Fee Review-notes | 9/9/1998 | | 12/10/1998 | | |
|
|
|
|
INSP - Final | 10/5/1998 | 10/6/1998 | 10/6/1998 | A | PASS |
Russ Owen
|
|
|
10/06/98 407 - re-insp.936 FOR FN OCC INSP
|
Permanent Occupancy | | 10/6/1998 | 10/6/1998 | | DONE |
|
|
|
|
Permanent occupancy | | | 10/6/1998 | | PASS |
|
|
|
Perm. Occ. Cert. #7446 issued 10-6-98 to the Jack in the Box.
|
Code Occupancy Approval | | | 9/24/1998 | | PASS |
|
|
|
ALL LANDSCAPE AND OTHER REQUIREMENTS IN AS REQUIRED, SIGNED OFF FOR FINAL.
|
INSP - Final | 9/21/1998 | 9/21/1998 | 9/22/1998 | P | PART |
Russ Owen
|
|
|
09/21/98 407 - left correction ok for temp. also have special inspection final report for concrete etc,all items ok,also sent this along with truss roof plans to our plan file department.
|
Temporary occupancy | | | 9/22/1998 | | PASS |
|
|
|
Temp. Occ. Cert. #3697 issued 9-21-98 to Jack In The Box.
|
INSP-Final Inspection | 9/18/1998 | 9/18/1998 | 9/18/1998 | P | PART |
Rick Jackson
|
|
|
temp occ approved - awaiting assembly permit
|
INSP - Final | 9/18/1998 | 9/18/1998 | 9/18/1998 | P | CANC |
Russ Owen
|
|
|
09/18/98 407 - taked with Mechanical inspector on phone no electrical or this time
|
Code Occupancy Approval | | | 9/18/1998 | | FAIL |
|
|
|
A BOND WAS POSTED FOR $300 TO COMPLETE THE LANDSCAPE, TEMPORARY SIGNED.
|
INSP-Final Inspection | 9/16/1998 | 9/17/1998 | 9/17/1998 | P | NR |
Rick Jackson
|
|
|
ty ###-#### too many items to complete. reviewed fire plan check comments with general contractor
|
Code Occupancy Approval | | | 9/17/1998 | | FAIL |
|
|
|
RECEIVED REQUEST FOR SIGNOFF FROM A TOM ###-####, SITE INSPECTION SHOWED SMALL AMOUNT OF LANDSCAPE NOT COMPLETE AND BUILDING NOT FULLY PAINTED YET, LOTS OF WORK IN PROGRESS AND I WAS INFORMED IT WOULD BE COMPLETE NEXT DAY, I TOLD THEM I COULD NOT SIGN TEMP UNLESS A BOND WAS IN PLACE, I ASKED FOR A SMALL $300 BOND FOR ME TO SIGN TEMP OCCUPANCY, I WAS INFORMED THAT THE WOULD CALL BACK.
|
INSP - Framing/Rough-in | 9/14/1998 | 9/14/1998 | 9/14/1998 | P | FAIL |
Russ Owen
|
|
|
09/14/98 407 - left corrections. CEILING GRID
|
INSP - Framing/Rough-in | 9/3/1998 | 9/3/1998 | 9/3/1998 | P | PASS |
Jim Storey
|
|
|
09/03/98 301 - TY ###-#### FRAM-OK FRAMING
|
INSP - Framing/Rough-in | 8/28/1998 | 8/31/1998 | 8/31/1998 | A | PART |
Russ Owen
|
|
|
08/31/98 407 - not yet complete. also stil need truss details stamped by
|
INSP - Framing/Rough-in | 8/28/1998 | 8/28/1998 | 8/28/1998 | A | PART |
Russ Owen
|
|
|
08/28/98 407 - ok to cover interior walls with rock.
|
INSP - Framing/Rough-in | 8/26/1998 | 8/26/1998 | 8/26/1998 | A | PART |
Russ Owen
|
|
|
/ / 407 - Looked at hold downs. re-inspection.
|
INSP - Framing/Rough-in | 8/26/1998 | 8/26/1998 | 8/26/1998 | P | FAIL |
Russ Owen
|
|
|
/ / 407 - pat ###-#### okay to cover
|
INSP - Framing/Rough-in | 8/25/1998 | 8/25/1998 | 8/25/1998 | A | PART |
Russ Owen
|
|
|
ADDED BOLTS TO FRONT HOLD DOWNS,ALSO TOLD CONTRACTOR TO GET INFORMATION FOR THE SHAFTS FOR COOKING EQUIPMENT.
|
INSP - Framing/Rough-in | 8/20/1998 | 8/20/1998 | 8/20/1998 | P | PASS |
Russ Owen
|
|
|
exterior shear nailing.
|
INSP - Framing/Rough-in | 8/17/1998 | 8/17/1998 | 8/17/1998 | P | PART |
Russ Owen
|
|
|
WALLS IN FREEZER ONLY ,NEED TO ADD ANCHOR BOLTS.
