BLD-Final | 11/15/1999 | 11/16/1999 | 11/16/1999 | A | PASS |
Wes Worcester
|
|
|
grey ###-#### C/C issued.
|
BLD-Final | 11/12/1999 | 11/15/1999 | 11/15/1999 | A | FAIL |
Wes Worcester
|
|
|
grey ###-#### Unable to verify with Public Works.
|
BLD-Final | 11/10/1999 | 11/12/1999 | 11/12/1999 | A | FAIL |
|
|
|
gray ###-#### fn occ --access frnt door ebh C/N issued.
|
BLD-Grading Inspection | 10/21/1999 | 10/21/1999 | 10/21/1999 | | PASS |
Rita DeYoung
|
|
|
|
BLD-Final | 10/21/1999 | 10/21/1999 | 10/21/1999 | P | FAIL |
Wes Worcester
|
|
|
###-#### access is EBH\terry records approved grading today its in the Computer Need other finals
|
BLD-Final | 10/4/1999 | 10/5/1999 | 10/5/1999 | A | FAIL |
Wes Worcester
|
|
|
Clarence ###-#### final for LC need fire, address #'s , etc
|
FIRE-Final Inspection | 10/5/1999 | 10/5/1999 | 10/5/1999 | P | PASS |
Joe Tawney
|
|
|
reinspect ok for perm occ
|
Inspection Record Card- Bld | | | 9/17/1999 | | DONE |
|
|
|
|
INSP - Final | 8/9/1999 | 8/9/1999 | 8/9/1999 | | FAIL |
Joe Tawney
|
|
|
/ / 406 - REINSP FAIL RECALC S/W HEAD FOR 16X16 COV
|
INSP - Final | 3/22/1999 | 3/23/1999 | 3/23/1999 | A | PART |
Joe Tawney
|
|
|
03/23/99 406 - OK ON ABOVE GRND HYDRO TEST , PART OK ON SPKLR R. I.
|
SUPER- Supervisor's review | 1/15/1999 | 1/15/1999 | 1/15/1999 | | PEND |
|
|
|
Conference w/Joe Tawney on fire protection requirements on this dwelling. Instructed him to issue a CN to contractor requesting compliance.
|
INSP-Conference | 1/15/1999 | 1/15/1999 | 1/15/1999 | | PART |
Joe Tawney
|
|
|
/ / 406 - POSTED C/N ADV HOUSE REQUIRES SPKLR SYSTEM. NO ONE ON SITE
|
Print Occupancy Form | | | 1/15/1999 | | |
|
|
|
|
CHANGE STATUS TO (I) | | | 1/15/1999 | | |
|
|
|
|
INSP - Energy code compliance | 12/3/1998 | 12/4/1998 | 12/4/1998 | | PASS |
Wes Worcester
|
|
|
/ / 342 -
|
INSP - Framing/Rough-in | 12/2/1998 | 12/3/1998 | 12/3/1998 | A | PASS |
Wes Worcester
|
|
|
12/03/98 342 - fee was paid he wants to meet with you\###-####
|
INSP - Framing/Rough-in | 11/30/1998 | 12/1/1998 | 12/1/1998 | A | FAIL |
Wes Worcester
|
|
|
12/01/98 342 - GREG...###-#### 10:45 am apt reinspection fee due
|
CHANGE STATUS TO (F) | | | 12/1/1998 | | |
|
|
|
|
(F) Reprint permit | | | 12/1/1998 | | |
|
|
|
|
INSP - Framing/Rough-in | 11/19/1998 | 11/23/1998 | 11/23/1998 | A | FAIL |
Wes Worcester
|
|
|
11/23/98 342 - truss engineering, top plate splices, point ld transfers
|
INSP - Framing/Rough-in | 10/26/1998 | 10/27/1998 | 10/28/1998 | A | PART |
Wes Worcester
|
|
|
10/27/98 342 - DEBBIE ###-#### SHEAR WALL REINSPECT
|
INSP - Framing/Rough-in | 10/23/1998 | 10/26/1998 | 10/27/1998 | | FAIL |
Jim Storey
|
|
|
10/26/98 301 - trans to wes
|
INSP - Framing/Rough-in | 10/23/1998 | 10/23/1998 | 10/23/1998 | | FAIL |
Wes Worcester
|
|
|
/ / 342 -
|
INSP - Framing/Rough-in | 10/22/1998 | 10/23/1998 | 10/23/1998 | A | NR |
Wes Worcester
|
|
|
10/23/98 342 - plans not on site, will recall mon w/plans there
|
INSP - Foundation | 7/27/1998 | 7/27/1998 | 7/27/1998 | P | PART |
Carl Dependahl
|
|
|
foundation wall/ ###-#### pahds onsite ok to install, looks ok.
|
INSP - Foundation | 7/16/1998 | 7/16/1998 | 7/16/1998 | P | |
Carl Dependahl
|
|
|
foundation darren ###-####
|
Issue PAID IN FULL permit | | | 6/29/1998 | | |
|
|
|
|
Telephone call | | | 6/12/1998 | | MESS |
|
|
|
left message for the second time.
|
Telephone call | | | 5/28/1998 | | MESS |
|
|
|
left message ###-####
|
Print Occupancy Form | | | 5/28/1998 | | |
|
|
|
|
Inspection Record Card- Bld | | | 5/28/1998 | | |
|
|
|
|
Plan assigned to (DJO) | 3/18/1998 | | 5/27/1998 | | PASS |
Dan Overy
|
|
|
05/27/98 15:32:03 DJO - this action updated by action script from <<>> in Case No. BLD98-0686
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/27/1998 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 5/27/1998 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 5/27/1998 | | PASS |
|
|
|
engineering and red-line plans rec. for lateral bracing. roof frame info marked on approved plans.
|
Plans ACCEPTED BY PLAN CHECK | | | 5/4/1998 | | PEND |
|
|
|
|
Plan Reviewer's activity | | | 5/4/1998 | | PEND |
|
|
|
TALKED WITH EDENBROOK. ADDITIONAL INFORMATION REQUIRED ON ROOF FRAME AT REAR OF HOUSE. STRUCTURAL ANALYSIS FOR WALL BRACING REQ.
|
Routing - PLANNING | 4/21/1998 | | 4/23/1998 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 3/18/1998 | | 4/21/1998 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 4/21/1998 | | 4/21/1998 | | PASS |
Rita DeYoung
|
|
|
Approved as Category 3. Engineer must provide compaction test results and certify that driveway will support a 70,000 pound emergency vehicle.
|
Application received | | | 3/18/1998 | | |
|
|
|
|
Routing - PLAN CHECK | 4/23/1998 | | | | PEND |
|
|
|
|