Permit Information
Permit NumberBLD98-00749
StatusFinaled
Name DOC SCHLEKEWAY
Site Address 1003 N ORCHARD ST
Project NameDR MORIARTY OFFICE
Customer Number 
ePlanReviewNo
Description
DR MORIARTY OFFICE * TO CONSTRUCT A NEW 4,178 SQ. FT. SINGLE STORY, WOOD FRAMED, TYPE V NONRATED, OFFICE BUILDING WITH ONE FUTURE TENANT SPACE. THE FUTURE TENANT SPACE IS APPROXIMATELY 1600 SQ.FT. IN AREA AND WILL BE FINISHED UNDER A SEPARATE PERMIT. DR MORIARTY OFFICE SPACE IS APPROXIMATELY 2550 SQ.FT. IN AREA AND WILL BE FINISHED UNDER THIS PERMIT. THIS PERMIT TO INCLUDE ON SITE DEVELOPEMT. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST, CABO/ANSI A117.1 AND THE 1994 EDITION OF THE UBC. MJP DR#498-30 (PC#176-98)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final9/3/19999/7/19999/7/1999APASS
DetailsCarl Dependahl
9/7 card signed (per Cathy W). jrb Final reinspect - Dr. Moriarty's bldg.
Permanent occupancy  9/7/1999 DONE
Perm. Occ. Cert. #7886 issued 9-7-99 to Dr. Moriarty.
Permanent Occupancy 9/3/19999/3/1999 DONE
Details
Print Occupancy Form  9/3/1999
INSP - Final4/15/19994/15/19994/15/1999 PART
DetailsCarl Dependahl
/ / 340 - RECD AS BUILT; HAS T/O, NEED CODE ENF OK
Receive PAYMENT IN FULL  4/12/1999
(F) Reprint permit  2/25/1999
Fee Review-notes10/14/1998 2/23/1999
INSP - Final2/10/19992/10/19992/10/1999PFAIL
DetailsCarl Dependahl
02/10/99 340 - josh ###-#### keep c/n, ok for t/o, card signed to cont.
INSP - Final2/5/19992/5/19992/5/1999PFAIL
DetailsCarl Dependahl
02/05/99 340 - call 20min before you go\\###-#### Joesh, c/n; need all o wall, submit changes to plans, etc.
INSP - Final1/29/19991/29/19991/29/1999PCANC
DetailsRuss Owen
01/29/99 407 - need plumbing first.
INSP-Final Inspection1/28/19991/29/19991/29/1999APASS
DetailsJoe Tawney
01/29/99 406 - JOSH ###-#### REINSP OK FOR PERM OCC
INSP-Final Inspection1/25/19991/26/19991/26/1999AFAIL
DetailsJoe Tawney
01/26/99 406 - josh- ###-#### fn fire FINAL FAIL DOOR HDWRE, EXIT SIGNS, DOOR SIGNS, COMPLETE RESTROOMS
INSP-Conference1/22/19991/22/19991/22/1999 PART
DetailsJoe Tawney
/ / 406 - CONF WITH JOSH 866 1510 REGARDING PROPER ADDRESS FOR BLDG EN
INSP - Framing/Rough-in11/18/199811/18/199811/18/1998 PASS
Details
11/17/98 338 - made ok to cover witnessed the fire wall fire caulking
INSP - Framing/Rough-in11/2/199811/2/199811/3/1998PPART
Details
11/03/98 338 - insulation made ok ok tocover ext walls and 1-side of int
INSP - Framing/Rough-in10/28/199810/29/199810/30/1998ANR
Details
10/29/98 338 - this is a conference c/n on trusses etc. need other agenc
Plan resubmittals received  9/14/1998
RECEIVED RESUBMITTALS AND TAKEN TO PERRY P
INSP - Foundation9/1/19989/1/19989/1/1998PPASS
Details
made ok to pour aat 3:330 sp insp on site all ok
INSP - Foundation8/31/19988/31/19988/31/1998PPART
Details
08/31/98 338 - PART MADEOK COPPER ELECTRODE IS IN PLACE APPROX 25 FT TIE
(F) Reprint permit  8/28/1998
(F) Reprint permit  8/28/1998
Issue PAID IN FULL permit  8/27/1998
Telephone call  8/27/1998
CALLED DOC PERMIT READY ###-####
Inspection Record Card- Bld  8/27/1998
Print Occupancy Form  8/27/1998
PLANS/APPL TAKEN TO FRONT DESK  8/26/1998 PASS
Plan Reviewer's activity  8/26/1998 PASS
Print Pending Permit.LaserJet4  8/26/1998 PASS
Plan assigned to (M_P)3/24/1998 8/26/1998 PASS
DetailsMike Phillips
08/26/98 08:33:48 M_P - this action updated by action script from <<>> in Case No. BLD98-0749
Routing Off Site - A.C.H.D  8/25/1998 PASS
PACKAGE #2 CONTACTED ALOYS SCHLEKEWAY AT ###-#### TO TAKE PLANS OUT TO ACHD. Plans returned from ACHD.08/25/98
90 day tracking............. 3/23/19986/21/1998 PEND
Routing - PUBLIC WORKS6/2/1998 6/3/1998 PASS
Routing Off Site - STRUCTURAL5/28/1998 5/28/1998 PASS
REVIEWED RE SUBMITTALS OF STRUCTURAL DETAILS IN OFFICE.
