Receive PAYMENT IN FULL | | | 4/15/1999 | | |
|
|
|
|
INSP - Final | 3/25/1999 | 3/26/1999 | 3/26/1999 | P | PASS |
Carl Dependahl
|
|
|
###-#### JANINE//FINAL OCCUPY
|
INSP - Final | 3/26/1999 | 3/26/1999 | 3/26/1999 | | PASS |
Carl Dependahl
|
|
|
03/26/99 340 - ###-#### JANINE//FINAL OCCUPY card signed by plbg, elec, & fire per cathy ok, for c/o.
|
Permanent occupancy UNPAID FEE | | | 3/26/1999 | | PASS |
|
|
|
Perm. Occ. Cert. #7703 issued 3-26-99 to Heavenly Ham.
|
Permanent Occupancy | | 3/25/1999 | 3/25/1999 | | DONE |
|
|
|
|
INSP-Final Inspection | 3/24/1999 | 3/24/1999 | 3/24/1999 | P | PASS |
Joe Tawney
|
|
|
03/24/99 406 - REINSP OK FOR PERM OCC
|
INSP - Final | 3/24/1999 | 3/24/1999 | 3/24/1999 | P | FAIL |
Carl Dependahl
|
|
|
03/24/99 340 - Heavenly Ham, final reinspect - Cathy has the card needplbg,elec finals, recall
|
Fee Review-notes | 12/17/1998 | | 2/23/1999 | | |
|
|
|
FEES DUE
|
Code Occupancy Approval | | | 1/28/1999 | | PASS |
|
|
|
Meets compliance with DRH97-0238. PASS
|
Temporary occupancy | | | 12/21/1998 | | PASS |
|
|
|
Temp. Occ. Cert. #3760 issued 12-21-98 to Heavenly Ham.
|
INSP-Final Inspection | 12/11/1998 | 12/11/1998 | 12/11/1998 | | PART |
Joe Tawney
|
|
|
12/10/98 406 - RICHARD EVANS ###-#### FN FIRE REINSP OK FOR TEMP OCC ALARM SUBMITTAL, KNOX BOX, FAX ALARM SIG, SIGNS
|
INSP - Final | 12/10/1998 | 12/10/1998 | 12/10/1998 | | PASS |
|
|
|
12/09/98 338 - made ok for temp occ
|
INSP-Final Inspection | 12/8/1998 | 12/9/1998 | 12/9/1998 | P | FAIL |
Joe Tawney
|
|
|
12/09/98 406 - RICHARD ###-#### FN FIRE-RE-INSP REINSP FAIL ALL ITEMS ON C/N NOT COMPLETED
|
INSP-Final Inspection | 12/4/1998 | 12/8/1998 | 12/8/1998 | A | FAIL |
Joe Tawney
|
|
|
12/08/98 406 - RICHARD EVANS ###-#### FN FIRE FINAL FAIL RATED DOORS, PLAN & FIRE REVIEW NOTES, ALARM SYSTEM, DUCT DET
|
Code Occupancy Approval | | | 12/4/1998 | | |
|
|
|
final requested by Richard Evans-###-####
|
INSP - Framing/Rough-in | 11/19/1998 | 11/19/1998 | 11/19/1998 | | PART |
|
|
|
11/14/98 338 - madeok for the shaft and the main grid need 3 pods and to
|
INSP - Framing/Rough-in | 11/19/1998 | 11/19/1998 | 11/19/1998 | | PART |
|
|
|
11/14/98 338 - madeok for the shaft and the main grid need 3 pods and to
|
INSP - Framing/Rough-in | 11/19/1998 | 11/19/1998 | 11/19/1998 | | PART |
|
|
|
11/14/98 338 - madeok for the shaft and the main grid need 3 pods and to
|
INSP - Final | 12/9/1998 | 12/10/1998 | 11/10/1998 | P | PART |
|
|
|
12/11/98 338 - mad ok for emp occ signed the temp col behind 350/ 408
|
Print Occupancy Form | | | 10/19/1998 | | |
|
|
|
|
Inspection Record Card- Bld | | | 10/19/1998 | | |
|
|
|
|
INSP - Framing/Rough-in | 10/14/1998 | 10/14/1998 | 10/14/1998 | P | FAIL |
|
|
|
10/15/98 338 - OTH-OTHER AGENCIES NOT APPROVED c/n issued temp glass nee
|
INSP - Framing/Rough-in | 9/4/1998 | 9/8/1998 | 9/9/1998 | A | PART |
|
|
|
09/08/98 338 - upper decking ok with sp insp approvals for welding etc.
