Permanent Occupancy | | 6/23/1999 | 6/23/1999 | | DONE |
|
|
|
|
INSP - Final | 6/23/1999 | 6/23/1999 | 6/23/1999 | P | PASS |
|
|
|
Don ###-#### other agencies approved
|
Permanent occupancy | | | 6/23/1999 | | PASS |
|
|
|
Perm. Occ. Cert. #7810 issued 6-23-99 to Intermountain Design.
|
Code Occupancy Approval | | | 6/21/1999 | | PASS |
|
|
|
Made inspection for Final - approved per modifications approved by TKW 6/02/99 For DRH97-0122 - PASS
|
Code Occupancy Approval | | | 6/18/1999 | | |
|
|
|
Final Occupancy requested by Don Young ###-####
|
INSP - Final | 1/4/1999 | 1/4/1999 | 1/4/1999 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP OK FOR PERM OCC
|
Temporary occupancy | | | 12/14/1998 | | PASS |
|
|
|
Temp. Occ. Cert. #3757 issued 12-14-98 to Intermountain Design.
|
INSP - Final | 12/9/1998 | 12/10/1998 | 12/11/1998 | A | FAIL |
|
|
|
12/11/98 338 - ALL AGENCY'S DONE IN AM...DON ###-#### other agencies not
|
Code Occupancy Approval | | | 12/11/1998 | | |
|
|
|
temporary requested by Don Young-###-####
|
Code Occupancy Approval | | | 12/11/1998 | | TEMP |
|
|
|
Posted Cashier's Check for $17,615.00 for underground Sprinkler System and Landscaping.
|
INSP-Final Inspection | 12/10/1998 | 12/10/1998 | 12/10/1998 | | PART |
Joe Tawney
|
|
|
12/10/98 406 - DON...###-#### REINSP OK FOR TEMP OCC KNOX BOX FAX OF ALARMS 12/3/98 12/10/98
|
INSP-Final Inspection | 12/10/1998 | 12/10/1998 | 12/10/1998 | | PART |
Joe Tawney
|
|
|
12/10/98 406 - DON...###-#### REINSP OK FOR TEMP OCC KNOX BOX, FAX OF ALARM SIG 12/3/98 12/10/98
|
INSP - Final | 12/9/1998 | 12/9/1998 | 12/9/1998 | | FAIL |
|
|
|
12/09/98 338 - not ready other agencies not approved
|
INSP - Final | 12/8/1998 | 12/8/1998 | 12/8/1998 | | FAIL |
Joe Tawney
|
|
|
/ / 406 - FINAL FAIL ALARM & SPKLR SYSTEMS OK BLDG ADDRESS, DUCT DET,
|
INSP - Final | 12/3/1998 | 12/3/1998 | 12/3/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - FINAL ON ALARMS & SPKLR SYSTEMS MOVE 3 SMOKE DET, ADD 1 HEAT
|
INSP-Final Inspection | 11/18/1998 | 11/19/1998 | 11/19/1998 | A | PART |
Joe Tawney
|
|
|
11/19/98 406 - TRACY ###-####-PER JOE 11? OK ON UNDERGROUND & ABOVE GROUND HYDRO TESTS SPKLR ROUGH IN. FEW CORRECT
|
INSP-Supply line flush | 11/5/1998 | 11/6/1998 | 11/6/1998 | P | PART |
Joe Tawney
|
|
|
11/06/98 406 - TRACY ###-#### OK ON SUPPLY LINE FLUSH
|
INSP - Framing/Rough-in | 11/3/1998 | 11/3/1998 | 11/3/1998 | | PASS |
|
|
|
/ / 338 - MADE OK TO COVER C/N REMOVED
|
INSP - Framing/Rough-in | 11/2/1998 | 11/2/1998 | 11/2/1998 | P | FAIL |
|
|
|
11/03/98 338 - fire insp correction notice some parts reinspected by me
|
INSP - Framing/Rough-in | 10/28/1998 | 10/29/1998 | 10/29/1998 | P | CANC |
Jim Sly
|
|
|
10/29/98 316 - Sent to Perry P....Per Bob A.
