Permanent Occupancy | | 1/12/1999 | 1/12/1999 | | DONE |
|
|
|
|
INSP - Final | 1/7/1999 | 1/7/1999 | 1/12/1999 | P | PASS |
|
|
|
01/07/99 338 - made ok for the final with code signoff
|
Permanent occupancy | | | 1/12/1999 | | PASS |
|
|
|
Perm. Occ. Cert. #7589 issued 1-12-98 to Miller's Outpost at Boise Towne Square.
|
INSP-Final Inspection | 12/16/1998 | 12/16/1998 | 12/16/1998 | | PASS |
Joe Tawney
|
|
|
12/16/98 406 - LATE PM PLEASE..LARRY ###-#### REINSP OK FOR PERM OCC
|
INSP-Final Inspection | 12/8/1998 | 12/8/1998 | 12/8/1998 | P | FAIL |
Joe Tawney
|
|
|
12/08/98 406 - LARRY ###-#### PERM OCC REINSP FAIL C/N NOT COMPLETED COULD NOT REACH CONTRACTOR
|
INSP-Final Inspection | 5/27/1998 | 5/28/1998 | 5/28/1998 | A | PART |
Joe Tawney
|
|
|
05/28/98 406 - LARRY ###-####-UNIT 2104 REINSP OK FOR TEMP OCC SPKLR HEADS DOOR HDWRE SMOKE DET
|
INSP - Final | 5/27/1998 | 5/28/1998 | 5/28/1998 | A | PART |
|
|
|
oktfor 406 to sign occ req card for temp
|
INSP-Final Inspection | 5/26/1998 | 5/27/1998 | 5/27/1998 | A | FAIL |
Joe Tawney
|
|
|
05/27/98 406 - call perry he is going out same time FINAL FAIL EXIT DOORS SPKLR PROTECTION EXHAUST GRILLS
|
INSP - Final | 5/26/1998 | 5/27/1998 | 5/27/1998 | A | PART |
|
|
|
call joe so you two can go together ok/pe
|
INSP-Final Inspection | 5/21/1998 | 5/26/1998 | 5/26/1998 | A | NR |
|
|
|
###-#### nr no fire
|
INSP - Final | 5/21/1998 | 5/26/1998 | 5/26/1998 | P | NR |
|
|
|
###-#### still need fire
|
INSP - Framing/Rough-in | 4/30/1998 | 5/1/1998 | 5/1/1998 | P | PASS |
|
|
|
ok for temp occ
|
INSP - Framing/Rough-in | 4/29/1998 | 4/29/1998 | 4/29/1998 | P | PASS |
|
|
|
MADE OK TO COVER
|
INSP - Framing/Rough-in | 4/29/1998 | 4/29/1998 | 4/29/1998 | | PART |
|
|
|
04/30/98 338 - made ok to continue with ele, plmg approvals
|
INSP - Framing/Rough-in | 4/29/1998 | 4/29/1998 | 4/29/1998 | | PART |
|
|
|
04/30/98 338 - made ok to continue with ele, plmg approvals
|
INSP - Framing/Rough-in | 4/21/1998 | 4/22/1998 | 4/22/1998 | A | PART |
|
|
|
04/22/98 338 - MADE OK TO DROP IN CEILING TILES RECIEVED SUBMITTALS ON T
|
INSP - Framing/Rough-in | 4/16/1998 | 4/17/1998 | 4/17/1998 | A | PART |
|
|
|
04/17/98 338 - NEED TO COMPLETE THE DEMISING WALL AT THE FRONT OF THIS S
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/13/1998 | | PASS |
|
|
|
Processing for issuance of permit.
|
Print Occupancy Form | | | 4/13/1998 | | |
|
|
|
|
Telephone call | | | 4/13/1998 | | |
|
|
|
CALLED LARRY AT GREY WOLFE CONST
|
Issue PAID IN FULL permit | | | 4/13/1998 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/13/1998 | | |
|
|
|
|
Routing - PLAN CHECK | 4/10/1998 | | 4/10/1998 | | 0418 |
|
|
|
Received faxed verification from JP Realty, Debbie Duffield that plan re-submittals are acceptable. Processing for issuance of permit.
|
Print Pending Permit.LaserJet4 | | | 4/10/1998 | | PASS |
|
|
|
Modifications to tenant space size, use layout and occupant load. Altered permit to reflect same. Processing for issuance.
|
Telephone call | | | 4/10/1998 | | |
|
|
|
Call from Debbie Duffield. Said plans were okay as far as meeting mall requirements per Rich Ryberg, Mall site construction coordinator and she will fax me an approval letter.
|
Plan resubmittals received | | | 4/10/1998 | | PASS |
|
|
|
Plans submitted in response to the plan review comments, received 4/2/98, had not routed through JP Realty Tenant Cordinator as agreed. I called Debbie Duffield, tenant coordinator. She worked with the architect to have a set of the re-done plans submitted to her. She felt uncomfortable about some of the design information and sought help from JP Personel. On 4/10/98 she called to tell me that she had Rich Ryberg, limited owner of JP Realtor and on site mall construction coordinator. He thought everything looked okay. I asked Debbie to fax me a statement to that effect on JP Realty letterhead that I could attach to the plan and put in file.
|
Plan assigned to (DRS) | 2/20/1998 | | 4/10/1998 | | PASS |
Dan Stuart
|
|
|
04/10/98 13:21:36 DRS - this action updated by action script from <<>> in Case No. BLD98-0383
|
Telephone call | | | 4/7/1998 | | |
|
|
|
Call from Larry, Timberwolf Const., contractor for project, checking on status. I told him what was holding things up and said we would call him as soon as permit is ready.
