Permit Information
Permit NumberBLD98-00593
StatusFinaled
Name BILL CARR
Site Address 500 S MARDEN LN
Project NameMARDEN (WTP)
Customer Number 
ePlanReviewNo
Description
MARDEN WATER TREATMENT PLANT 1998 EXPANSION * TO CONSTRUCT A 8 MILLION GALLON PER DAY (MGD) EXPANSION OF THE EXISTING MARDEN WATER TREATMENT PLANT (WTP) INCLUDING, BUT NOT LIMITED TO, AN INLET STRUCTURE, FLOCCULATION BASINS, FILTERS, AND SOLIDS SEPARATION BASIN, AND MODIFICATION OF THE EXISTING PLANT TO INCORPORATE THE EXPANSION. CUP97-122 PC#139-98 ads
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent occupancy  9/14/1999 DONE
Perm. Occ. Cert. #7896 issued 9-14-99 to the Marden Water Treatment Plant addn.
Permanent Occupancy 9/13/19999/13/1999 DONE
Details
INSP - Final9/8/19999/9/19999/9/1999PPASS
Details
made ok for perm other aghencise made okBrian Henderson, ###-#### / ###-#### pager
Code Occupancy Approval  8/4/1999
Final approval by James W. Soden, 7/30/99.
INSP - Final7/29/19997/30/19997/30/1999AFAIL
Details
07/30/99 338 - OTHER AGENCIES NOT APPROVED
Print Occupancy Form  7/16/1999
INSP - Framing/Rough-in2/4/19992/9/19992/9/1999APART
Details
02/09/99 338 - site walk only
Fee Review-notes8/25/1998 1/28/1999
INSP - Concrete11/4/199811/5/199811/5/1998APASS
DetailsBob Archibald
ROLAND ###-####. Covered by special inspection.
INSP - Concrete9/15/19989/18/19989/18/1998APART
DetailsJim Storey
09/18/98 301 - Scheduled by Hello!. Contact phone is [4338799]. special insp on site pending report.
INSP - Concrete9/8/19989/11/19989/11/1998APART
Details
09/11/98 333 - part wall
INSP - Concrete9/3/19989/4/19989/4/1998APART
Details
09/04/98 333 - partial footing pending special insp reports
INSP - Concrete8/24/19988/25/19988/25/1998PPART
Details
08/25/98 333 - ok pend special insp reports
INSP - Foundation8/14/19988/14/19988/14/1998APART
Details
08/14/98 333 - ok pend special insp
INSP - Framing/Rough-in8/13/19988/14/19988/14/1998APART
Details
08/14/98 333 - ok pend spec insp reports
INSP - Foundation8/11/19988/12/19988/12/1998PPART
Details
08/12/98 333 - fdn ok pending special insp
INSP - Concrete8/10/19988/11/19988/11/1998APART
Details
08/11/98 333 - precon meeting
INSP - Concrete8/5/19988/6/19988/6/1998APART
Details
08/06/98 333 - ok pend special insp reports
INSP - Framing/Rough-in8/5/19988/6/19988/6/1998APART
Details
08/06/98 333 - talked about spec insp requirements
INSP - Framing/Rough-in7/27/19987/28/19987/28/1998APART
Details
07/28/98 333 - pipe casement
INSP - Framing/Rough-in7/24/19987/24/19987/24/1998PPART
DetailsJim Storey
07/24/98 301 - RE-BAR FOR PIPE ENCASEMENT JEFF ###-#### pending special inp. report
INSP - Framing/Rough-in7/21/19987/22/19987/23/1998APART
DetailsJim Storey
07/22/98 301 - RE-BAR POUR TOMMORROW 10AM JEFF ###-#### already placed pending special insp. report.
INSP - Foundation7/16/19987/17/19987/17/1998APART
Details
07/17/98 333 - stem at sumps ok
INSP - Foundation7/17/19987/17/19987/17/1998 PART
Details
07/17/98 333 - part ok
INSP - Foundation7/14/19987/15/19987/15/1998APART
Details
07/15/98 333 - sumps ok
INSP-Conference6/23/19986/24/19986/24/1998APART
DetailsWes Worcester
06/24/98 342 - conf/8:30 /per west
INSP - Foundation6/23/19986/23/19986/23/1998PPART
DetailsWes Worcester
06/23/98 342 - Conference JIm Cox ###-#### Roland ###-#### he is the Sup WATER
Issue PAID IN FULL permit  6/9/1998
90 day tracking............. 3/10/19986/8/1998 PEND
Telephone call  6/5/1998
TALKED TO BILL--HE SAID GEN CONT WILL BE IN BY 18TH..IF NOT HE WILL BE IN AND GET IT.
