Case Summary (BLD) | | | 12/8/2009 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 12/8/2009 | | PASS |
Bob Archibald
|
|
|
|
Case Summary (BLD) | | | 12/8/2009 | | DONE |
|
|
|
|
INSP-Final Inspection | 11/16/1998 | 11/17/1998 | 11/17/1998 | P | PASS |
Rick Jackson
|
|
|
TONY ###-#### FN INSP AFTER 2 IF POSSIBLE? occ approved
|
INSP - Final | 11/12/1998 | 11/16/1998 | 11/16/1998 | P | PASS |
|
|
|
11/16/98 333 - FNL -OK FINAL
|
INSP - Final | 10/12/1998 | 10/14/1998 | 10/14/1998 | P | FAIL |
|
|
|
10/14/98 333 - cn placed9
|
INSP-Final Inspection | 10/14/1998 | 10/14/1998 | 10/14/1998 | P | FAIL |
Rick Jackson
|
|
|
door hardware, exit signs, glazing in corridor
|
90 day tracking............. | | 3/10/1998 | 6/8/1998 | | PEND |
|
|
|
|
INSP - Framing/Rough-in | 5/29/1998 | 6/1/1998 | 6/1/1998 | A | PASS |
|
|
|
06/01/98 333 - FRAM-OK FRAMING
|
INSP - Framing/Rough-in | 5/28/1998 | 5/29/1998 | 5/29/1998 | A | FAIL |
|
|
|
05/29/98 333 - cn placed
|
INSP - Framing/Rough-in | 5/20/1998 | 5/20/1998 | 5/20/1998 | P | FAIL |
|
|
|
05/20/98 333 - not per plan
|
INSP - Framing/Rough-in | 5/19/1998 | 5/19/1998 | 5/19/1998 | P | PART |
|
|
|
05/19/98 333 - occupancy walls in progress
|
INSP - Framing/Rough-in | 5/7/1998 | 5/8/1998 | 5/8/1998 | A | PART |
|
|
|
05/08/98 333 - conference on occupancy wall
|
INSP-Conference | 5/5/1998 | 5/5/1998 | 5/5/1998 | P | PASS |
|
|
|
05/05/98 333 - TALKED ABOUT OCCUPANCY SEPARATION WALLS
|
INSP - Framing/Rough-in | 4/21/1998 | 4/24/1998 | 4/24/1998 | A | PART |
|
|
|
04/24/98 333 - met with tony
|
INSP - Framing/Rough-in | 4/17/1998 | 4/20/1998 | 4/20/1998 | A | NR |
|
|
|
04/20/98 333 - no call
|
Print Occupancy Form | | | 4/17/1998 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/17/1998 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 4/17/1998 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/17/1998 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 4/17/1998 | | |
|
|
|
|
Routing - PLAN CHECK | 4/16/1998 | | 4/17/1998 | | PASS |
|
|
|
Plans received from Fire Dept. Review in P.M. Signed plans and started to process for issuance of a permit.
|
Plan assigned to (DRS) | 3/12/1998 | | 4/17/1998 | | PASS |
Dan Stuart
|
|
|
04/17/98 07:20:35 DRS - this action updated by action script from <<>> in Case No. BLD98-0594
|
Routing - FIRE | 4/8/1998 | | 4/16/1998 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 4/7/1998 | | 4/8/1998 | | PEND |
|
|
|
Plans being routed to fire dept for review. comments faxed and mailed to architect for his file.
|
Plan assigned to (DRS) | 4/7/1998 | | 4/8/1998 | | |
Dan Stuart
|
|
|
Plans picked up and reviewed with comments faxed and mailed to architect while plans being routed to fire dept. for review.
|
Plan Reviewer's activity | | | 4/8/1998 | | |
|
|
|
Have met with Thomas Ensley, architect, and Tony Chung, owner in several different meetings to review existing conditions and to come up with a plan to create suites and separate exits to the exterior from each area and through on adjoining room, to provide proper occupancy group separation, upgrade a rated corridor to serve the residrndial dorm area and upgrade opening and penetration protection as required. A plan was presented on March 10, 1998 showing the remodel work to be done as a part of this permit. As this facility runs strictly on donations this project could take a bit of time to complete. It was suggested that the owner & architect talk to institutes such as the hospitals & Micron or HP to see if they may have rated doors & frame for opening protection tha t are extras and maybe donated to their effort.
|
Print Pending Permit.LaserJet4 | | | 4/8/1998 | | PEND |
|
|
|
|
Routing - PLAN CHECK | 3/11/1998 | | 4/7/1998 | | PEND |
|
|
|
Plans picked up by reviewer to begin processing.
|
Plan assigned to (MYS) | 3/10/1998 | | 3/12/1998 | | |
Marlene Southard
|
|
|
|
Plan routing begun/TENANTS | | | 3/12/1998 | | |
|
|
|
This plan to be reviewed by PLAN CHECK and FIRE.
|
Recd Pcfee & Taken To Pln CK | | | 3/10/1998 | | PEND |
|
|
|
|
Application received | | | 3/10/1998 | | |
|
|
|
|