Permanent occupancy | | | 10/23/1998 | | PASS |
|
|
|
Perm. Occ. Cert. #7468 issued 10-23-98 to Central District Health Dept. (int. ofc. space)
|
INSP - Final | 10/19/1998 | 10/19/1998 | 10/19/1998 | P | PASS |
|
|
|
10/19/98 338 - signed perm col
|
Permanent Occupancy | | 10/19/1998 | 10/19/1998 | | DONE |
|
|
|
|
Code Occupancy Approval | | | 10/9/1998 | | PASS |
|
|
|
Meets Cond. of CUP98-0037
|
INSP - Final | 9/29/1998 | 10/1/1998 | 10/1/1998 | A | FAIL |
Tom Arcoraci
|
|
|
10/01/98 408 - Scheduled by Hello!. Contact phone is [9398850].
|
INSP - Final | 9/18/1998 | 9/18/1998 | 9/18/1998 | | FAIL |
Joe Tawney
|
|
|
/ / 406 - REINSP FAIL FIRE EXT STILL NOT TAGGED
|
INSP-Final Inspection | 9/4/1998 | 9/4/1998 | 9/4/1998 | P | FAIL |
Joe Tawney
|
|
|
09/04/98 406 - ###-#### please call REINSP FAIL ALARM SYSTEM CALCS
|
INSP-Final Inspection | 8/14/1998 | 8/17/1998 | 8/17/1998 | A | FAIL |
Joe Tawney
|
|
|
08/16/98 406 - mark guho ###-#### fire and life safety FINAL FAIL ALARM SUBM FIRE EXT STROBES SPKLR SYST ANNUAL INSP
|
INSP - Final | 8/7/1998 | 8/7/1998 | 8/7/1998 | | FAIL |
|
|
|
08/07/98 338 - OTH-OTHER AGENCIES NOT APPROVED
|
INSP - Final | 8/6/1998 | 8/7/1998 | 8/7/1998 | A | NR |
|
|
|
other agencies not approvedt phone is [9398850].
|
INSP-Sprinkler Rough-in/Hydro | 7/14/1998 | 7/15/1998 | 7/15/1998 | A | PART |
Joe Tawney
|
|
|
07/15/98 406 - ###-#### OK ON ROUGH IN EXC POSSIBLY SIDE WALL HEADS IN CORRIDOR CEILING NOT FINI
|
90 day tracking............. | | 3/9/1998 | 6/7/1998 | | PEND |
|
|
|
|
INSP - Framing/Rough-in | 6/4/1998 | 6/5/1998 | 6/5/1998 | A | PART |
|
|
|
06/05/98 338 - Scheduled by Hello!. Contact phone is [9398850]. made ok to cover int walls and insulate the ceiling/roof area
|
INSP - Framing/Rough-in | 5/29/1998 | 6/1/1998 | 6/1/1998 | A | NR |
|
|
|
06/01/98 338 - outof time
|
INSP - Concrete | 5/13/1998 | 5/14/1998 | 5/14/1998 | P | PASS |
|
|
|
05/14/98 338 - made ok to pour with sp insp approval
|
INSP - Foundation | 5/5/1998 | 5/6/1998 | 5/6/1998 | P | PASS |
|
|
|
05/06/98 338 - made ok sp insp made ok to pour
|
INSP - Foundation | 5/1/1998 | 5/4/1998 | 5/4/1998 | P | NR |
|
|
|
need special insp letter before concrete hits the ground
|
Issue PAID IN FULL permit | | | 4/29/1998 | | |
|
|
|
|
Plan assigned to (ADS) | 3/10/1998 | | 4/21/1998 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 4/15/1998 | | 4/21/1998 | | PASS |
|
|
|
pending ACHD fee payment / received receipt 21apr98
|
Inspection Record Card- Bld | | | 4/21/1998 | | |
|
|
|
|
Print Occupancy Form | | | 4/21/1998 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/21/1998 | | PASS |
|
|
|
|
Telephone call | | | 4/21/1998 | | |
|
|
|
left message on voice mail
|
Routing - PLANNING | 4/15/1998 | | 4/15/1998 | | PASS |
|
|
|
x-ref. DRH98-0052
|
Routing - PLANNING | 4/13/1998 | | 4/14/1998 | | PASS |
|
|
|
complies with CUP98-37 per M. Hall; x-ref. DRH98-52.
