Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD98-00619
StatusFinaled
Name GARTH JENSEN
Site Address 2150 W BOISE AVE
Project NameLDS ADDITION
Customer Number 
ePlanReviewNo
Description
CHURCH OF JESUS CHRIST OF LATTER DAY SAINTS * ADDITION TO EXISTING CHURCH BUILDING AND REMODELING OF EXISTING CHURCH BUILDING AND SITE MODIFICATIONS. PC153-98 CU#-84-91 MODIFICATION AA-81-97 ALL PER APPROVED PLANS. ads
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Code Occupancy Approval  4/13/1999 PASS
Temporary Occupancy requested by Rick ###-#### pager PAINTING OF TRIM AND SOME PARKING SPACES NOT MARKED, BID SENT IN FOR $588, THIS IS OK SO WITH THE REQUIRED 10 0/0 TOTAL BONDING AMOUNT IS $646.00. WILL SIGN TEMP WHEN BOND POSTED, GAVE INSTRUCTIONS TO RICK ON SITE. BOND POSTED WITH CATHY 2-5-99, TEMP OCCUPANCY SIGNED OFF. FINAL INSPECTION MADE 4-13-99, TRIM PAINTED AND PARKING MARKED, FINAL OCCUPANCY SIGNED OFF AND RELEASE OF BOND.
Permanent occupancy  2/18/1999 PASS
Perm. Occ. Cert. #7639 issued 2-18-99 to the Church of Jesus Christ of Latter Day Saints (addn.)
INSP - Final2/12/19992/12/19992/12/1999 PASS
DetailsJim Storey
02/12/99 301 - FNL -OK FINAL
Permanent Occupancy 2/12/19992/12/1999 DONE
Details
INSP - Final2/8/19992/8/19992/9/1999PPART
DetailsJim Storey
02/08/99 301 - temp occ ok
INSP-Final Inspection2/5/19992/5/19992/5/1999PPASS
DetailsRick Jackson
RICK ###-#### occ approved
CHANGE STATUS TO (F)  1/28/1999
CHANGE STATUS TO (I)  1/28/1999 FEES
SEE BLD98-1691 OVERPAYMENT THERE WOULD HAVE BEEN FEES DUE ON THIS PERMIT LH
(F) Reprint permit  1/28/1999
Fee Review-notes10/13/1998 1/28/1999
Fee Review-notes8/6/1998 1/28/1999
ADDTIONAL VALUE FROM SUBS
INSP-Conference1/6/19991/6/19991/6/1999PPART
DetailsRick Jackson
verified damper operation with electrician; reviewed plans for final
INSP - Framing/Rough-in11/25/199811/27/199811/27/1998AFAIL
DetailsJim Storey
11/27/98 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP - Framing/Rough-in10/26/199810/27/199810/27/1998APASS
DetailsJim Storey
10/27/98 301 - rick ###-#### or ###-#### roof sheeting insp RF -OK ROOF NAILING
INSP - Framing/Rough-in10/23/199810/23/199810/23/1998PNR
DetailsJim Storey
10/23/98 301 - rick ###-#### nailing on sheeting
Inspection Record Card- Bld  9/17/1998
INSP - Concrete8/28/19988/28/19988/28/1998 PART
DetailsJim Storey
08/28/98 301 - stem wall/###-#### pouring 2:00 special inspector COVERED BY SPECIAL INSP PENDING REPORT.
INSP - Foundation8/25/19988/26/19988/26/1998APASS
DetailsJim Storey
08/26/98 301 - RICK ###-#### FOOTING INSPECTION MID MORNING IF POSSIBLE. LUNCH TIME NOT EARLY MORNING. FTG -OK FOOTING rebar ok pending special insp.
INSP - Framing/Rough-in8/7/19988/7/19988/7/1998 PART
DetailsJim Storey
08/07/98 301 - placed w/special insp. pending report.
INSP - Framing/Rough-in8/6/19988/7/19988/6/1998APART
DetailsJim Storey
foundation placed w/special insp. pending report.
