Case Summary (BLD) | | | 7/30/2003 | | DONE |
|
|
|
|
DOC - Permit Expired | 1/12/2001 | 1/12/2001 | 1/12/2001 | A | PASS |
Jim Storey
|
|
|
Added by Inspector: 301 On 1/12/2001 9:27:40 AM
|
Receive PAYMENT IN FULL | | | 9/3/1999 | | |
|
|
|
|
CHANGE STATUS TO (F) | | | 8/11/1999 | | |
|
|
|
|
Fee Review-notes | 5/4/1999 | | 5/4/1999 | | |
|
|
|
1,205,950.00 additional value..permit bld98-1484 was 373,024.00 less value I took 373,024.00 from 1,205,950.00 = 832,926.00 and added that to this permit
|
(F) Reprint permit | | | 5/4/1999 | | |
|
|
|
|
INSP-Final Inspection | 12/4/1998 | 12/4/1998 | 12/4/1998 | P | PART |
Rick Jackson
|
|
|
temp occ approved for 2nd floor; c/n issued
|
INSP-Final Inspection | 12/3/1998 | 12/3/1998 | 12/3/1998 | A | PART |
Rick Jackson
|
|
|
walk through for final occupancy - work not completed
|
INSP-Final Inspection | 12/1/1998 | 12/1/1998 | 12/1/1998 | P | PART |
Rick Jackson
|
|
|
checked progress for final
|
SUPER- Supervisor's review | 11/30/1998 | 11/30/1998 | 11/30/1998 | | |
|
|
|
both rinks approved for temp. systems work to be retested this week. needs to shut down units with duct detectors.
|
INSP-Final Inspection | 11/30/1998 | 11/30/1998 | 11/30/1998 | P | PART |
Rick Jackson
|
|
|
checked progress for final with George S.
|
INSP-Final Inspection | 11/25/1998 | 11/25/1998 | 11/25/1998 | P | PART |
Rick Jackson
|
|
|
temp occ approved for first floor only
|
INSP - Framing/Rough-in | 11/24/1998 | 11/24/1998 | 11/24/1998 | | PART |
Russ Owen
|
|
|
/ / 407 - PARTIAL INSPECTION TO CHECK FOR ITEMS TO TO OBTAIN TEMP OC F
|
INSP-Final Inspection | 11/24/1998 | 11/24/1998 | 11/24/1998 | P | FAIL |
Rick Jackson
|
|
|
alarms not complete; sprinklers okay
|
INSP - Conference | 11/23/1998 | 11/23/1998 | 11/23/1998 | | PART |
Russ Owen
|
|
|
/ / 407 - OUT TO JOB SITE FOR PROGRESS CHECK.
|
INSP-Final Inspection | 11/20/1998 | 11/20/1998 | 11/20/1998 | P | PART |
Rick Jackson
|
|
|
temp occ approved for rink "a" only for the weekend
|
Print Occupancy Form | | | 11/20/1998 | | |
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 11/19/1998 | 11/19/1998 | 11/19/1998 | P | FAIL |
Rick Jackson
|
|
|
small leak, will retest on 11/20
|
INSP - Conference | 11/19/1998 | 11/18/1998 | 11/19/1998 | | PART |
Russ Owen
|
|
|
/ / 407 - MEET WITH THE APPROPRIATE PARTIES TO LOOK AT THE POSSIBILITY
|
INSP-Final Inspection | 11/18/1998 | 11/18/1998 | 11/18/1998 | P | FAIL |
Rick Jackson
|
|
|
rink "a" occ request met with project manager to discuss requirements for opening; all issues on c/n will be ready?
|
INSP - Final | 11/13/1998 | 11/16/1998 | 11/16/1998 | P | PART |
Russ Owen
|
|
|
MEET WITH PHIL TO SCHEDUAL TIME FOR TEMP OC AT RINK A.
|
INSP - Framing/Rough-in | 11/10/1998 | 11/10/1998 | 11/10/1998 | A | PART |
Russ Owen
|
|
|
meet with architect and other trades for profit meeting.
|
INSP-Conference | 11/10/1998 | 11/10/1998 | 11/10/1998 | A | PART |
Rick Jackson
|
|
|
smoke dampers in floors; alarm testing and sprinkler tests will be done on 11/20;
|
INSP-Conference | 11/4/1998 | 11/4/1998 | 11/4/1998 | | PART |
Mike Kinnear
|
|
|
Notice of 1 EQ brace in concession need stress load check. Higher temp heads in Zamboni and compressor rooms, etc. FDC shall be clear and straight access from obstruction. Shall have QR heads in "light hazard occupancies" no matter what the system is designed for!
