Permit Information
Permit NumberBLD98-00809
StatusFinaled
Name KEVIN CLEGG
Site Address 9769 W EMERALD ST
Project NameBOISE CASCADE CORP.
Customer Number 
ePlanReviewNo
Description
BOISE CASCADE CORPORATION EMPLOYEE CREDIT UNION * TO CONSTRUCT A NEW 4515 SQ. FT., ONE STORY, WOOD FRAMED OFFICE BUILDING WITH CONCRETE VAULT, BANK SECURITY EQUIPMENT, AND (COVERED DRIVE THRU LANES AND BUILDING ENTRY. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED REQUIREMENT LIST. DR#98-0008/CU#98-0003/PC#188-98/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  5/22/2003  
Code Occupancy Approval  2/18/1999 PASS
Meets compliance with CUP98-0003/DRH98-0809
Fee Review-notes7/23/1998 1/20/1999
Permanent occupancy  1/14/1999 PASS
Perm. Occ. Cert. #7591 issued 1-14-99 to Boise Cascade Corporation Employee Credit Union.
Permanent Occupancy 1/13/19991/13/1999 DONE
Details
INSP - Final1/11/19991/11/19991/12/1999PFAIL
Details
01/11/99 338 - fail need code enforcement sign off
INSP-Final Inspection1/11/19991/11/19991/11/1999PPASS
DetailsJoe Tawney
01/11/99 406 - WAYNE ###-#### REINSP OK FOR PERM OCC
PubWorks Occupancy Approval  1/4/1999 DONE
Drainage project complete, signed permanent occupancy 01/04/99. R.Cummings
INSP-Final Inspection11/13/199811/13/199811/13/1998APART
DetailsRick Jackson
temp occ approved - awaiting main exit door hardware
INSP - Final11/13/199811/13/199811/13/1998 NR
Details
/ / 338 - 2 CONF WITH CTR TO SET UP TIME FOR PART OCC NEED FIRE BLESSI
INSP - Final11/10/199811/12/199811/13/1998PNR
Details
11/12/98 338 - not ready other aagencies not approved
INSP-Final Inspection11/10/199811/12/199811/12/1998AFAIL
DetailsRick Jackson
WAYNE ###-#### main exit hardware; exit sign; address
INSP - Framing/Rough-in8/18/19988/18/19988/19/1998PPASS
Details
08/18/98 338 - made ok to cover
INSP - Framing/Rough-in8/7/19988/7/19988/7/1998 PART
Details
08/07/98 338 - ok to start upper wall drywall need to complete draft sto
INSP - Framing/Rough-in8/6/19988/7/19988/7/1998APART
Details
made ok to insulate the ext walls only need to complete the fire blocking
INSP - Concrete7/8/19987/9/19987/9/1998APASS
Details
07/09/98 338 - FRMS-OK FORMS-REBAR
INSP - Foundation6/29/19986/30/19986/30/1998APART
Details
06/30/98 338 - vault inspection Wayne ###-#### POURED W/O INSP BY CITY S
90 day tracking............. 3/26/19986/24/1998 PEND
INSP - Foundation6/15/19986/15/19986/15/1998PPASS
Details
06/15/98 338 - madeok r-bar placed ok to pour told workers and contr abo
INSP - Foundation6/12/19986/12/19986/12/1998PPART
Details
06/12/98 338 - footing/ ###-#### made ok for footing pour r-bar placed p
(F) Reprint permit  5/28/1998
Telephone call  5/19/1998 PASS
WAYNE WILL BE IN TODAY ###-####
Issue PAID IN FULL permit  5/19/1998
Routing Off Site - A.C.H.D3/27/1998 5/18/1998 PASS
PACKAGE #2 CONTACTED TERRY BUTLER AT ###-#### TO TAKE PLANS OUT TO ACHD. received ACHD reciept fees paid (#98-1565). Confirmed verbally with Garry Inselman that project has ACHD approval. DAR
Routing - PLAN CHECK4/21/1998 5/18/1998 PASS
Plan assigned to (JCM)3/27/1998 5/18/1998 PASS
DetailsJohn Menard
Print Occupancy Form  5/18/1998
Inspection Record Card- Bld  5/18/1998
PLANS/APPL TAKEN TO FRONT DESK  5/18/1998 PASS
Plan Reviewer's activity  4/28/1998 PASS
PLAN RESUBMITTALS REVIEWED AND APPROVED AS SUBMITTED.
Plan resubmittals received  4/24/1998 PEND
RECEIVED RESUBMITTALS AND TAKEN TO JOHN M.
Routing - PUBLIC WORKS4/17/1998 4/21/1998 PASS
Routing - FIRE4/14/1998 4/17/1998 PASS
PACKAGE #1
Plan resubmittals requested  4/14/1998 PEND
MAILED THE ARCHITECT (TERRY BUTLER) A CORRECTION LIST.
Routing - PLUMBING4/3/1998 4/6/1998 PASS
PACKAGE #1
Routing - PLANNING4/2/1998 4/2/1998 PASS
x-ref. DRH98-0008
Routing - PLANNING3/30/1998 4/2/1998 PASS
x-ref: CUP98-0003 by M. Hall; CRH98-0008 by T. Wilson.
Routing - PUBLIC WORKS3/27/1998 3/30/1998 FAIL
PACKAGE #1 REQUIRES DRAINAGE PLAN REVISIONS.
Plan assigned to (MYS)3/26/1998 3/27/1998
DetailsMarlene Southard
Routing - PLAN CHECK3/26/1998 3/27/1998
Routing Off Site - STRUCTURAL3/27/1998 3/27/1998
JOHN STATED WE WILL DO ENGINEERING. KMM
Plan routing begun/NEW & ADDTN  3/27/1998 PASS
Received Certificate of Value  3/27/1998 PASS
Plans ACCEPTED BY PLAN CHECK  3/27/1998 PASS
Application received  3/26/1998
Recd Pcfee & Taken To Pln CK  3/26/1998 PEND
INSP - Final1/13/19981/13/19981/13/1998 PASS
Details
/ / 338 - made ok signed occ req card for p/z and str perm col.