INSP - Foundation8/4/19988/4/19988/4/1998PPASS
DetailsJim Storey
08/04/98 301 - RICK ###-#### ###-#### FRMS-OK FORMS
Print Occupancy Form  8/4/1998
90 day tracking............. 3/11/19986/9/1998 PEND
Telephone call  5/27/1998
SECRETARY SAID SHE WILL GIVE MESSAGE TO CLYDE WIPPER AND HAVE HIM CALL ME BACK..GARTH IS NO LONGER THERE
Issue PAID IN FULL permit  5/27/1998
Telephone call  5/22/1998 MESS
LEFT MESSAGE THAT PLANS ARE READY WITH MR. WARD HE WILL CALL RON THURBER AND LET HIM KNOW
Telephone call  5/1/1998 MESS
LEFT MESSAGE THAT PLANS ARE READY
Plan resubmittals received  4/14/1998 PEND
RECEIVED RESUBMITTALS 4/13/98 FROM RON THURBER.
Print Occupancy Form  4/14/1998
Inspection Record Card- Bld  4/14/1998
Telephone call  4/14/1998
CALLED RON THURBER AND GAVE HIM $ AMOUNT
PLANS/APPL TAKEN TO FRONT DESK  4/14/1998 PASS
Plan assigned to (ADS)3/18/1998 4/14/1998 PASS
Details
Routing - PLAN CHECK4/2/1998 4/14/1998 PASS
Routing - PUBLIC WORKS4/2/1998 4/2/1998 PASS
Routing - FIRE3/26/1998 4/2/1998 PASS
PACKAGE 31
Routing - PLAN CHECK3/25/1998 3/26/1998 FAIL
see action A012 this date.
Plan resubmittals requested  3/26/1998 FAIL
Faxed copy of initial plan review report to Bill Waite, architect.
Routing - PUBLIC WORKS3/24/1998 3/25/1998 FAIL
REQUIRES DRAINAGE PLAN PER BRIAN MURPHY. 3//25/98.
Routing - PLUMBING3/20/1998 3/24/1998 PASS
PACKAGE #1
Routing Off Site - A.C.H.D3/17/1998 3/24/1998 PASS
PACKAGE #2 CONTACTED BILL WAITE TO TAKE PLANS OUT TO ACHD ACHD FEES PAID 3/23/98 RECEIPT #98-1102
Routing - PLANNING3/18/1998 3/20/1998 PASS
PACKAGE #1 Approved per AA-81-97 - Modificaction of CU-84-91
Plan assigned to (JCM)3/17/1998 3/18/1998 PASS
DetailsJohn Menard
Routing - PUBLIC WORKS3/17/1998 3/18/1998 FAIL
PACKAGE #1 MAY REQUIRE DRAINAGE PLAN PER BM 3/18/98
Plan routing begun/NEW & ADDTN  3/17/1998 PASS
Routing Off Site - STRUCTURAL3/17/1998 3/17/1998
JOHN STATED WE WILL DO ENGINEERING.
Plan assigned to (MYS)3/11/1998 3/17/1998
DetailsMarlene Southard
Routing - PLAN CHECK3/11/1998 3/17/1998
Received Certificate of Value  3/17/1998 PASS
Plans ACCEPTED BY PLAN CHECK  3/16/1998 PASS
RECEIVED PACKAGE 1. TWO FULL COPIES OF PLANS PLUS THREE EXTRA COPIES OF CIVIL SHEETS FOR PW 2. TWO COPIES OF ACHD 3. ONE COPY OF PACKAGE #3. JOHN STATED WE WILL DO ENG. FOR BOTH NO SPEC. BOOKS
Plans ACCEPTED BY PLAN CHECK  3/12/1998 HOLD
CONTACTED BILL WAITE AT ###-#### TO REQUEST HE SUBMIT EACH BUILDING SEPARATELY USING THE NEW AND ADDITION PACKAGE SET. I WILL WAIT UNTIL I RECEIVE SEPARATE PLANS BEFOREWORKING UP PERMITS.
Recd Pcfee & Taken To Pln CK  3/11/1998 PEND
Application received  3/11/1998