|
SUPER- Supervisor's review | 11/3/1998 | 11/2/1998 | 11/2/1998 | | |
|
|
|
alarm plans not quite complete but won't hold up temp. Floyd will review facility and give me an update.
|
INSP-Sprinkler Rough-in/Hydro | 10/27/1998 | 10/27/1998 | 10/27/1998 | A | PART |
Rick Jackson
|
|
|
reviewed FDC location and continued with rough-in
|
SUPER- Supervisor's review | 10/26/1998 | 10/26/1998 | 10/26/1998 | | |
|
|
|
shell is progressing exterior to be cleaned up, no constuction materials left inside or out for temp occ.
|
INSP-Conference | 10/26/1998 | 10/26/1998 | 10/26/1998 | A | PART |
Rick Jackson
|
|
|
profit meeting for partial opening scheduled for 11/13 - gave requirements to contractor
|
INSP-Sprinkler Rough-in/Hydro | 10/21/1998 | 10/21/1998 | 10/21/1998 | P | PART |
Rick Jackson
|
|
|
DOUG ###-#### upper floor has main and branch lines installed - no drops for heads in yet. peak heads are 26 inches from peak - okay. told doug a hydro test is still needed for all wet. window heads all installed
|
SUPER- Supervisor's review | 10/12/1998 | 10/12/1998 | 10/12/1998 | | |
|
|
|
gary himes needs to give us info on sprinkler heads in certain areas. this is good example of plan needs to be complete prior to inspection.
|
INSP-Sprinkler Rough-in/Hydro | 10/12/1998 | 10/12/1998 | 10/12/1998 | A | PART |
Rick Jackson
|
|
|
requested info from designer about heads on 2nd floor within 2 feet of peak - awaiting info.
|
INSP-Final Inspection | 10/6/1998 | 10/6/1998 | 10/6/1998 | P | PART |
Rick Jackson
|
|
|
doug ###-#### not a final - hydro test of first floor locker/bathroom/zamboni areas - okay. heads not cut, rehydro after heads are cut (hard lid within the above areas)
|
SUPER- Supervisor's review | 10/5/1998 | 10/5/1998 | 10/5/1998 | | |
|
|
|
hydro tests these tests are time consuming about 1 and half hours.
|
INSP-Sprinkler Rough-in/Hydro | 10/5/1998 | 10/5/1998 | 10/5/1998 | A | PART |
Rick Jackson
|
|
|
early rough-in of shell, sway bracing not installed yet;
|
INSP-Sprinkler Rough-in/Hydro | 9/17/1998 | 9/18/1998 | 9/18/1998 | A | PASS |
Rick Jackson
|
|
|
phil ###-#### rink a & b dry system; antifreeze loop and hose stations okay for hydro. rest of wet and dry canopy not installed.
|
INSP-Conference | 9/17/1998 | 9/17/1998 | 9/17/1998 | A | PART |
Rick Jackson
|
|
|
discussed hydro testing dry system/antifreeze system in arenas. will test on 9/18
|
INSP-Supply line flush | 9/4/1998 | 9/4/1998 | 9/4/1998 | A | PASS |
Rick Jackson
|
|
|
underground flush and hydro okay
|
INSP - Framing/Rough-in | 9/1/1998 | 9/1/1998 | 9/1/1998 | P | PART |
Russ Owen
|
|
|
went out reviewed plans for tenant t-i.
|
INSP - Framing/Rough-in | 8/7/1998 | 8/7/1998 | 8/7/1998 | A | PART |
Russ Owen
|
|
|
08/07/98 407 - partial inspection,only.
|
INSP - Framing/Rough-in | 8/7/1998 | 8/7/1998 | 8/7/1998 | | PART |
Jim Storey
|
|
|
/ / 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED fire stopping of floor assemb stud framing at gable weld detail west end expantion foint need fire sto detail not as per
|
INSP - Framing/Rough-in | 8/6/1998 | 8/6/1998 | 8/6/1998 | P | CANC |
Russ Owen
|
|
|
unable to do inspection this day.