|
Routing - PUBLIC WORKS | 4/9/1998 | | 4/13/1998 | | PASS |
|
|
|
OK
|
Routing - PLAN CHECK | 3/31/1998 | | 4/2/1998 | | PEND |
|
|
|
resubmittals approved, pending planning & public works approval
|
Routing - FIRE | 3/24/1998 | | 3/30/1998 | | PASS |
|
|
|
PACKAGE #1
|
Routing Off Site - A.C.H.D | 3/18/1998 | | 3/24/1998 | | PASS |
|
|
|
PACKAGE #2 CONTACTED DAVE THOMA AT ###-#### TO TAKE PLANS OUT TO ACHD. DAVE STATED HE WILL BRING IN AN ACHD SET ON 3-12-98 CALLED AND LEFT A MESSAGE WITH DAVE ABOUT NOT RECEIVING ACHD SETS AS OF 3-17-98 3-18-98 RECEIVED ACHD SET 3/24/98 PASSED AT ACHD, ACHD FEES NOT PAID DAR 4/21/97 ACHD FEES PAID RECEIPT #98-1258
|
Routing - PLAN CHECK | 3/18/1998 | | 3/24/1998 | | FAIL |
|
|
|
PACKAGE #1. Faxed copy of intial plan review report to David Thomas at Hummel.
|
Plan resubmittals requested | | | 3/24/1998 | | FAIL |
|
|
|
Faxed copy of initial plan review report to David Thomas at Hummel.
|
Routing - PLANNING | 3/13/1998 | | 3/17/1998 | | FAIL |
|
|
|
PACKAGE #1 SPOKE TO DAVE THOMAS ABOUT GETTING A DR FROM P&Z. NEED TO SUBMIT A STAFF LEVEL CU AND DR. CALLED APPLICANT. Applications were submitted and approved. Planning signed off on building plans 4-15-98 (see further routing reviews). TKW
|
Routing - PUBLIC WORKS | 3/11/1998 | | 3/13/1998 | | FAIL |
|
|
|
PACKAGE #1 REQUIRES DRAINAGE PLAN. PER BM
|
Routing - PLAN CHECK | 3/9/1998 | | 3/11/1998 | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 3/11/1998 | | 3/11/1998 | | PASS |
|
|
|
ARLAN STATED THAT WE WILL DO ENGINEERING review IN HOUSE.
|
Plans ACCEPTED BY PLAN CHECK | | | 3/11/1998 | | HOLD |
|
|
|
RECEIVED 2 COPIES OF PACKAGE #1. 2 COPIES OF PROJECT MANUAL. 1 COPY OF LETTER STATING THIS PROJECT IS UNDER THE 1997 UBC 1 COPY OF STRUCT. CALCS. CONTACTED DAVE THOMAS REQUESTING AN ACHD SET OF PLANS. A SOILS REPORT, AND TO CONTACT P & Z FOR DESIGN REVIEW OR WHAT EVER THEY ARE GOING TO REQUEST. BRIAN MURPHY AND DAVE HAVE BEEN COMM. BACK AND FORTH REGUARDING DRAINAGE PLANS. I WILL LET BRIAN TAKE CARE OF WHAT HE NEEDS FROM DAVE. KMM 1-13-98 RECEIVED SOILS REPORT 1-18-98 RECEIVED ACHD SET.
|
Received Certificate of Value | | | 3/11/1998 | | PASS |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 3/11/1998 | | PEND |
|
|
|
ROUTED PACKAGE #1. DAVE WILL BRING IN ACHD SET ON 3-12-98. ARLAN STATED NO OUTSIDE ENGINEERING. 3-17-98 LEFT MESSAGE WITH DAVE THOMAS REGUARDING THE FACT THAT I HAVE NOT RECEIVED AN ACHD SET AS OF YET.
|
Plan assigned to (MYS) | 3/9/1998 | | 3/10/1998 | | PASS |
Marlene Southard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/9/1998 | | PEND |
|
|
|
|
Application received | | | 3/9/1998 | | |
|
|
|
|