Case Summary (BLD) | | | 5/28/2003 | | |
|
|
|
|
Case Summary (BLD) | | | 5/28/2003 | | |
|
|
|
|
Case Summary (BLD) | | | 5/28/2003 | | DONE |
|
|
|
|
Permanent occupancy | | | 10/20/1998 | | PASS |
|
|
|
Perm. Occ. Cert. #7464 issued 10-20-98 to American Direct Credit Children's Day Care Center.
|
Permanent Occupancy | | 10/19/1998 | 10/19/1998 | | DONE |
|
|
|
|
INSP - Final | 10/15/1998 | 10/15/1998 | 10/15/1998 | | PASS |
|
|
|
/ / 338 - MADE OK CARD NOT ON SITE OK FOR OFFICE TO SIGN THE FINAL COL
|
INSP-Conference | 10/14/1998 | 10/15/1998 | 10/15/1998 | A | PASS |
Joe Tawney
|
|
|
10/15/98 406 - MIKE-RUSSELL CORP-###-#### PER JOE CONF AT 10:00 FOR FN REINSP OK FOR PERM OCC
|
INSP - Final | 9/28/1998 | 9/28/1998 | 9/28/1998 | P | PART |
|
|
|
09/28/98 338 - MADE OK FOR TEMP OCC
|
INSP - Final | 9/25/1998 | 9/25/1998 | 9/28/1998 | P | PART |
|
|
|
09/28/98 338 - MADE OK FOR TEMP OCC
|
Code Occupancy Approval | | | 9/28/1998 | | PASS |
|
|
|
(Has a small portion of planter @ north boundary that willbe completed on 385 N. Kimball proj. (DRH97-0233)
|
Temporary occupancy | | | 9/28/1998 | | PASS |
|
|
|
Temp. Occ. Cert. #3700 issued 9-28-98 to A.D.C. Day Care.
|
INSP-Final Inspection | 9/18/1998 | 9/18/1998 | 9/18/1998 | P | PART |
Joe Tawney
|
|
|
09/18/98 406 - MIKE ###-#### FINAL OK FOR TEMP OCC PKING LOT FIRE EXT CONTROL VLV NFPA 72 SPKLR OB
|
PubWorks Occupancy Approval | | | 9/16/1998 | | DONE |
|
|
|
Drainage project complete 09/16/98. R.Cummings
|
INSP-Sprinkler Rough-in/Hydro | 9/14/1998 | 9/14/1998 | 9/14/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON UNDERGROUND AND ABOVE GROUND HYDRO TESTS
|
INSP-Supply line flush | 9/11/1998 | 9/14/1998 | 9/14/1998 | A | PART |
Joe Tawney
|
|
|
09/14/98 406 - SAM ###-#### 8 AM OK ON SUPPLY LINE FLUSH
|
INSP - Framing/Rough-in | 7/27/1998 | 7/27/1998 | 7/27/1998 | P | PART |
|
|
|
07/27/98 338 - OK TO INSULATE ONLY NEED FIRE STOPS AT PLATE PENETRATIONS
|
INSP-Sprinkler Rough-in/Hydro | 7/24/1998 | 7/24/1998 | 7/24/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON ROUGH IN OF DRY SYSTEM EXC SOFFIT AREA IN 4 CORNERS
|
INSP - Framing/Rough-in | 7/6/1998 | 7/7/1998 | 7/7/1998 | A | NR |
|
|
|
07/07/98 338 - truss eng and lateral supports not complete, interior she
|
INSP - Foundation | 6/4/1998 | 6/4/1998 | 6/4/1998 | P | PART |
|
|
|
06/04/98 338 - made ok to pour r-bar is placed
|
INSP - Foundation | 6/2/1998 | 6/2/1998 | 6/2/1998 | P | PART |
|
|
|
06/02/98 338 - made ok to pour with ele ground ok,d r-bar is placed form
|
90 day tracking............. | | 3/2/1998 | 5/31/1998 | | PEND |
|
|
|
|
(F) Reprint permit | | | 5/4/1998 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/1/1998 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/27/1998 | | PASS |
|
|
|
|
Print Occupancy Form | | | 4/27/1998 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/27/1998 | | |
|
|
|
|
Telephone call | | | 4/27/1998 | | |
|
|
|
called left message on voice mail for johnathon
|
Routing Off Site - C.D.H | 4/23/1998 | | 4/24/1998 | | PASS |
|
|
|
JOHNATHON SEEL TO TAKE PLANS TO C.D.H. FOR REVIEW AND RETURN.MLO
|
Routing - PUBLIC WORKS | 4/24/1998 | | 4/24/1998 | | PASS |
|
|
|
|
Plan assigned to (MLO) | 3/4/1998 | | 4/24/1998 | | PASS |
Mike Otto
|
|
|
|
Routing - PLAN CHECK | 4/22/1998 | | 4/23/1998 | | PASS |
|
|
|
|
Routing - FIRE | 4/23/1998 | | 4/23/1998 | | PASS |
|
|
|
|
Plan resubmittals received | | | 4/23/1998 | | PASS |
|
|
|
REVISED SITE PLAN SHOWING LEGAL LOT PROVIDED. MLO.