|
Telephone call | | | 4/7/1998 | | |
|
|
|
Debbie called to let me know she should hav a set of plans from architect by the end of week. Would let me know if okay as soon as possible. I reviewed with her som of my concerns as far as support of storefront to floor.
|
Routing - PLAN CHECK | 3/16/1998 | | 4/6/1998 | | |
|
|
|
Received resubmittal plans on my desk. Three complete sets returned but had not reouted through JP Realty. Called Debbie Duffield, Tenant Coordinator, but she wasn't in. Left message for her to call me.Assembled new plans in with old & reviewed. Waiting for call.
|
Telephone call | | | 4/3/1998 | | |
|
|
|
Call to Debbie Duffield concerning plan approval. Left voice mail to call me.
|
Plan resubmittals received | | | 4/2/1998 | | |
|
|
|
RECEIVED 3 COPIES OF A-4 &A-4.1, REVISED STOREFRONT FRAMING TO BE FLOOR SUPPORTED AND ADDED STOREFRONT/ROLLING GRILLE DETAILS AND CALCULATIONS. 2. A-2, REVISED DETAIL CALL OUTS TO 13/A-2 AND 9/A-2, NON-DECK ATTACHMENT 3. A-2, REVISED ATTACHMENT DETAILS. LANDLORD TO PROVIDE LETTER OF APPROVAL 4. 1/A-6 REVISED METAL STUD SCHEDULE TO MATCH REPORT #1715 5. A-4.1 ADDED DETAIL TO PROVIDE CLARIFICATION 6. A-4.1 ADDED DETAILS 7. 1/A-5, 7A/A-5 ADDED DIMENSIONS FOR CLARIFICATION 8. 3/A-3 SIGN IS UNDER SEPARATE PERMIT. SIGN MFG. TO PROVIDE SHOP DRAWINGS 9. 1/A-5 & A-7 REVISED THE DOOR SYMBOLS & SCHEDULE TO CLARIFY USE & FIRE PROTECTION NOTES. 10. A-5 ADDED NOTE "O" TO GENERAL NOTES 5/A-5 11. A-7 NOTE IS ON DOOR SCHEDULE FOR DOORS 1B, 3&7 12. 10/T-2, ADDED NOTE #10 13. 10/T-2 ADDED NOTE #11 14. N/A GENERAL CONTRACTOR WILL PROVIDE 15. 3 T-2 ADDED NOTE 16. A-1 ADDED NOTE "DD" 17. 1/A-1 NOTES ARE UNDER FIRE SPRINKLERS 1/A-1 ADDED NOTE FOR SECTION 404.3.5 4/A-7 ADDED NOTES TO DOOR #1B 18. N/A GENERAL CONTRACTOR WILL PROVIDE 19. N/A 20. T-2/SP-1 NOTES ARE UNDER BENERAL NOTES AND ADA NOTES 21. A-3 ADDED NOTE "H" 22. N/A PASS NOTE TO GENERAL CONTRACTOR RECEIVED 3 COPIES OF THE ABOVE MENTIONED ITEMS. ONE LETTER REGARDING PLAN REVIEW. ROUTED TO DAN STUART. KMM
|
Routing - FIRE | 3/12/1998 | | 3/16/1998 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 3/12/1998 | | PEND |
|
|
|
Finished preliminary plan review. Faxed copy to architect and mailed hard copy. Faxed copy to Kevin Korthuis & Debby Duffield at JP Realty. Routinh plans to F.D. for review.
|
Plan resubmittals requested | | | 3/12/1998 | | PEND |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 3/12/1998 | | PEND |
|
|
|
|
Routing - PLAN CHECK | 3/9/1998 | | 3/11/1998 | | PEND |
|
|
|
Performed plan review. Copy to architect of listed of needed corrections. Routing to Fire Dept. for review.
|
Telephone call | | | 3/10/1998 | | |
|
|
|
Call to Debby Duffield, Tenant Coordinator, JP Realty. Last two plans presented for permits have been incomplete as to store front framing and connection details. Also notes on plans from JP Realty review, required as a condition of presenting plans for review to Boise City, specify items that are not allowed per original mall design in 1988. Several of the noncomplying items are shown on the plan, such as hanging storefront from roof structure, attaching directly to roof deck and wrong minimum plate sizes on columns at storefront grill. I called to ask why plans that are incorrect have not been rejected back to architect before being presented to city for plan review as I will have to reject them anyway. This adds to the processing time as the plans sit until I can get to them and then when I do they are incorrect and I have to wait for new submittals. If an obvious deficiencies was handled at the mall review then I could posible process with correction list that could be handled in the field by the inspector at time of frame inspection. Debby had asked Kevin Korthuis, Dir. of Tenant Coordination, to listen in on conversation, Hopefully this will help plan processing for future tenant submittals.
|
Routing - PLAN CHECK | 2/24/1998 | | 3/9/1998 | | |
|
|
|
Picked up plan to start review.
|
Routing - PUBLIC WORKS | 2/23/1998 | | 2/23/1998 | | PASS |
|
|
|
|
Plan routing begun/TENANTS | | | 2/20/1998 | | |
|
|
|
Route to PUBLIC WORKS, PLAN CHECK and FIRE.
|
Application received | | | 2/18/1998 | | |
|
|
|
|