Telephone call  5/27/1998
LEFT MESSAGE ON BILL CARR VOICE MAIL--ASK HIM TO CALL ME BACK.
Telephone call  5/26/1998 MESS
TALKED TO BILL CARR WILL PICK UP IN 2 OR 3 WEEKS.
Print Occupancy Form  4/23/1998
Inspection Record Card- Bld  4/23/1998
Telephone call  4/23/1998 MESS
LEFT MESSAGE WITH WILLIS CARR THAT PLANS ARE READY
Plan resubmittals received  4/22/1998 PEND
RRECEIVED RESUBMITTALS CAROLLO ENGINEERS, PASSED SAME ON TO ARLAN SMITH.
PLANS/APPL TAKEN TO FRONT DESK  4/22/1998 PASS
Plan assigned to (ADS)3/11/1998 4/22/1998 PASS
Details
Routing - PLAN CHECK4/7/1998 4/22/1998 PASS
see addendums 1 & 2 to the contract.
Plan resubmittals received  4/13/1998 PEND
RECEIVED RESUBMITTALS FROM CAROLLO ENGINEERS PASSED TO ARLAN SMITH 4/14/98 DAR
Routing - FIRE3/30/1998 4/7/1998 PASS
PACKAGE #1
Routing - PLANNING3/26/1998 3/30/1998 PASS
PACKAGE #1 Reviewed and approved plans per CU97-122.
Routing - PLAN CHECK3/20/1998 3/25/1998 FAIL
correction list faxed to Bill Carr.
Plan resubmittals requested  3/25/1998 FAIL
Faxed initial plan review report to Bill Carr at United Water. This included 16 structural comments from our reviewing engineer.
Routing Off Site - STRUCTURAL3/11/1998 3/23/1998
CONTACTED PDQ TO TAKE PLANS OUT TO ATWOOD HINZMAN AND JONES. 3-23-98 RECEIVED ONE COPY OF STRUCTURAL PLAN CHECK RERVIES COMMENTS. ATWOOD HINZMAN, AND JONES HAVE RETAINED ONE COMPLETE SET OF PLANS AND CALCULATIONS. ROUTED TO ARLAN AND PUT ONE COPY IN FILE.
Routing - PUBLIC WORKS3/18/1998 3/20/1998 PASS
Routing Off Site - A.C.H.D3/11/1998 3/18/1998 PASS
PACKAGE #2 CONTACTED BILL CARR AT ###-#### TO TAKE PLANS OUT TO ACHD NO IMPACT FEES DUE PER BARBARA KEMP 3/18/98 OF ACHD
Routing - PLUMBING3/13/1998 3/18/1998 PASS
PACKAGE #1
Routing - PUBLIC WORKS3/11/1998 3/13/1998 FAIL
PACKAGE #1 ALONG WITH THIS PACKAGE ARE 5 SETS OF DRAINAGE AND GRADING PLANS WITH CALCS. JON WILLIAMS WILL MEET WITH UNITED WATER CONCERNING SEWER CONNECTION FEES.
Plan assigned to (MYS)3/10/1998 3/11/1998
DetailsMarlene Southard
Routing - PLAN CHECK3/10/1998 3/11/1998
Plans ACCEPTED BY PLAN CHECK  3/11/1998 PASS
RECEIVED - PACKAGE #1 PLUS HAZARDOUS MATERIAL MANAGEMENT PLAN AND LEGAL DESCRIPTION PACKAGE #2 WITH CALCS. PACKAGE #3 WITH CALCS, SOILS REPORT AND SPECS.
Plan routing begun/NEW & ADDTN  3/11/1998
Received Certificate of Value  3/11/1998 PASS
Application received  3/10/1998
Recd Pcfee & Taken To Pln CK  3/10/1998 PEND