Case Summary (BLD) | | | 5/27/2003 | | |
|
|
|
|
BLD-Final | 10/14/1999 | 10/14/1999 | 10/14/1999 | A | PASS |
|
|
|
l/c issued #16390
|
BLD-Final | 10/14/1999 | 10/14/1999 | 10/14/1999 | A | PASS |
|
|
|
shell completed all othe rsignoffs complete signed the perm coland issued l/c # 16390
|
CHANGE STATUS TO (D) | | | 10/14/1999 | | DONE |
|
|
|
Letter of Compliance issued this date.
|
INSP - Concrete | 6/30/1999 | 6/30/1999 | 6/30/1999 | | PART |
|
|
|
R-BAR IN TILT UP PANELS MADE OK #'S 7, 8, 9, 10, 11, 12 UPDATED 06/22/99
|
CHANGE STATUS TO (I) | | | 1/6/1999 | | |
|
|
|
|
(F) Reprint permit | | | 12/18/1998 | | |
|
|
|
|
Fee Review-notes | 12/18/1998 | | 12/18/1998 | | DONE |
|
|
|
ADDITIONAL VALUE 78,265.00 LH values went down on bld97-3653,98-0141,0142 didn't fee due. lh
|
CHANGE STATUS TO (F) | | | 12/18/1998 | | |
|
|
|
ADDITIONAL VALUE
|
INSP-Supply line flush | 9/14/1998 | 9/14/1998 | 9/14/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON SUPPLY LINE FLUSH
|
INSP - Foundation | 8/28/1998 | 8/28/1998 | 8/28/1998 | | CANC |
|
|
|
08/28/98 338 - wrong insp requested canc by the cntr.
|
INSP - Foundation | 8/28/1998 | 8/28/1998 | 8/28/1998 | P | CANC |
|
|
|
cancelled by the contractor, called for the wrong permit #
|
INSP-Sprinkler Rough-in/Hydro | 7/15/1998 | 7/15/1998 | 7/15/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON HYDRO TEST
|
INSP - Concrete | 7/10/1998 | 7/10/1998 | 7/10/1998 | | PART |
|
|
|
R-BAR PLACED MADE OK TO POUR WITH SP INSP APPROVALS
|
INSP-Supply line flush | 7/8/1998 | 7/8/1998 | 7/8/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON SUPPLY LINE FLUSH
|
INSP-Sprinkler Rough-in/Hydro | 7/8/1998 | 7/8/1998 | 7/8/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - 0K ON ROUGH IN MAIN BRACING FINISH INSTALLATION OF HEADS
|
INSP - Foundation | 6/26/1998 | 6/29/1998 | 6/29/1998 | P | PASS |
|
|
|
06/29/98 338 - Scheduled by Hello!. Contact phone is [8701081]. OK TO
|
INSP - Concrete | 6/29/1998 | 6/28/1998 | 6/29/1998 | | PART |
|
|
|
south end footings made ok r-bar placed ok to pour with sp insp approval. sp insp approved r-bar for tilt up paneld W2, W,6, 13,16, 18, 19, 5, 3, 14, 24, 27, 21 OK TO POUR FOR 06/30/99
|
INSP - Concrete | 6/24/1998 | 6/24/1998 | 6/24/1998 | | PASS |
|
|
|
made ok with sp insp approval r-bar placed north and west footings
|
INSP - Concrete | 6/24/1998 | 6/24/1998 | 6/24/1998 | | PASS |
|
|
|
r-bar placed made ok by sp insp
|
INSP - Concrete | 6/16/1998 | 6/16/1998 | 6/16/1998 | | PASS |
|
|
|
made ok with sp insp approval
|
INSP - Foundation | 6/15/1998 | 6/16/1998 | 6/16/1998 | A | CANC |
|
|
|
06/16/98 338 - Scheduled by Hello!. Contact phone is [8701081].
