Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD98-00600
StatusFinaled
Name UNIVERSITY PLAZA LLC
Site Address 960 S BROADWAY AVE Unit: 101
Project NameUNIVERSITY PLAZA
Customer Number 
ePlanReviewNo
Description
*UNIVERSITY PLAZA* LOBBY & COMMON AREA UPGRADES, WORK TO INCLUDE, NEW SMOKE GUARD DOORS 2nd THRU 5th floors, NEW LOBBY AND COMMON AREA FINISHES, NEW TOILET ROOM 1st FLOOR ONLY (ACCESSIBLE UNISEX) AND NEW ENTRY. WORK TO BE PERFORMED ON ALL 5 FLOORS. NOTE: THIS BUILIDNG IS FULLY FIRE SPRINKLERED. ANY ALTERATION OR MODIFICATION TO THE FIRE SPRINKLER SYSTEM SHALL BE PER NFPA #13 AS REGULATED BY THE FIRE DEPARTMENT. (PC#136-98) RMH
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes7/21/1998 2/25/1999 OK
INSP - Final2/10/19992/11/19992/11/1999PPASS
DetailsJim Storey
02/11/99 301 - FNL -OK FINAL sa per approved plans and agreement on file
INSP-Conference2/11/19992/11/19992/11/1999 PASS
DetailsRick Jackson
/ / 409 - REVIEWED WITH STRUCTURAL AND MECH INSPECTOR THE NEWLY FOUND
Letter of compliance  2/11/1999 PASS
Letter of Compliance #14979 issued 2-11-99.
INSP - Final2/10/19992/10/19992/10/1999PFAIL
DetailsJim Storey
02/10/99 301 - n/r
INSP - Final2/10/19992/9/19992/10/1999 PASS
DetailsRick Jackson
/ / 409 - OCC APPROVED
INSP-Final Inspection1/28/19991/29/19991/29/1999AFAIL
DetailsRick Jackson
01/29/99 409 - JAMES CUPPS- ###-#### FIRE FN INSP fire pump running and controller don't send signal off-site
INSP - Framing/Rough-in8/13/19988/14/19988/14/1998APASS
DetailsJim Storey
08/14/98 301 - ###-#### jan FRAM-OK FRAMING
INSP-Final Inspection7/30/19987/31/19987/31/1998PFAIL
DetailsRick Jackson
MIKE ###-#### HE WOULD LIKE YOU TO CALL HIM pump monitoring, tampers, exit signs, heat detectors in shaft
INSP - Framing/Rough-in7/9/19987/10/19987/10/1998AFAIL
DetailsJim Storey
07/10/98 301 - CEILING TILE COVER UP/ ###-#### UNIT 101 CORR-CORREC-CALL FOR REINSP WHEN COMPLETED fire stopping and 4th floor m grid wires needed.
INSP - Final6/29/19986/30/19986/30/1998APART
Details
06/30/98 333 - covered befor I got thereappears ok
INSP - Framing/Rough-in6/18/19986/19/19986/19/1998APART
Details
06/19/98 333 - ok to cover mech room at 1st floor elevator and 3rd floor
Plan resubmittals received  6/17/1998 PEND
RECEIVED RESUBMITTALS FROM CSHQA, FORWARDED SAME TO RON HILL AT HIS REQUEST.
90 day tracking............. 3/10/19986/8/1998 PEND
INSP-Sprinkler Rough-in/Hydro6/3/19986/3/19986/3/1998PPART
DetailsRick Jackson
jan ###-#### voice pager/job trailer he will be there okay to cover main lobby sprinkler system only
INSP - Framing/Rough-in6/3/19986/3/19986/2/1998PFAIL
DetailsJim Storey
06/03/98 301 - OTH-OTHER AGENCIES NOT APPROVED
INSP - Concrete5/13/19985/14/19985/14/1998APASS
DetailsWes Worcester
05/14/98 342 - concrete slab/larry ###-####
INSP - Framing/Rough-in5/11/19985/11/19985/11/1998 PART
DetailsWes Worcester
/ / 342 -
INSP - Framing/Rough-in5/11/19985/11/19985/11/1998 PASS
DetailsWes Worcester
/ / 342 -
INSP - Framing/Rough-in5/11/19985/11/19985/11/1998PFAIL
DetailsJim Storey
05/11/98 301 - LARR TO WESY/###-#### - AFTER LUNCH PLEASE. TRANS
Issue PAID IN FULL permit  5/1/1998
Issue PAID IN FULL permit  5/1/1998
Telephone call  4/28/1998
called john maulin left message on voice mail
Print Occupancy Form  4/28/1998
Inspection Record Card- Bld  4/28/1998
Print Pending Permit.LaserJet4  4/27/1998
PLANS/APPL TAKEN TO FRONT DESK  4/27/1998 PASS
Recieved plans back from Public Works with mdifications to the fees / Ready to issue.
Plan Reviewer's activity  4/27/1998 PASS
REVIEWED CORRECTED PLANS AND NEW UL LISTINGS FOR WALLS AND FLOOR SYSTEM, NEED TO ROUTE BACK TO PUBLIC WORKS FOR NEW EVALUATION, FOUR PROPOSED RESTROOMS HAVE BEEN DELEATED FROM PROJECT.
Plan assigned to (R_H)3/13/1998 4/27/1998 PASS
Details
PER MARLENE 04/27/98 15:22:34 R_H - this action updated by action script from <<>> in Case No. BLD98-0600
Plan Reviewer's activity  4/23/1998 FAIL
I have recieved two resubmitted fire assemblys, both do not match details on plans, I have spoken with John Maulin and Mike Brown the engineer on the project he said he would get back with me, plans are still on hold.
Plan resubmittals received  4/22/1998 PEND
RECEIVED RESUBS PASSED SAME TO RON HILL.
Plan resubmittals received  4/17/1998 PEND
RESUBS RECEIVED FROM CSHQA. PASSED ON TO RON HILL. DAR
Routing - FIRE3/24/1998 3/31/1998 PASS
Plan Reviewer's activity  3/24/1998 FAIL
STARTED PLAN REVIEW 3-19-98 / SENT PLAN REVIEW, CORRECTIONS THAT ARE REQUIRED OUT TO ARCHITECT 10-24-98. WILL ROUTE TO FIRE DEPARTMENT.
Routing - PUBLIC WORKS3/13/1998 3/18/1998 PASS
ROUTE TO PC WHEN DONE IN PW
Routing - PLAN CHECK3/10/1998 3/13/1998
Plan assigned to (MYS)3/10/1998 3/13/1998
DetailsMarlene Southard
Plan routing begun/TENANTS  3/13/1998 PASS
Recd Pcfee & Taken To Pln CK  3/10/1998 PEND
Application received  3/10/1998
Received Certificate of Value  3/10/1998
Plans ACCEPTED BY PLAN CHECK  3/10/1998 PASS
Routing - PLAN CHECK3/31/1998