|
INSP - Framing/Rough-in | 8/18/1998 | 8/19/1998 | 8/19/1998 | A | PART |
|
|
|
08/19/98 338 - madeok r-bar is placed
|
INSP - Framing/Rough-in | 8/17/1998 | 8/17/1998 | 8/17/1998 | P | PART |
|
|
|
08/17/98 338 - made ok to pour b/beam r-bar placed
|
INSP - Concrete | 8/12/1998 | 8/13/1998 | 8/13/1998 | A | CANC |
Alan Hauser
|
|
|
08/13/98 350 - kurt at ###-####-1025 pager # to be done by #408
|
INSP - Framing/Rough-in | 8/11/1998 | 8/11/1998 | 8/11/1998 | P | PART |
|
|
|
08/11/98 338 - r-bar placed
|
INSP - Framing/Rough-in | 8/4/1998 | 8/5/1998 | 8/5/1998 | P | PART |
|
|
|
08/05/98 338 - made ok to pour bond beam, all weep holes are in place an
|
Plan resubmittals received | | | 7/24/1998 | | |
|
|
|
07/08/98 resubmittals recieved at building department.pre reviewed by JML and turned over to me on 7-23-98. 07-27-98 calle d clancy arch. Spoke with Carl he said that Jeff was the person to talk to. I asked to recieve a lettewr to explain the changes inb detail that I might follow changes in a timely manor. He is to call me back on the cell #.
|
INSP - Foundation | 7/13/1998 | 7/13/1998 | 7/13/1998 | P | PART |
|
|
|
07/13/98 338 - made ok need to extend short bars for proper lap below wi
|
INSP - Foundation | 7/9/1998 | 7/10/1998 | 7/10/1998 | A | PART |
|
|
|
07/10/98 338 - FOOTING/ 1-###-#### made ok to pour r-bar is placed f
|
Plan resubmittals received | | | 7/8/1998 | | PEND |
|
|
|
RECEIVED RESUBMITTTALS FROM JIM GLANCY, FORWARDED SAME TO JIM SLY.
|
90 day tracking............. | | 3/31/1998 | 6/29/1998 | | PEND |
|
|
|
|
(F) Reprint permit | | | 6/11/1998 | | |
|
|
|
|
(F) Reprint permit | | | 6/11/1998 | | |
|
|
|
|
(F) Reprint permit | | | 6/11/1998 | | |
|
|
|
|
Print Occupancy Form | | | 6/9/1998 | | |
|
|
|
|
Telephone call | | | 6/9/1998 | | MESS |
|
|
|
LEFT MESSAGE FOR MOE STARK THAT PLANS ARE READY
|
Inspection Record Card- Bld | | | 6/9/1998 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/9/1998 | | PASS |
|
|
|
|
Issue PAID IN FULL permit | | | 6/9/1998 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 6/9/1998 | | PASS |
|
|
|
A FIELD SUBMITTAL IS REQUIRED FOR THE STRUCTURAL CHANGE TO THE FLOOR SYSTEM AT THE REVIESED REAR STAIR.
|
Routing - PLAN CHECK | 6/9/1998 | | 6/9/1998 | | PASS |
|
|
|
APPROVED
|
Plan assigned to (JML) | 4/1/1998 | | 6/9/1998 | | PASS |
|
|
|
|
Telephone call | | | 6/1/1998 | | FAIL |
|
|
|
RESUBMITTALS FAILED OVER NEW ISSUES WITH ACHD, CDH & STRUCTURAL CHANGE
|
Plan resubmittals received | | | 5/29/1998 | | |
|
|
|
RECIEVED RESUBMITTALS AND SENT THEM TO JOHN LEVIEN
|
Meeting | | | 5/27/1998 | | FAIL |
|
|
|
I met w/ James Glancey and Jeff Geibel on 5/21 about the building design. Issues unresolved are the separation of exits from the upper floor and the accessibility of the employees restroom. Jeff was told by phone that the second floor exits could only be approved if the proposed corridor entered stair enclosures which were separated by at least 30 feet. James was told by phone on 5/26 that a horizontal exit was an option and that the horizontal separation only needed to apply to the individual areas created by the 2-hour wall.
