Permit Information
Permit NumberBLD98-00972
StatusFinaled
Name HEWLETT PACKARD (BLDG. 7)
Site Address 11311 W CHINDEN BLVD
Project NameHP #7 - MAINTENANCE
Customer Number 
ePlanReviewNo
Description
To relocate the 1,608 sq.ft. maintenance shop from Building 5 to Building 7 on the 1st floor per approved plans on file. Work to include construction of new non-bearing, noncombustible, sheetrocked wall at the North side of the project area to create the maintenance room. To remove a door and reduce an opening size to allow installation of a new double door in the Southwest corner area of the room. To relocate electrical & mechanical fixture's within existing grid of suspended ceiling, relocate & install an existing exhaust hood system from Bldg. #5 to Bldg. #7, a new RA duct & new electrical as required for equipment. Electrical, plumbing & mechanical systems will be field verified and owner / contractor agree to comply with said codes as directed by the field inspector for these specialties. Separate permits are required for each specialty contractor. To install and or maintain sprinkler and alarm systems as regulated by the Fire Dept. field inspector & plan review comments. This building is fully fire sprinklered. (P.C.#219-98)/ drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  12/16/1998 PASS
Letter of Compliance #14954 issued 12-16-98.
INSP - Final12/14/199812/14/199812/15/1998PPASS
DetailsTom Arcoraci
12/15/98 408 - DICK...###-####..HP #7
INSP-Final Inspection10/5/199810/5/199810/5/1998PPASS
DetailsJoe Tawney
10/06/98 406 - dick ###-#### FINAL OK FOR CERT OF COMPLETION ì
90 day tracking............. 4/10/19987/9/1998 PEND
Issue PAID IN FULL permit  5/8/1998
Print Occupancy Form  5/6/1998
Telephone call  5/6/1998 PASS
TALKED TO MARK BOWLIN TO VERIFY PLANS ARE READY
Issue & PRINT FEE-DUE permit  5/6/1998
Inspection Record Card- Bld  5/6/1998
PLANS/APPL TAKEN TO FRONT DESK  5/5/1998 PASS
Information noted on plan review to be provided to fire & structural inspectors in the field and the electrical, mechanical & plumbing are field verified per current plan review procedures
Plan assigned to (DRS)4/13/1998 5/4/1998 PASS
DetailsDan Stuart
Started plan review for project.
Telephone call  5/4/1998 PASS
Talked with Chaz Fillanowicz, architect, to request verification of physical & health hazard materials that may be used within the project area to verify that all materials do not exceed the allowable limits based on Tables 3-E & 3-D UBC.
Routing - PLAN CHECK5/1/1998 5/4/1998 PASS
Routing - FIRE4/30/1998 4/30/1998 PASS
Routing - PLAN CHECK4/14/1998 4/29/1998 PEND
Started plan review of proposed project.
Print Pending Permit.LaserJet4  4/29/1998 PEND
Routing - PLAN CHECK4/29/1998 4/29/1998 PEND
Completed initial plan review. Faxed and mailed copy of review comments to architect for response. Routed plans to fire department plan review.
Routing - PUBLIC WORKS4/14/1998 4/14/1998 PASS
Plans ACCEPTED BY PLAN CHECK  4/13/1998
TAKEN TO MARLENE
Plan routing begun/TENANTS  4/13/1998
Route to PUBLIC WORKS, PLAN CHECK and FIRE.
Plan assigned to (MYS)4/10/1998 4/13/1998
DetailsMarlene Southard
Application received  4/10/1998
Recd Pcfee & Taken To Pln CK  4/10/1998 PEND