|
INSP - Foundation | 7/13/1998 | 7/14/1998 | 7/14/1998 | P | PART |
Russ Owen
|
|
|
07/14/98 407 - subject to the special inspectors approval.
|
INSP - Foundation | 7/10/1998 | 7/13/1998 | 7/13/1998 | A | PART |
Russ Owen
|
|
|
07/13/98 407 - special inspector has been by and approved per contractor
|
INSP - Foundation | 7/9/1998 | 7/9/1998 | 7/10/1998 | P | PART |
Russ Owen
|
|
|
07/09/98 407 - subject to special inspector approval.jack-in-box- call j
|
Routing Off Site - A.C.H.D | 3/31/1998 | | 7/7/1998 | | PASS |
|
|
|
PACKAGE #2 CONTACTED MIKE CAPSHAW AT ###-#### TO TAKE PLANS OUT TO ACHD
|
(F) Reprint permit | | | 7/7/1998 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 7/6/1998 | | |
|
|
|
|
90 day tracking............. | | 3/30/1998 | 6/28/1998 | | PEND |
|
|
|
|
Plan resubmittals received | | | 6/12/1998 | | PEND |
|
|
|
RECEIVED RESUBMITTALS FROM BRS, FORWARDED SAME TO ARLAN SMITH
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/12/1998 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 6/11/1998 | | 6/12/1998 | | PASS |
|
|
|
|
Print Occupancy Form | | | 6/12/1998 | | |
|
|
|
|
Inspection Record Card- Bld | | | 6/12/1998 | | |
|
|
|
|
Telephone call | | | 6/12/1998 | | PASS |
|
|
|
TALKED TO MIKE CAPSHAW TO VERIFY PLANS ARE READY GAVE $ AMT
|
Plan assigned to (ADS) | 3/30/1998 | | 6/12/1998 | | PASS |
|
|
|
|
Routing - PLANNING | 6/3/1998 | | 6/11/1998 | | PASS |
|
|
|
DRH98-0048 Applicant submitted revised plan for landscaping, and plans red-lined for 7' parking setback/compact stall as required in DR conditions.
|
Telephone call | | | 5/26/1998 | | FAIL |
|
|
|
Spoke to Rick Toews at BRS. I informed him that ACHD and planning approvals were needed. ACHD approval to be in the form of the new "acceptance letter".
|
Routing - FIRE | 5/18/1998 | | 5/22/1998 | | PASS |
|
|
|
PACKAGE #1
|
Routing - PLAN CHECK | 5/18/1998 | | 5/18/1998 | | PEND |
|
|
|
pending approval form planning & fire department & ACHD.
|
Routing - PLANNING | 5/8/1998 | | 5/15/1998 | | FAIL |
|
|
|
PACKAGE #1. Plans do not comply with Design Review conditions #1f & 1g. See letter in DRH98-48 File, dated 5/15/98.
|
Routing - PLUMBING | 5/6/1998 | | 5/8/1998 | | PASS |
|
|
|
PACKAGE #1
|
Routing - PUBLIC WORKS | 5/1/1998 | | 5/6/1998 | | PASS |
|
|
|
PACKAGE #1
|
Routing Off Site - C.D.H | 4/1/1998 | | 5/1/1998 | | PASS |
|
|
|
PACKAGE #1 CONTACTED MIKE CAPSHAW AT ###-#### TO TAKE PLANS OUT TO CDH
|
Plans ACCEPTED BY PLAN CHECK | | | 4/1/1998 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 3/30/1998 | | HOLD |
|
|
|
CONTACTED MIKE CAPSHAW AT ###-#### TO LET HIM KNOW THAT PACKAGE #1 NEEDS SHEETS M1 THRU M4 AND H1 THRU H3 STAMPED AND SIGNED. DRAINAGE CALCS, AND A SOILS REPORT OR A LETTER STATING SOILS BEARING PRESSURE OF 1500 PSF. KMM 04-01-98 RECEIVED 2 COPIES OF STAMPED AND SIGNED M & H SHEETS. RECEIVED 2 COPIES OF SOILS REPORT. RECEIVED LETTER FROM HUBBLE REGARDING DRAINAGE. PLANS READY TO ROUTE.
|
Routing - PLAN CHECK | 3/30/1998 | | 3/30/1998 | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 3/30/1998 | | 3/30/1998 | | |
|
|
|
WE WILL DO THE ENG. PER JOHN M.
|
Received Certificate of Value | | | 3/30/1998 | | PASS |
|
|
|
|
Application received | | | 3/30/1998 | | |
|
|
|
|
Plan assigned to (MYS) | 3/30/1998 | | 3/30/1998 | | PASS |
Marlene Southard
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 3/30/1998 | | HOLD |
|
|
|
SEE ACTION A007 HOLD
|
Routing - PLAN CHECK | 5/22/1998 | | | | |
|
|
|
need planning and ACHD approvals
|