|
90 day tracking............. | | 4/17/1998 | 7/16/1998 | | PEND |
|
|
|
|
(F) Reprint permit | | | 6/4/1998 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/3/1998 | | |
|
|
|
|
Inspection Record Card- Bld | | | 6/2/1998 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/2/1998 | | PASS |
|
|
|
|
Plan assigned to (JCM) | 4/21/1998 | | 6/1/1998 | | PASS |
John Menard
|
|
|
|
Routing Off Site - STRUCTURAL | 5/20/1998 | | 6/1/1998 | | PASS |
|
|
|
RECEIVED APPROVAL FOR RESUBMITTALS FROM CH2MHILL.
|
Routing - PLAN CHECK | 5/26/1998 | | 6/1/1998 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 5/27/1998 | | PEND |
|
|
|
FAXED CHERYL PEARSE AT HUMMEL'S OFFICE WITH REQUESTED INFORMATION REQUIRED BASED ON THE RESUBMITTED PLANS.
|
Plan resubmittals received | | | 5/27/1998 | | PASS |
|
|
|
RECIEVED RESUBMITTALS FROM HUMMEL AND SENT THEM TO JOHN MENARD - RESUBMITTALS REVIEWED AND APPROVED - JCM
|
Plan resubmittals requested | | | 5/27/1998 | | PEND |
|
|
|
|
Routing - PLAN CHECK | 5/12/1998 | | 5/22/1998 | | PEND |
|
|
|
|
Routing - FIRE | 5/22/1998 | | 5/21/1998 | | PASS |
|
|
|
|
Plan resubmittals received | | | 5/19/1998 | | |
|
|
|
RECIEVED RESUBMITTALS FROM HUMMEL SENT TO JOHN MENARD
|
Routing Off Site - STRUCTURAL | 4/22/1998 | | 5/15/1998 | | |
|
|
|
ONE SET OF PLNS AND SPECS SENT TO CH2MHILL. RESULTS OF REVIEW RETURNED, RESUBMITAL REQUIRED.
|
Plan resubmittals received | | | 5/15/1998 | | PEND |
|
|
|
|
Plan resubmittals received | | | 5/15/1998 | | PEND |
|
|
|
RECEIVED RESUBS FROM HUMMEL FOWARDED SAME TO JOHN MENARD.
|
Routing - FIRE | 5/6/1998 | | 5/11/1998 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 4/22/1998 | | 5/5/1998 | | PEND |
|
|
|
ONE SET OF PLANS AND SPECS TO JOHN MENARD AND ONE SET OF PLANS TO PUBLIC WORKS. DAR
|
Routing - PLUMBING | 5/4/1998 | | 5/5/1998 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 5/5/1998 | | PEND |
|
|
|
E-MAILED CHERYL PEARSE AT HUMMEL ARCHITECTS WITH A COPY OF THE CORRECTION LIST AND FOLLOWED WITH A MAILED COPY.
|
Routing - PLANNING | 5/4/1998 | | 5/4/1998 | | PASS |
|
|
|
CROSS REFERENCE FILES: CUP97-100 AND CUP98-035 CROSS REFERENCE DRH97-0236 AND DRH98-0050
|
Routing - PLANNING | 4/24/1998 | | 4/30/1998 | | PASS |
|
|
|
0NE SET OF PLANS TO PLANNING AND ZONING ONE SET TO JOHN MENARD. x-ref. DRH97-0236 and DRH98-0050
|
Routing - PUBLIC WORKS | 4/22/1998 | | 4/24/1998 | | PASS |
|
|
|
ONE SET OF PLANS AND SPECS TO PUBLIC WORKS AND ONE SET TO JOHN MENARD.
|
Routing - PLAN CHECK | 4/17/1998 | | 4/22/1998 | | PEND |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 4/22/1998 | | PEND |
|
|
|
ON 17APRIL98 PLANS AND SPECS WERE RECEIVED BUT NO SHOP DRAWINGS WERE RECEIVED PLANS WERE PUT ON HOLD BECAUSE NO SHOP DRAWINGS WERE RECEIVED. SHOP DRAWINGS RECEIVED 4/21/98. DAR
|
Plan assigned to (MYS) | 4/17/1998 | | 4/21/1998 | | |
Marlene Southard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/17/1998 | | PEND |
|
|
|
|
Application received | | | 4/17/1998 | | |
|
|
|
|