|
Plan resubmittals received | | | 4/22/1998 | | PEND |
|
|
|
RECEIVED RESUBMITTALS AND TAKEN TO MIKE O.
|
Routing - PLANNING | 4/22/1998 | | 4/22/1998 | | PASS |
|
|
|
x-ref. DRH97-0233 & DRH98-0016
|
Routing - PLANNING | 4/17/1998 | | 4/21/1998 | | PASS |
|
|
|
x-ref DRH98-16 (and original DR)
|
CHANGE STATUS TO (P) | | | 4/15/1998 | | PEND |
|
|
|
|
Routing - FIRE | 4/13/1998 | | 4/13/1998 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 4/9/1998 | | 4/10/1998 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 4/10/1998 | | FAIL |
|
|
|
CORRECTIONS SENT TO ARCHITECT.MO
|
Plan resubmittals received | | | 4/9/1998 | | PEND |
|
|
|
RECEIVED RESUBMITTALS AND TAKEN TO MIKE OTTO.
|
Routing - FIRE | 3/23/1998 | | 3/25/1998 | | FAIL |
|
|
|
PACKAGE #1
|
Routing - PLAN CHECK | 3/17/1998 | | 3/23/1998 | | FAIL |
|
|
|
CORRECTIONS MAILED AND FAXED TO ARCHITECT. MO
|
Plan resubmittals requested | | | 3/23/1998 | | FAIL |
|
|
|
CORRECTIONS MAILED AND FAXED TO ARCHITECT. MO
|
Routing - PLUMBING | 3/16/1998 | | 3/16/1998 | | PASS |
|
|
|
PACKAGE #1
|
Routing - PUBLIC WORKS | 3/9/1998 | | 3/16/1998 | | FAIL |
|
|
|
CONTACTED CRICKET LANGWORTHY TO LET HER KNOW THAT I NEED 3 ADDITIONAL CIVIL SETS. SITE PLAN DOES NOT COMPLY WITH RECORDED PLAT ORAND/OR LEGAL DESCRIPTION. PER JIM RICH. 3//16/98 DAR
|
Routing Off Site - STRUCTURAL | 3/4/1998 | | 3/13/1998 | | PASS |
|
|
|
PACKAGE #3 REQUIRES SOILS REPORT. CONTACTED CRICKET LANGWORTHY OF THIS NEED. 3-4-98 RECEIVED SOILS REPORT. ROUTED TO ATWOOD HINZMAN AND JONES PER PDQ RECEIVED COMMENTS BACK FROM ATWOOD HINZMAN JONES 3/12/98 COMMENTS TO BE HANDLED BY PLAN CHECKER. MO
|
Plan resubmittals requested | | | 3/13/1998 | | PEND |
|
|
|
COMMENTS FROM STRUCTURAL ENGINEER FAXED AND MAILED TO CRICKET LANGWORTHY AT BRS 3-13-98. MO
|
Routing - PLANNING | 3/4/1998 | | 3/9/1998 | | FAIL |
|
|
|
PACKAGE #1 x-ref cup97-107 & cup98-6(cu mod): failed because site and landscape plans don't match approved plans (i.e. no walkway on west side of entrance). Phoned and talked to Cricket L.; she will get us revised site and landscape and for now we are routing back to bldg. division. (ph. ###-####)
|
Routing Off Site - A.C.H.D | 3/4/1998 | | 3/6/1998 | | PASS |
|
|
|
PACKAGE #2 CONTACTED CRICKET LANGWORTHY AT ###-#### TO TAKE PLANS OUT TO ACHD.
|
Plans ACCEPTED BY PLAN CHECK | | | 3/4/1998 | | PEND |
|
|
|
RECEIVED 2 COPIES OF PACKAGE 1 WITHOUT THE THREE ADDITIONAL SETS OF CIVIL DRAWINGS. I CONTACTED CRICKET LANGWORTHY OF THIS NEED. 2 COPIES OF STAMPED AND SIGNED PACKAGE #2 1 COPY OF STAMPED AND SIGNED PACKAGE #3 MINUS SOILS REPORT. I CONTACTED CRICKET LANGWORTHY OF THIS NEED. 2 COPIES OF STRUCTURAL CALCS. NO PROJECT MANUALS RECEIVED. I WILL ROUTE PACKAGE #2 TO ACHD. I WILL WAIT FOR SOILS REPORT FOR PACKAGE #3. I WILL ROUTE PACKAGE #1 TO P & Z. 3-4-98 RECEIVED SOILS REPORT. WILL ROUTE PACKAGE #3
|
Plan routing begun/NEW & ADDTN | | | 3/4/1998 | | PASS |
|
|
|
|
Plan assigned to (MYS) | 3/2/1998 | | 3/4/1998 | | |
Marlene Southard
|
|
|
|
Received Certificate of Value | | | 3/4/1998 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/2/1998 | | PEND |
|
|
|
|
Application received | | | 3/2/1998 | | |
|
|
|
|