaled
Name MILLERS OUTPOST
Site Address 350 N MILWAUKEE ST Unit: 2104
Project NameBTS - #2104
Customer Number 
ePlanReviewNo
Description
To create a new 5,082 sq. ft. tenant space for Millers Outpost by remodeling a portion of an existing 6,655 sq.ft. space per approved plans, notes & attachments on file. Work to include construction of a new tenant demising wall along the South end of the Stockroom & portion of Sales Area and along the front 59 feet of the East side of the tenant space, leaving a new unoccupied area of approximately 1,180 sq. ft. at the Southeast corner outside of the new tenant space. To construct new noncombustible, nonbearing walls to create accessible restroom, storage areas & dressing rooms. To install new storefront framing, glazing, rolling grill door assembly, portions of ceiling assemblies, mechanical & electrical. NOTE: This building is fully fire sprinklered with a smoke exhaust system. Separate electrical, plumbing & mechanical permits are required. (P.C.#086-98)/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 1/12/19991/12/1999 DONE
Details
INSP - Final1/7/19991/7/19991/12/1999PPASS
Details
01/07/99 338 - made ok for the final with code signoff
Permanent occupancy  1/12/1999 PASS
Perm. Occ. Cert. #7589 issued 1-12-98 to Miller's Outpost at Boise Towne Square.
INSP-Final Inspection12/16/199812/16/199812/16/1998 PASS
DetailsJoe Tawney
12/16/98 406 - LATE PM PLEASE..LARRY ###-#### REINSP OK FOR PERM OCC
INSP-Final Inspection12/8/199812/8/199812/8/1998PFAIL
DetailsJoe Tawney
12/08/98 406 - LARRY ###-#### PERM OCC REINSP FAIL C/N NOT COMPLETED COULD NOT REACH CONTRACTOR
INSP-Final Inspection5/27/19985/28/19985/28/1998APART
DetailsJoe Tawney
05/28/98 406 - LARRY ###-####-UNIT 2104 REINSP OK FOR TEMP OCC SPKLR HEADS DOOR HDWRE SMOKE DET
INSP - Final5/27/19985/28/19985/28/1998APART
Details
oktfor 406 to sign occ req card for temp
INSP-Final Inspection5/26/19985/27/19985/27/1998AFAIL
DetailsJoe Tawney
05/27/98 406 - call perry he is going out same time FINAL FAIL EXIT DOORS SPKLR PROTECTION EXHAUST GRILLS
INSP - Final5/26/19985/27/19985/27/1998APART
Details
call joe so you two can go together ok/pe
INSP-Final Inspection5/21/19985/26/19985/26/1998ANR
Details
###-#### nr no fire
INSP - Final5/21/19985/26/19985/26/1998PNR
Details
###-#### still need fire
INSP - Framing/Rough-in4/30/19985/1/19985/1/1998PPASS
Details
ok for temp occ
INSP - Framing/Rough-in4/29/19984/29/19984/29/1998PPASS
Details
MADE OK TO COVER
INSP - Framing/Rough-in4/29/19984/29/19984/29/1998 PART
Details
04/30/98 338 - made ok to continue with ele, plmg approvals
INSP - Framing/Rough-in4/29/19984/29/19984/29/1998 PART
Details
04/30/98 338 - made ok to continue with ele, plmg approvals
INSP - Framing/Rough-in4/21/19984/22/19984/22/1998APART
Details
04/22/98 338 - MADE OK TO DROP IN CEILING TILES RECIEVED SUBMITTALS ON T
INSP - Framing/Rough-in4/16/19984/17/19984/17/1998APART
Details
04/17/98 338 - NEED TO COMPLETE THE DEMISING WALL AT THE FRONT OF THIS S
PLANS/APPL TAKEN TO FRONT DESK  4/13/1998 PASS
Processing for issuance of permit.
Print Occupancy Form  4/13/1998
Telephone call  4/13/1998
CALLED LARRY AT GREY WOLFE CONST
Issue PAID IN FULL permit  4/13/1998
Inspection Record Card- Bld  4/13/1998
Routing - PLAN CHECK4/10/1998 4/10/1998 0418
Received faxed verification from JP Realty, Debbie Duffield that plan re-submittals are acceptable. Processing for issuance of permit.
Print Pending Permit.LaserJet4  4/10/1998 PASS
Modifications to tenant space size, use layout and occupant load. Altered permit to reflect same. Processing for issuance.
Telephone call  4/10/1998
Call from Debbie Duffield. Said plans were okay as far as meeting mall requirements per Rich Ryberg, Mall site construction coordinator and she will fax me an approval letter.
Plan resubmittals received  4/10/1998 PASS
Plans submitted in response to the plan review comments, received 4/2/98, had not routed through JP Realty Tenant Cordinator as agreed. I called Debbie Duffield, tenant coordinator. She worked with the architect to have a set of the re-done plans submitted to her. She felt uncomfortable about some of the design information and sought help from JP Personel. On 4/10/98 she called to tell me that she had Rich Ryberg, limited owner of JP Realtor and on site mall construction coordinator. He thought everything looked okay. I asked Debbie to fax me a statement to that effect on JP Realty letterhead that I could attach to the plan and put in file.
