Permit Information
Permit NumberBLD98-01056
StatusFinaled
Name NATUREMARK
Site Address 250 BOBWHITE CT Unit: 3 FLR
Project NameGREYSTONE BLDG
Customer Number 
ePlanReviewNo
Description
(NATUREMARK) Fire sprinklers used to substitute for 1-hr fire-resistive construction of the building. To remodel 10,370 square feet on the 3rd floor of an existing building. The entire floor will be occupied by one office tenant. Work is to include interior nonbearing walls, a 1-hr tenant demising wall, and modifications to the existing suspended ceiling system all per approved drawings and plan review conditions on file. Selective demolition is allowed under this permit. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. The building owner has agreed to upgrade the East stair enclosure corridor on the first floor within 2 years. PC-231-98 **CJW**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 8/14/19988/14/1998 DONE
Details
INSP - Final8/14/19988/14/19988/14/1998APASS
DetailsJim Storey
APPROVED OVER PHONE WITH JSTROREY..DF
Permanent occupancy  8/14/1998 PASS
Perm. Occ. Cert. #7346 issued 8-14-98 to Naturemark in the Greystone Bldg.
INSP-Final Inspection8/7/19988/10/19988/10/1998APASS
DetailsJoe Tawney
08/10/98 406 - larry ###-#### REINSP OK FOR CERT OF COMPLETION
90 day tracking............. 4/17/19987/16/1998 PEND
INSP-Final Inspection7/2/19987/6/19987/6/1998AFAIL
DetailsJoe Tawney
07/06/98 406 - larry ###-#### REINSP FAIL EMERG LIGHTS AND DOCUMENTATION
INSP - Final6/26/19986/29/19986/29/1998ANR
DetailsJim Storey
06/29/98 301 - final/ larry ###-#### 3rd floor , was called for 6/26/98 other insp. not approved.
INSP-Sprinkler Rough-in/Hydro6/25/19986/26/19986/26/1998APASS
DetailsRick Jackson
LARRY/ ###-#### rough-in okay.
INSP-Final Inspection6/25/19986/26/19986/26/1998AFAIL
DetailsRick Jackson
LARRY/ ###-#### smoke evac system information not provided per plan check requirements.
INSP - Final6/25/19986/26/19986/26/1998PNR
DetailsJim Storey
06/26/98 301 - LARRY ###-#### , fire dept. insp. failled not ready for i done with smoke control system per planreview.
INSP - Wall cover6/8/19986/8/19986/8/1998APASS
DetailsTom Arcoraci
ok to cover interior non bearing walls told super to call for ceiling grid inspecton and fire sprinkler inspection
INSP - Framing/Rough-in6/4/19986/5/19986/8/1998AFAIL
DetailsJim Storey
06/05/98 301 - trans to tom a.
Issue PAID IN FULL permit  5/29/1998
Telephone call  5/28/1998
STAN COLE SAID HE WOULD HAVE CONTRACTOR COME PICK IT UP
Inspection Record Card- Bld  5/11/1998
Print Occupancy Form  5/11/1998
Plan assigned to (CJW)4/20/1998 5/8/1998 PASS
DetailsCarl Westfall
05/08/98 09:43:28 CJW - this action updated by action script from <<>> in Case No. BLD98-1056
Plan Reviewer's activity  5/8/1998 PASS
Drawings approved, with conditions, after resubmittal review.
PLANS/APPL TAKEN TO FRONT DESK  5/8/1998 PASS
testing condition printout  5/8/1998
Print permit w/o conditions  5/8/1998
Plan resubmittals received  5/5/1998 PEND
RECEIVED RESUBS FROM MATT RHEES OF COLE AND ASSOCIATES. PASSED SAME ON TO CARL WESTFALL. DAR
Routing - FIRE4/28/1998 4/29/1998 PASS
CONDITIONS ATTACHED
Plan Reviewer's activity  4/24/1998
UBC plan review started April 24, 1998 and finished April 28, 1998. A response from the Architect is required. See conditions list.
Routing - PUBLIC WORKS4/21/1998 4/21/1998 PASS
Plan routing begun/TENANTS  4/20/1998
Route to PUBLIC WORKS, PLAN CHECK and FIRE.
Plan assigned to (MYS)4/17/1998 4/20/1998
DetailsMarlene Southard
Recd Pcfee & Taken To Pln CK  4/17/1998 PEND
Application received  4/17/1998
Routing - PLAN CHECK4/29/1998