|
90 day tracking............. | | 3/5/1998 | 6/3/1998 | | PEND |
|
|
|
|
(F) Reprint permit | | | 4/27/1998 | | |
|
|
|
|
Plan assigned to (M_P) | 3/10/1998 | | 4/24/1998 | | PASS |
Mike Phillips
|
|
|
04/24/98 08:46:50 DAR - this action updated by action script from <<>> in Case No. BLD98-0556
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/24/1998 | | PASS |
|
|
|
|
Print Occupancy Form | | | 4/24/1998 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/24/1998 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/24/1998 | | |
|
|
|
|
Plan Reviewer's activity | | | 4/23/1998 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 4/23/1998 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 4/20/1998 | | 4/21/1998 | | PASS |
|
|
|
|
Routing Off Site - A.C.H.D | 3/6/1998 | | 4/17/1998 | | PASS |
|
|
|
PACKAGE #2 CONTACTED CORNEL LARSON AT ###-#### TO TAKE PLANS OUT TO ACHD. FEES NOT PAID 4/17/98. ACHD FEES PAID 4/24/98.
|
Routing - FIRE | 3/27/1998 | | 4/2/1998 | | FAIL |
|
|
|
PACKAGE #1
|
Plan Reviewer's activity | | | 3/27/1998 | | PEND |
|
|
|
WAITING FOR FIRE DEPARTMENT, PUBLIC WORKS AND ACHD APPROVALS AND VERIFICATION LETTER FROM STRUCTURAL ENGINEER.
|
Print Pending Permit.LaserJet4 | | | 3/27/1998 | | PEND |
|
|
|
WAITING FOR FIRE DEPARTMENT APPROVAL.
|
Routing - PLUMBING | 3/23/1998 | | 3/24/1998 | | PASS |
|
|
|
PACKAGE #1
|
Routing - PLANNING | 3/13/1998 | | 3/23/1998 | | PASS |
|
|
|
PACKAGE #1 x-ref. DRH98-0006
|
Routing Off Site - STRUCTURAL | 3/6/1998 | | 3/20/1998 | | PASS |
|
|
|
PACKAGE #3 GAVE PLANS TO ARLAN TO EVALUATE FOR OUTSIDE ENG. CONTACTED PDQ TO TAKE PLANS OUT TO ATWOOD HINZMAN AND JONES 3-20-98 RECEIVED ONE COPY OF LETTER REGUARDING STRUCTURAL PLAN CHECK REVIEW COMMENTS FOR KIMBALL PLAZA 2 FROM ATWOOD HINZMAN AND JONES, DATED MARCH 20 1998. THEY HAVE RETAINED THE PLANS AND CALCULATIONS. ROUTED TO MIKE P. KMM PLAN REVIEWER WILL DO FOLLOW-UP PLAN REVIEW. 03/27/98
|
Routing - PUBLIC WORKS | 3/6/1998 | | 3/12/1998 | | FAIL |
|
|
|
PACKAGE # 1 SITE PLAN DOESN'T COMPLY WITH RECORDED PLAT AND/OR LEGAL DESCRIPTION. SUBDIVISION NOT RECORDED.
|
Plan assigned to (JCM) | 3/6/1998 | | 3/10/1998 | | PASS |
John Menard
|
|
|
|
Plan resubmittals received | | | 3/10/1998 | | |
|
|
|
RECEIVED REVISED SITE PLAN ON THE TWO EXISTING LOTS (LOT9 AND 10) IN LIEU OF THE NEW LOTS PROPOSED FOR THE SUBDIVISION. ROUTED TO BRIAN MURPHY. ROUTED TWO COPIES
|
Plan assigned to (MYS) | 3/5/1998 | | 3/6/1998 | | |
Marlene Southard
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 3/6/1998 | | PASS |
|
|
|
|
Received Certificate of Value | | | 3/6/1998 | | PASS |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 3/6/1998 | | PASS |
|
|
|
|
Application received | | | 3/5/1998 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/5/1998 | | |
|
|
|
|
Routing - PLAN CHECK | 3/24/1998 | | | | |
|
|
|
|
Routing - PLAN CHECK | 4/20/1998 | | | | |
|
|
|
PACKAGE #3
|