Information based on query as of Friday, July 19, 2024.
Permit Information
Permit NumberBLD98-00429
StatusFinaled
Name ADECCO TAD DESIGN SERVICES
Site Address 12301 W EXPLORER DR
Project NameBRC GENESIS BLDG
Customer Number 
ePlanReviewNo
Description
To remove approximately 12 feet of non-bearing wall and construct approximately 138 feet of non-bearing wall to create six new office areas within the existing tenant space. Construction to be metal studs with 5/8", Type 'X' sheetrock on both sides from floor to above ceiling line. Alterations to the suspended ceiling system to be in compliance with UBC Standard 25-2. This building is fully fire sprinkled and modifications & additions to the system shall be approved by the Fire Department as a condition of final for occupancy. All per approved plans and attachments. PC#98-106/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
90 day tracking............. 2/23/19985/24/1998 PEND
Permanent occupancy  4/9/1998 PASS
Perm. Occ. Cert. #7207 issued 4-9-98 to Adecco Tad Design Services.
Permanent Occupancy 3/31/19983/31/1998 DONE
Details
INSP - Final3/12/19983/12/19983/12/1998PPASS
DetailsJim Sly
03/12/98 316 - Perm Occ
INSP - Final3/6/19983/9/19983/9/1998AFAIL
DetailsJim Sly
03/08/98 316 - NR ###-####
INSP - Final3/5/19983/6/19983/6/1998PNR
DetailsJim Sly
03/06/98 316 - NR GENISIS BLDG--CHARLIE ###-####
INSP-Final Inspection3/6/19983/6/19983/6/1998PPASS
DetailsJoe Tawney
03/06/98 406 - CHARLIE ###-#### REINSP OK FOR CERT OF COMPLETION
INSP-Final Inspection3/5/19983/5/19983/5/1998PFAIL
DetailsJoe Tawney
03/05/98 406 - charlie ###-#### FINAL FAIL FIRE EXT INSP DOORS AND HDWRE
INSP-Final Inspection3/2/19983/4/19983/4/1998ACANC
DetailsJoe Tawney
03/04/98 406 - CHARLIE ###-#### CANCELLED BY CHARLIE TO BE RESCHEDULED
INSP - Final3/5/19983/4/19983/4/1998PNR
DetailsTom Arcoraci
WILL RECALL FOR FRI
INSP - Final3/2/19983/4/19983/4/1998PCANC
DetailsJim Sly
03/04/98 316 - Done by Tom A.
INSP-Sprinkler Rough-in/Hydro3/2/19983/3/19983/3/1998AFAIL
DetailsJoe Tawney
03/03/98 406 - CHARLIE ###-#### SPKLR ROUGH IN TWO HEADS OVERSPACED OFF WALL
INSP - Framing/Rough-in2/26/19982/27/19982/27/1998APASS
DetailsJim Sly
02/27/98 316 - CHARLIE ###-####
INSP - Framing/Rough-in2/25/19982/26/19982/26/1998AFAIL
DetailsJim Sly
02/25/98 316 - C/N....Need appr plans....
Plan assigned to (DRS)2/23/1998 2/25/1998 PASS
DetailsDan Stuart
Inspection Record Card- Bld  2/25/1998
Print Occupancy Form  2/25/1998
Telephone call  2/25/1998 PASS
judy 8:00 ###-####
Issue PAID IN FULL permit  2/25/1998
Routing - PLAN CHECK2/24/1998 2/25/1998 PASS
PLANS/APPL TAKEN TO FRONT DESK  2/25/1998 PASS
Telephone call  2/24/1998
Call to Cindy Williams of ADDECO TAD DESIGN SERVICES to verify that they occupied the entire second floor area.
Telephone call  2/24/1998
Call to habitec offices to request a key and site plan not submitted with the plans and that the application was incomplete. Gordon McDonald is not tin the office but they will get the information together and have Mr. McDonald contact me.
Plan Reviewer's activity  2/24/1998
Reviewed file for past projects at this address. This is a two story structure on both ends and one story in the middle. The submitted plans did not indicate a site or key plan and I called Habitec Architects office and requested the two plans. I called Cindy Williams of Addecco Tad Design Offices to verify that they occupied the entire floor area to verify access to both exits from all portion of the floor. Original tenant lease plans for the building indicated a central exit corridor serving several tenant spaces for the required exits. Submitted plans do not indicate a central corridor any longer and our records do not indicate when this was changed.
Print Pending Permit.LaserJet4  2/24/1998 PASS
Plan assigned to (MYS)2/23/1998 2/23/1998
DetailsMarlene Southard
Recd Pcfee & Taken To Pln CK  2/23/1998 PEND
Application received  2/23/1998