|
Routing Off Site - STRUCTURAL | 5/20/1998 | | 5/27/1998 | | PASS |
|
|
|
SENT RESUBS TO CH2MHILL DAR
|
Routing - PLAN CHECK | 5/18/1998 | | 5/20/1998 | | FAIL |
|
|
|
The resubmission failed. The Arch. Jeffery Geibel is expressing a differing interpretation to various code provisions as to how they apply to this project. Specifically: exit arrangement and accessibility requirements. I have invited him and James Glancey to meet with me about these and other issuses relevant to this project. He will call me back and schedule a meeting.
|
Routing - FIRE | 5/13/1998 | | 5/15/1998 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 5/8/1998 | | 5/13/1998 | | FAIL |
|
|
|
I SENT A FAX AND MAIL COPY OF MY PLAN REVIEW AND ENGINERING PLAN REVIEW TO jEFF AT ARCHITECTS OFFICE. SENDING ON TO FIRE.
|
Routing - PUBLIC WORKS | 5/8/1998 | | 5/12/1998 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 4/6/1998 | | 5/11/1998 | | FAIL |
|
|
|
SENT TO CH2MHILL--DF JOHN MYNARD FAXED A COPY OF THE CONSULTING ENG PLAN REVIEW FINDINGS WHICH WAS DATED 4/30/98 TO JIM CLANCEY THE PROJECT ARCH. OF RECORD.
|
Routing - PUBLIC WORKS | 5/8/1998 | | 5/8/1998 | | FAIL |
|
|
|
|
Routing - PLUMBING | 4/30/1998 | | 5/1/1998 | | PASS |
|
|
|
|
Routing - PLANNING | 4/28/1998 | | 4/30/1998 | | PASS |
|
|
|
I redlined the plans to comply with conditions related to screening along the south property line, per letter of clarification (not the action letter) dated April 27, 1998.
|
Routing - PLANNING | 4/30/1998 | | 4/30/1998 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 4/7/1998 | | 4/28/1998 | | FAIL |
|
|
|
REQUIRES STREET LIGHT PLAN. BILL COLSON
|
Routing Off Site - C.D.H | 4/24/1998 | | 4/24/1998 | | PASS |
|
|
|
|
Routing - PLANNING | 4/2/1998 | | 4/7/1998 | | FAIL |
|
|
|
x-ref cup97-88, drh97-238; does not comply with conditions of approval. reference memo sent to Jeff Geibel, Jim Glancey Architects office.
|
Plans ACCEPTED BY PLAN CHECK | | | 4/2/1998 | | PEND |
|
|
|
CONTACTED JEFF OF JIM GLANCY'S OFFICE TO TAKE PLANS TO ACHD AND THAT PLAN CHECK WAS NOT INVOLVED. FAXED ACHD INFO SHEET. ALSO ADVISED JEFF OF THE FOLLOWING: SHEET A11 NEEDS SIGNED; REQUESTED SITE PLAN;ASKED JEFF TO CONTACT BRIAN MURPHY ABOUT THE DRAINAGE PLAN SUBMITTED; KITCHEN PLANS; STRUCTURAL CACULATIONS; SPECIFICATIONS AND KITCHEN PLANS.DAR 04/02/98. 4-6-98 RECEIVED 2 SHEET A-11, 1 COMPLETE SET OF PLANS/PACKAGE #2 3 STRUCTURAL CALCS/PACKAGE #1 & 2, 1 KITCHEN LAYOUT FOR HEALTH DEPT. A-3 P-1.1 AND P-2.1
|
Plan assigned to (MYS) | 3/31/1998 | | 4/1/1998 | | PASS |
Marlene Southard
|
|
|
|
Application received | | | 3/31/1998 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/31/1998 | | PEND |
|
|
|
|
Routing Off Site - A.C.H.D | 4/27/1998 | | | | PASS |
|
|
|
PASSED AT ACHD AND FEES PAID, RECEIPT #98-1370 DATED 4/24/98. DAR
|