INSP - Final | 10/5/1998 | 10/5/1998 | 10/6/1998 | P | PASS |
Jim Storey
|
|
|
10/05/98 301 - GREG ###-#### AT THE TONE 19203 FNL -OK FINAL
|
INSP - Wall cover | 9/8/1998 | 9/8/1998 | 9/9/1998 | P | PASS |
Jim Storey
|
|
|
09/09/98 301 - ray ###-#### at tone dial 19203 wall cover insp GWB -OK SHEETROCK NAILING
|
INSP - Framing/Rough-in | 9/4/1998 | 9/4/1998 | 9/4/1998 | P | PASS |
Jim Storey
|
|
|
09/04/98 301 - ###-####-19203 FRAM-OK FRAMING
|
90 day tracking............. | | 2/19/1998 | 5/20/1998 | | PEND |
|
|
|
|
Issue PAID IN FULL permit | | | 4/6/1998 | | |
|
|
|
|
Print Occupancy Form | | | 3/27/1998 | | |
|
|
|
|
Telephone call | | | 3/27/1998 | | |
|
|
|
called left message permit ready
|
Inspection Record Card- Bld | | | 3/27/1998 | | |
|
|
|
|
Routing - PLAN CHECK | 3/25/1998 | | 3/26/1998 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/26/1998 | | PASS |
|
|
|
|
Plan assigned to (ADS) | 2/23/1998 | | 3/26/1998 | | PASS |
|
|
|
|
Routing - FIRE | 3/20/1998 | | 3/25/1998 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 2/25/1998 | | 3/20/1998 | | PASS |
|
|
|
The mezzanine in the warehouse has been reclassified as a second story to permit area to be added. A fire rated door assembly is to be added across the deck in line with the west wall of 1121 W Amity to be treated as an area seperation wall for the dock. The 1121 building is still at maximum area. This approval is in some degree an alternate design method.
|
Plan resubmittals received | | | 3/19/1998 | | |
|
|
|
RECEIVED 2 COPIES OF REVISED CANOPY PLANS SHEETS A-1, A-2. ROUTED TO ARLAN. KMM
|
Telephone call | | | 3/11/1998 | | FAIL |
|
|
|
Spoke to Cornel Larson. Informed him that the present mezzanine will be reclassified as a second story to allow for the addition of the canopy. We still need lateral load calculations and seperation from between 1121 & 1125 West Amity buildings. ads
|
Meeting | | | 3/8/1998 | | FAIL |
|
|
|
Meet with Cornel Larson, Jim Kissler, Marlene, Floyd & Arlan. Discussed possible solutions to the building being over allowable area & and a seperation in the canopy between the two buildings.
|
Telephone call | | | 3/2/1998 | | FAIL |
|
|
|
Arlan phoned Cornel Larson. Mr. Larson was informed that the addition to 1121 Amity is not permitted because that building is at the maximum allowable area now. A copy of the lateral load resisting design calculations was also requested.
|
Routing - PLAN CHECK | 2/19/1998 | | 3/2/1998 | | FAIL |
|
|
|
Called achitects. This construction puts the building over the allowable area. meeting set for 8 march to discuss.
|
Routing - PLANNING | 2/24/1998 | | 2/25/1998 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 2/20/1998 | | 2/24/1998 | | PASS |
|
|
|
|
Plan assigned to (JCM) | 2/20/1998 | | 2/23/1998 | | PASS |
John Menard
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 2/20/1998 | | PASS |
|
|
|
|
Received Certificate of Value | | | 2/20/1998 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 2/20/1998 | | PASS |
|
|
|
CONTACTED CORNEL LARSON TO LET HIM KNOW I NEED A SITE PLAN. I WILL START ROUTING PLANS WHEN I RECEIVE SITE PLAN. RECEIVED SITE PLAN 2-20-98 PM
|
Plan assigned to (MYS) | 2/19/1998 | | 2/20/1998 | | |
Marlene Southard
|
|
|
|
Application received | | | 2/19/1998 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/19/1998 | | PEND |
|
|
|
|