Permit NumberBLD98-01002
StatusFinaled
Name PAUL MOHR
Site Address 7031 S EISENMAN RD
Project NamePOWER BAR TI
Customer Number223-98
ePlanReviewNo
Description
TENANT IMPROVEMENT FOR NEW ADDITION AND REMODEL OF EXISTING OFFICE AND RESTROOMS. WORK INCLUDES NEW INTERIOR PARTITIONS OF STEEL STUD AND GYP. BOARD TO CREATE A NEW WORK SHOP WITH TWO OFFICES, SEPARATE WAREHOUSE AT ELEVATION IN FLOOR, AND TWO NEW OFFICES ON WEST SIDE OF NEW ADDITION. THREE NEW OFFICES WITH A REMODELED EXIT\LOCKER AREA WILL BE DONE IN THE EXISTING MANUFACTURING AREA WITH NEW SMOKE VENTS. CEILINGS WILL BE GYP. BOARD AND ACOUSTICAL TILE IN OFFICES AND BATHROOM. A SPEARATE PLAN APPROVAL AND PERMIT IS REQUIRED FOR HIGH RACK STORAGE WITH INPECTIONS COMPLETED PRIOR TO OCCUPANCY. ALL WORK IS PER APPROVED PLANS PC223-98.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  4/10/2014 DONE
Fee Review-notes7/22/1998 12/15/1998
Permanent Occupancy 9/14/19989/14/1998 DONE
Details
INSP - Final9/11/19989/14/19989/14/1998APASS
DetailsJim Storey
09/14/98 301 - CHRIS ###-#### FNL -OK FINAL card w/contractor for city sign offs. ì
Permanent occupancy  9/14/1998 PASS
Perm. Occ. Cert. #7405 issued 9-14-98 to Power Bar, Inc.
INSP - Final9/10/19989/11/19989/11/1998ACANC
DetailsWes Worcester
09/11/98 342 - chris ###-####
INSP-Final Inspection9/10/19989/10/19989/10/1998PPASS
DetailsRick Jackson
chris occ approved
INSP-Sprinkler Rough-in/Hydro9/10/19989/10/19989/10/1998PPASS
DetailsRick Jackson
CHRIS ###-#### COME AFTER 2:30 IF POSSIBLE sprinkler heads okay in new offices
INSP-Conference9/4/19989/8/19989/9/1998APART
DetailsRuss Owen
09/09/98 407 - has corrections with some wall braces and draft curtins. also fire life safety items.
INSP-Conference9/4/19989/8/19989/8/1998APART
DetailsRick Jackson
conference chris ###-#### final requirements: sprinklers obstructed in offices; alarms not complete or tested
90 day tracking............. 4/14/19987/13/1998 PEND
INSP - Framing/Rough-in7/8/19987/9/19987/9/1998APART
DetailsRuss Owen
07/09/98 407 - Office space,Have corrections for the doors CABO/ANSI req vestibule pull side. ì
Plan resubmittals received  6/29/1998 PEND
RECEIVED 2 COPIES OF REVISED SHEETS A-2.0, A-2.1, AND A07.1. ROUTED TO MIKE O.
SUPER- Supervisor's review6/22/1998 6/19/1998 D
owner called requesting use of 2 office areas within this space. we said we would review areas and if work was completed we would make every effort to get them in. They never called back so they are working with us from the standpoint that the work has to be done before we can inspect it. Inspectors need to stay on top of these types of jobs so that control in their favor is constant.
INSP - Framing/Rough-in6/18/19986/18/19986/18/1998PPART
DetailsRuss Owen
06/18/98 407 - Wanted to Know if they could occupy an office space in th this would need approval from Fire life safty and our division also poss others.
Issue PAID IN FULL permit  5/13/1998
Plan assigned to (MLO)4/15/1998 5/12/1998 PASS
DetailsMike Otto
PLANS/APPL TAKEN TO FRONT DESK  5/12/1998 PASS
Telephone call  5/12/1998 PASS
###-####
Print Occupancy Form  5/12/1998
Inspection Record Card- Bld  5/12/1998
Plan resubmittals received  5/11/1998 PEND
FULL SIZE REVISED MECHANICAL SHEETS RECEIVED.MLO
Routing - PLAN CHECK5/11/1998 5/11/1998 PASS
Plan resubmittals requested  5/7/1998 FAIL
corrections mailed and faxedd to architect and contractor. MLO.
Routing - PLAN CHECK5/6/1998 5/7/1998 FAIL
Plan resubmittals received  5/5/1998
Routing - FIRE4/17/1998 4/22/1998 PASS
Routing - PLAN CHECK4/14/1998 4/17/1998 FAIL
corrections faxed and mailed to architect. mo
Plan resubmittals requested  4/17/1998 FAIL
Plan assigned to (MYS)4/14/1998 4/15/1998
DetailsMarlene Southard
Plan resubmittals received  4/15/1998
RECEIVED RESUBS FROM GEORGE BLECHA AND GAVE TO MIKE OTTO
Recd Pcfee & Taken To Pln CK  4/14/1998
Plans ACCEPTED BY PLAN CHECK  4/14/1998
Application received  4/14/1998