Plan Reviewer's activity  5/28/1998 PEND
WAITING FOR PUBLIC WORKS APPROVAL AND ACHD FEE RECEIPT AND APPROVAL LETTER.
Plan resubmittals received  5/26/1998
RECEIVED 2 COPIES OF REVISION TO FLOOR PLAN( SHEET A-1.1) ROUTED TO MIKE PHILLIPS. KMM
Plan Reviewer's activity  5/22/1998 FAIL
Need additional information from Architect and Engineer. Phoned and talked to both. They are supose to get back with me with corrected drawings.
Routing - PUBLIC WORKS5/18/1998 5/21/1998 FAIL
REQUIRES DRAINAGE PLAN REVISION. DAR
Routing - FIRE5/11/1998 5/18/1998 PASS
PACKAGE #1
Plan resubmittals received  5/18/1998
recieved resubmittals from Kolbo Associates gave to Mike Phillips
Plan Reviewer's activity  5/11/1998 FAIL
REQUESTED ADDITIONAL INFORMATION TO BE SUBMITTED FOR FOLLOW UP REVIEW. FOLLOW UP STRUCTURAL REVIEW WILL BE DONE BY PLAN REVIEWER.
Routing Off Site - STRUCTURAL4/24/1998 5/6/1998 FAIL
PACKAGE #3 GAVE TO JOHN. HE STATED SEND TO OUTSIDE ENGINEERING. CORRECTION WRITTEN, FOLLOW UP REVIEW REQUIRED AND WILL BE DONE BY PLAN REVIEWER.
Routing - PLUMBING4/29/1998 5/1/1998 PASS
PACKAGE #1
Routing - PLANNING4/28/1998 4/29/1998 FAIL
Routing - PUBLIC WORKS4/24/1998 4/28/1998 FAIL
PACAKGE #1--REQUIRES DRAINAGE PLAN REVISION 2)MUST MATCH SITE PLAN SUBMITTED 3)DIMENSIONS TO MATCH LEGAL DESCRIPTION 4)NEED TO KNOW WHEN THESE 2 PARCELS WERE CREATED.
Plan routing begun/NEW & ADDTN  4/24/1998
Plans ACCEPTED BY PLAN CHECK  4/24/1998 PASS
Plan assigned to (JCM)3/23/1998 3/24/1998 PASS
DetailsJohn Menard
Routing - PLAN CHECK3/23/1998 3/23/1998
Recd Pcfee & Taken To Pln CK  3/23/1998 PEND
Plan assigned to (MYS)3/23/1998 3/23/1998
DetailsMarlene Southard
Plans ACCEPTED BY PLAN CHECK  3/23/1998 HOLD
CONTACTED ALOYS SCHLEKEWAY TO LET HIM KNOW THAT PACKAGE #1 REQUIRES 2 COPIES OF PLUM. SHEETS AND 2 COPIES OF MECH. SHEETS. ALSO PACKAGE #1 REQUIRES 3 ADDITIONAL COPIES OF CIVIL SHEETS. PACKAGE #2 REQUIRES 2 COVER SHEETS PACKAGE #3 REQUIRES PLUMB. AND MECH. SHEETS (2 OF EACH) GAVE PACKAGE #3 TO JOHN FOR OUTSIDE ENGINEERING. EVALUATION. THIS PLAN SUBMITAL ALSO REQUIRES AN APPLICATION. KMM
Received Certificate of Value  3/23/1998 PASS
Application received  3/20/1998