|
INSP - Foundation | 8/12/1998 | 8/13/1998 | 8/13/1998 | A | PART |
|
|
|
08/13/98 338 - made ok with sp insp approval
|
INSP - Concrete | 8/10/1998 | 8/11/1998 | 8/11/1998 | A | PART |
|
|
|
08/11/98 338 - made ok with sp insp approval
|
INSP - Foundation | 8/4/1998 | 8/5/1998 | 8/5/1998 | A | PART |
|
|
|
08/05/98 338 - made ok to pour int footings and found wallas sp insp are
|
INSP - Framing/Rough-in | 7/24/1998 | 7/27/1998 | 7/28/1998 | P | PART |
|
|
|
07/27/98 338 - ok to pour the west and north walls to the bulkheads
|
90 day tracking............. | | 4/15/1998 | 7/14/1998 | | PEND |
|
|
|
|
INSP - Footings | 7/10/1998 | 7/10/1998 | 7/10/1998 | | NR |
|
|
|
/ / 338 - NOT READY
|
INSP - Footings | 7/10/1998 | 7/10/1998 | 7/10/1998 | | NR |
|
|
|
/ / 338 - NOT READY
|
INSP - Foundation | 7/9/1998 | 7/10/1998 | 7/10/1998 | A | PART |
|
|
|
07/10/98 338 - FOOTING/ CEL ###-#### c/n issued to corrections to be ver
|
(F) Reprint permit | | | 6/12/1998 | | |
|
|
|
|
Print Occupancy Form | | | 6/11/1998 | | |
|
|
|
|
Inspection Record Card- Bld | | | 6/11/1998 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/11/1998 | | |
|
|
|
|
Plan assigned to (ADS) | 4/24/1998 | | 6/10/1998 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 6/8/1998 | | 6/10/1998 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/10/1998 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 4/29/1998 | | 6/10/1998 | | PASS |
|
|
|
SENT TO ATWOOD HINZMAN AND JONES RECEIVED COMMENTS RELEY WANTS A SECOND REVIEW 5/11/98 approved correction 5/10/98
|
Routing - PLAN CHECK | 6/10/1998 | | 6/10/1998 | | PASS |
|
|
|
sent for structural 2nd review 8 June to AHJ.
|
Telephone call | | | 6/8/1998 | | FAIL |
|
|
|
Spoke to Chuck Tookey. I formed him that the basement is required to be accessible & that the elevator if used for the accessible route must comply with CABO/ANSI A117.1.
|
Routing - PUBLIC WORKS | 6/2/1998 | | 6/5/1998 | | FAIL |
|
|
|
NEEDS 3 MORE COPIES OF DRAINAGE PLAN
|
Plan resubmittals received | | | 6/5/1998 | | |
|
|
|
|
Routing - FIRE | 5/27/1998 | | 6/1/1998 | | PASS |
|
|
|
alarm plans required
|
Plan resubmittals received | | | 5/26/1998 | | PEND |
|
|
|
RESUBMITTALS RECIEVED AND PASSED ON TO ARLAN. These are fire code items (ads).
|
Routing - FIRE | 5/12/1998 | | 5/15/1998 | | FAIL |
|
|
|
fire flow
|
Routing - PLAN CHECK | 5/8/1998 | | 5/12/1998 | | FAIL |
|
|
|
initial plan review report faxed to architect.
|
Plan resubmittals received | | | 5/11/1998 | | PEND |
|
|
|
RECEIVED RESUBS FORWARDED SAME TO ARLAN.
|
Routing - PUBLIC WORKS | 5/6/1998 | | 5/8/1998 | | FAIL |
|
|
|
REQUIRE DRAIN PLAN REVISION PER BRIAN M.
|
Routing - PLUMBING | 5/8/1998 | | 5/8/1998 | | PASS |
|
|
|
|
Routing - PLANNING | 5/6/1998 | | 5/6/1998 | | PASS |
|
|
|
DRH97-0122
|
Plan resubmittals received | | | 4/29/1998 | | PEND |
|
|
|
RECEIVED RESUBMITTALS AND TAKEN TO ARLAN S.
|
Plan assigned to (MYS) | 4/15/1998 | | 4/24/1998 | | PASS |
Marlene Southard
|
|
|
|
Plan Reviewer's activity | | | 4/24/1998 | | HOLD |
|
|
|
PLANS PUT ON HOLD. REQUESTED THAT ADDENDUMS BE INCORP0RATED INTO SCALE DRAWINGS. REQUESTED 3RD SET OF PLANS TO SEND TO OUTSIDE ENGINEERING. ARLAN MADE CALL AT JOHN MENARD'S REQUEST. DAR 4/24/98
|
Recd Pcfee & Taken To Pln CK | | | 4/15/1998 | | PEND |
|
|
|
|
Application received | | | 4/15/1998 | | |
|
|
|
|