Information based on query as of Monday, July 1, 2024.
Permit Information
Permit NumberBLD98-00430
StatusFinaled
Name MCDONALD'S CORPORATION
Site Address 3201 AIRPORT WAY
Project NameAIRPORT
Customer Number 
ePlanReviewNo
Description
(MCDONALD'S) Fire sprinklers used for building area increase. To alter a 527 square foot space (385 sq. ft. existing plus a 142 sq. ft. addition) to be used as a "fast food" outlet. The space is located on the 2nd floor near the security check point where "Concourse A" and "Concourse B" converge. The addition will be constructed on an existing roof system that will be modified to support the new loads. Work includes additional floor joists, cementitious spray on fire proofing, a concrete slab, exterior 1-hr noncombustible walls, 1-hr noncombustible roof, 1-hr noncombustible interior walls, millwork, and suspended ceilings all per approved drawings, engineering, and plan review conditions on file. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. PC-105-98 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes8/5/1998 12/7/1998
INSP - Final7/10/19987/10/19987/10/1998 PASS
DetailsJim Storey
/ / 301 - FNL -OK FINAL
Permanent Occupancy 7/10/19987/10/1998 DONE
Details
Permanent occupancy  7/10/1998 PASS
Perm. Occ. Cert. #7304 issued 7-10-98 to McDonald's Restuarant.
INSP - Final7/7/19987/7/19987/8/1998PFAIL
DetailsJim Storey
07/07/98 301 - Scheduled by Hello!. Contact phone is [8901188]. CORR-CORREC-CALL FOR REINSP WHEN COMPLETED exit light not working.
90 day tracking............. 2/23/19985/24/1998 PEND
INSP - Final5/13/19985/14/19985/14/1998PPART
DetailsJim Storey
05/14/98 301 - TCO -TEMP C OF O ISSUE pending others as well as c/n for
Temporary occupancy  5/14/1998 PASS
Temp. Occ. Cert. #3619 issued 5-14-98 to McDonald's.
INSP - Final5/12/19985/13/19985/13/1998PFAIL
DetailsJim Storey
05/13/98 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED recieved submi
INSP-Final Inspection5/13/19985/13/19985/13/1998P
DetailsRick Jackson
contractor requested 1:00 ansul system and alarm test
INSP - Final5/8/19985/11/19985/11/1998ANR
DetailsJim Storey
05/11/98 301 - cancled on fri by contractor greg
INSP-Conference5/7/19985/7/19985/7/1998PPART
DetailsRick Jackson
discussed alarm appliance locations, ansul system test, extinguisher requirements and exiting issues.
INSP - Wall cover5/4/19985/4/19985/4/1998 PASS
DetailsJim Storey
05/04/98 301 - FRAM-OK FRAMING
INSP - Wall cover4/30/19984/30/19984/30/1998ACANC
DetailsJim Storey
Scheduled by Hello!. Contact phone is [8901188]. cancelled by greg/reschedule
INSP - Wall cover4/28/19984/29/19984/29/1998PFAIL
DetailsJim Storey
04/29/98 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED architect of r
INSP - Framing/Rough-in4/20/19984/21/19984/21/1998APART
DetailsJim Storey
04/21/98 301 - exterior wall and gyp ok/ two layer roof ceilling assembl
INSP - Foundation4/14/19984/15/19984/15/1998APART
DetailsJim Storey
04/15/98 301 - pending special insp report appears ok
INSP - Foundation4/13/19984/14/19984/14/1998PCANC
DetailsJim Storey
04/14/98 301 - CANCLED BY CONTRACTOR RESCH. FOR AM 04 15 98 Scheduled by
INSP - Framing/Rough-in4/7/19984/8/19984/8/1998PPART
DetailsJim Storey
04/08/98 301 - pre-job conf w/arch.ok!. Contact phone is [8901188].
Issue PAID IN FULL permit  4/7/1998
Plan assigned to (CJW)2/27/1998 4/6/1998 PASS
DetailsCarl Westfall
04/06/98 13:15:38 CJW - this action updated by action script from <<>> in Case No. BLD98-0430
Routing - PLAN CHECK3/12/1998 4/6/1998 PASS
PLANS/APPL TAKEN TO FRONT DESK  4/6/1998 PASS
testing condition printout  4/6/1998
Print permit w/o conditions  4/6/1998
Print Occupancy Form  4/6/1998
Inspection Record Card- Bld  4/6/1998
Telephone call  4/6/1998
called brad with bumgarth const/gave him break-down on permit
Plan Reviewer's activity  4/6/1998 PASS
Drawings approved, with conditions as noted and attached to the approved drawings, after resubmittal review.
Plan resubmittals received  4/3/1998
Additional resubmittal received.
Plan Reviewer's activity  3/31/1998
UBC plan review started March 30, 1998 and finished April 1, 1998. A response from the architect is required.
Routing - FIRE3/23/1998 3/27/1998 PASS
Routing - PLUMBING3/10/1998 3/11/1998 PASS
Routing - PUBLIC WORKS3/9/1998 3/10/1998 PASS
Routing Off Site - C.D.H3/2/1998 3/6/1998 PASS
CALLED LARRY KALOUSEK TO TAKE PLANS TO CDH 3/2/98 DAR . ###-#### (CSHQA)
Plan routing begun/TENANTS  2/27/1998
Route to CENTRAL DISTRICT HEALTH, PUBLIC WORKS, PLUMBING, PLAN CHECK and FIRE.
Plan assigned to (MYS)2/23/1998 2/27/1998
DetailsMarlene Southard
Plan resubmittals received  2/23/1998
Resubmittal incomplete.
Application received  2/23/1998
Recd Pcfee & Taken To Pln CK  2/23/1998 PEND
INSP - Wall cover4/24/19984/27/19984/22/1979PPART
DetailsJim Storey
04/27/98 301 - FRAM-OK FRAMING