BLD-Final | 2/2/2017 | 2/3/2017 | 2/3/2017 | P | PASS |
Jim Sly
|
|
|
would like call ahead; Suzanne Phone #: ###-#### Final ok on everything but.......THEY DID NOT DO THE WINDOW IN BASEMENT.
|
DOC - Permit Finaled | 2/3/2017 | 2/3/2017 | 2/3/2017 | P | PASS |
Jim Sly
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/2/2017 | | DONE |
|
|
|
as per Bob Archibald - okay to re-open permit for final inspection needed
|
BLD-Conference | 2/1/2017 | 2/1/2017 | 2/1/2017 | A | DONE |
Bob Archibald
|
|
|
Final inspection can be made after a two hour addmin fee is paid.
|
Case Summary (BLD) | | | 7/15/2015 | | |
|
|
|
|
DOC - Permit Expired | 2/5/2001 | 2/5/2001 | 2/5/2001 | P | PASS |
Russ Owen
|
|
|
Added by Inspector: 407 On 2/5/2001 4:21:26 PM
|
Application received | | | 4/6/1998 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/6/1998 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/6/1998 | | |
|
|
|
|