Plan assigned to (DRS)2/20/1998 4/10/1998 PASS
DetailsDan Stuart
04/10/98 13:21:36 DRS - this action updated by action script from <<>> in Case No. BLD98-0383
Telephone call  4/7/1998
Call from Larry, Timberwolf Const., contractor for project, checking on status. I told him what was holding things up and said we would call him as soon as permit is ready.
Telephone call  4/7/1998
Debbie called to let me know she should hav a set of plans from architect by the end of week. Would let me know if okay as soon as possible. I reviewed with her som of my concerns as far as support of storefront to floor.
Routing - PLAN CHECK3/16/1998 4/6/1998
Received resubmittal plans on my desk. Three complete sets returned but had not reouted through JP Realty. Called Debbie Duffield, Tenant Coordinator, but she wasn't in. Left message for her to call me.Assembled new plans in with old & reviewed. Waiting for call.
Telephone call  4/3/1998
Call to Debbie Duffield concerning plan approval. Left voice mail to call me.
Plan resubmittals received  4/2/1998
RECEIVED 3 COPIES OF A-4 &A-4.1, REVISED STOREFRONT FRAMING TO BE FLOOR SUPPORTED AND ADDED STOREFRONT/ROLLING GRILLE DETAILS AND CALCULATIONS. 2. A-2, REVISED DETAIL CALL OUTS TO 13/A-2 AND 9/A-2, NON-DECK ATTACHMENT 3. A-2, REVISED ATTACHMENT DETAILS. LANDLORD TO PROVIDE LETTER OF APPROVAL 4. 1/A-6 REVISED METAL STUD SCHEDULE TO MATCH REPORT #1715 5. A-4.1 ADDED DETAIL TO PROVIDE CLARIFICATION 6. A-4.1 ADDED DETAILS 7. 1/A-5, 7A/A-5 ADDED DIMENSIONS FOR CLARIFICATION 8. 3/A-3 SIGN IS UNDER SEPARATE PERMIT. SIGN MFG. TO PROVIDE SHOP DRAWINGS 9. 1/A-5 & A-7 REVISED THE DOOR SYMBOLS & SCHEDULE TO CLARIFY USE & FIRE PROTECTION NOTES. 10. A-5 ADDED NOTE "O" TO GENERAL NOTES 5/A-5 11. A-7 NOTE IS ON DOOR SCHEDULE FOR DOORS 1B, 3&7 12. 10/T-2, ADDED NOTE #10 13. 10/T-2 ADDED NOTE #11 14. N/A GENERAL CONTRACTOR WILL PROVIDE 15. 3 T-2 ADDED NOTE 16. A-1 ADDED NOTE "DD" 17. 1/A-1 NOTES ARE UNDER FIRE SPRINKLERS 1/A-1 ADDED NOTE FOR SECTION 404.3.5 4/A-7 ADDED NOTES TO DOOR #1B 18. N/A GENERAL CONTRACTOR WILL PROVIDE 19. N/A 20. T-2/SP-1 NOTES ARE UNDER BENERAL NOTES AND ADA NOTES 21. A-3 ADDED NOTE "H" 22. N/A PASS NOTE TO GENERAL CONTRACTOR RECEIVED 3 COPIES OF THE ABOVE MENTIONED ITEMS. ONE LETTER REGARDING PLAN REVIEW. ROUTED TO DAN STUART. KMM
Routing - FIRE3/12/1998 3/16/1998 PASS
Plan Reviewer's activity  3/12/1998 PEND
Finished preliminary plan review. Faxed copy to architect and mailed hard copy. Faxed copy to Kevin Korthuis & Debby Duffield at JP Realty. Routinh plans to F.D. for review.
Plan resubmittals requested  3/12/1998 PEND
Print Pending Permit.LaserJet4  3/12/1998 PEND
Routing - PLAN CHECK3/9/1998 3/11/1998 PEND
Performed plan review. Copy to architect of listed of needed corrections. Routing to Fire Dept. for review.
Telephone call  3/10/1998
Call to Debby Duffield, Tenant Coordinator, JP Realty. Last two plans presented for permits have been incomplete as to store front framing and connection details. Also notes on plans from JP Realty review, required as a condition of presenting plans for review to Boise City, specify items that are not allowed per original mall design in 1988. Several of the noncomplying items are shown on the plan, such as hanging storefront from roof structure, attaching directly to roof deck and wrong minimum plate sizes on columns at storefront grill. I called to ask why plans that are incorrect have not been rejected back to architect before being presented to city for plan review as I will have to reject them anyway. This adds to the processing time as the plans sit until I can get to them and then when I do they are incorrect and I have to wait for new submittals. If an obvious deficiencies was handled at the mall review then I could posible process with correction list that could be handled in the field by the inspector at time of frame inspection. Debby had asked Kevin Korthuis, Dir. of Tenant Coordination, to listen in on conversation, Hopefully this will help plan processing for future tenant submittals.
Routing - PLAN CHECK2/24/1998 3/9/1998
Picked up plan to start review.
Routing - PUBLIC WORKS2/23/1998 2/23/1998 PASS
Plan routing begun/TENANTS  2/20/1998
Route to PUBLIC WORKS, PLAN CHECK and FIRE.
Application received  2/18/1998