Permit Information
Permit NumberBLD98-00458
StatusExpired
Name MIKE GALLEGOS
Site Address 5123 W EMERALD ST
Project Name 
Customer Number 
ePlanReviewNo
Description
MIKE GLALLEGOS * TO CONSTRUCT A NEW 1000 sf STORAGE GARAGE BEHIND EXISTING RESIDENCE. Construction is CMU wall with wood truss roof. No repair work using welding or open flame is to be done in this building. PC#111-98 ads
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  7/8/2004  
PubWorks Occupancy Approval12/13/200212/13/200212/13/2002 DONE
Drainage project found complete 12/13/02. No inspection requests since 11/26/01. G.Fitts
Reopen Permit (ISS)  5/17/2002 DONE
GEORGE SLANE HAD ME RE-OPEN THIS BLD PERMIT 5-17-02///DLD
BLD-Foundation11/13/200111/14/200111/14/2001APASS
DetailsTom Arcoraci
###-#### ok for grout pour 11/14/2001 10:22:40 AM
CHANGE STATUS TO (ISS)  8/17/2001 DONE
DOC - Permit Expired1/24/20011/24/20011/24/2001PPASS
DetailsRuss Owen
Added by Inspector: 407 On 1/24/2001 1:42:33 PM
BLD-Footing8/10/20008/11/20008/11/2000PPASS
DetailsTom Arcoraci
###-####
BLD-Footing7/27/20007/31/20007/31/2000AFAIL
DetailsCarl Dependahl
###-#### ; n/r, recall. 7/31/2000 8:18:41 AM
Permit EXTENDED  2/2/2000 DONE
(F) Reprint permit  8/18/1999
Issue PAID IN FULL permit  8/16/1999
CHANGE STATUS TO (R)  4/21/1999
Telephone call  2/26/1999 PASS
talked to ken reed at ###-#### -said monica gave him an extension until may-letter on file
Permit EXTENDED  12/9/1998 PASS
as per letter to dave hattrick okay for one time extension.mps
Telephone call  12/8/1998 PEND
called talked to ken will fax over letter and send copy of extension needed. Stated that the two partners are not getting along and they still need achd and can't get money or signature for achd until other partner gets back from argentina.
Inspection Record Card- Bld  10/12/1998
Print Occupancy Form  10/12/1998
Telephone call  10/12/1998 PEND
called talked to ken gave dollar amount told him he could not pick up permit until he shows proof of achd being paid.mps
PLANS/APPL TAKEN TO FRONT DESK  10/9/1998 PASS
Routing - PLANNING10/6/1998 10/9/1998 PASS
approved per DRH98-0049.
Routing - PUBLIC WORKS10/5/1998 10/6/1998 PASS
sent to Brian M
Routing - PLAN CHECK9/25/1998 10/5/1998 PASS
Routing - PUBLIC WORKS9/24/1998 9/25/1998 FAIL
Routing - FIRE9/9/1998 9/14/1998 PASS
conditions limiting use of structure are attached
Plan resubmittals received  9/10/1998
RECEIVED RESUBMITTALS AND TAKEN TO BRIAN M.
Routing - PLANNING8/7/1998 8/7/1998 FAIL
plans do not comply with DRH98-0049 conditions of approval.
Routing - PUBLIC WORKS7/28/1998 8/3/1998 FAIL
REQUIRES DRAINAGE PLAN.
Routing - PLAN CHECK4/2/1998 7/28/1998 PEND
pending approval from fire, plannning and public work. Passed building code review.
Plan resubmittals received  7/17/1998
New design for smaller building recieved
90 day tracking............. 2/25/19985/26/1998
Routing - FIRE3/27/1998 4/1/1998 FAIL
PACKAGE #1
Routing - PUBLIC WORKS3/25/1998 3/27/1998 FAIL
PACKAGE #1 NO LEGAL DESCRIPTION.
Routing - PLANNING3/27/1998 3/27/1998 FAIL
Design review has not been approved. DR application will be heard at the April 8, 1998 meeting.
Plan resubmittals received  3/24/1998
RECEIVED 2 COPIES OF REVISED SHEETS 2 OF 3 AND 3 OF 3. ROUTED TO ARLAN. KMM
Plan resubmittals requested  3/19/1998 FAIL
see phone call on this date
Telephone call  3/19/1998 FAIL
Called Ken Reed. I ask for design details on the connection between the roof diaphragm and the walls.
Plans ACCEPTED BY PLAN CHECK  3/18/1998 PEND
AM ROUTING ACHD PACKAGE. CONTACTED KEN REED TO PICK UP PLANS AND TAKE TO ACHD. I STILL HAVE NOT RECEIVED PACKAGE #1. TALKED TO KEN ABOUT IT AND HE HIS GOING TO SUBMIT A NEW PACKAGE #1. KEN STATED THAT HE DID APPLY FOR HIS DR#. 3-18-98 RECEIVED PACKAGE #1 MINUS GRADING AND DRAINAGE. I WILL ROUTE TO ARLAN FIRST. KEN STATED HE WILL HAVE GRADING TO ME BY NEXT WEEK. UNTIL THEN I CANNOT ROUTE TO PW OR P&Z (DUE TO DESIGN REVIEW IN PROGRESS).KMM 3-26-98 LEFT A MESSAGE WITH KEN TO LET HIM KNOW THAT I HAVE NOT RECEIVED GRADING AND DRAINAGE OR CALCS. AS OF THIS DATE. KMM
Plan assigned to (JCM)2/26/1998 2/27/1998 PASS
DetailsJohn Menard
Plan routing begun/NEW & ADDTN2/26/1998 2/26/1998
Plan assigned to (MYS)2/25/1998 2/26/1998
DetailsMarlene Southard
Recd Pcfee & Taken To Pln CK  2/25/1998
Routing - PLAN CHECK2/25/1998 2/25/1998
Plans ACCEPTED BY PLAN CHECK  2/25/1998 HOLD
RECEIVED 3 SITE PLANS (SHEET 1 OF 3) AND 2 (SHEETS 2 OF 3 AND 3 OF 3) PERMIT APPLICATION. CALLED KEN REED TO INFORM HIM OF OUR PACKAGE SUBMITTAL AND FAX INFORMATION TO HIM. ALSO REQUESTED THAT HE TALK TO ROGER JONES ABOUT A DR. MR. REED STATED HE WAS TOLD THAT HE NEEDED A STAFF LEVEL DR. I TOLD HIM HE NEEDS TO GET THAT BEFORE ROUTING CAN PROCEED. 3-3-98 RECEIVED ACHD SET. 1 COPY OF H OCCUPANCY QUEST. 2 COPIES OF STRUCTURAL CALCULATIONS, DETAILS AND STICKY BACKED STRUCTURAL NOTES. ALL CALCS. AND NOTES FROM BRIGGS. MR. REED TOOK PLANS WITH HIM TO SIGN.
Application received  2/25/1998
Received Certificate of Value  2/25/1998 PASS
Plan assigned to (ADS)2/27/1998 1/9/1998 PASS
Details
Routing Off Site - A.C.H.D3/18/1998  
CONTACTED KEN REED AT ###-#### TO TAKE PLANS OUT TO ACHD
Routing Off Site - A.C.H.D8/17/1999  
project file number DRH98-0049 reciept number 5872 amount paid $1520.00