Permit Information
Permit NumberBLD98-01080
StatusFinaled
Name DANKA OFFICE
Site Address 12501 W EXPLORER DR Unit: 150
Project NameBOISE RESEARCH CNTR
Customer Number 
ePlanReviewNo
Description
To finish a 5,712 sq.ft. office/warehouse tenant per approved plans on file. Work to include interior partitions and a tenant demising wall separating uint 180 from 190. Alos included is a 1-hour wallbetween the retail area and the warehouse. All work permit for this project is non-combustible with metal studs and gypsumboard finishes. NOTE: This building is fully fire sprinklered. (P.C.#240-98) jml
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Receive PAYMENT IN FULL  1/26/2000 DONE
Fee Review-notes7/23/1998 12/10/1998
Permanent Occupancy 8/18/19988/18/1998 DONE
Details
Permanent occupancy  8/18/1998 PASS
Perm. Occ. Cert. #7358 issued 8-18-98 to Danka in the Boise Research Center.
INSP - Final8/17/19988/17/19988/17/1998PPASS
DetailsTom Arcoraci
08/17/98 408 - scott ###-#### ###-####
INSP-Final Inspection8/10/19988/10/19988/10/1998PPASS
DetailsJoe Tawney
08/10/98 406 - scott ###-#### REINSP OK FOR PERM OCC
INSP - Final7/21/19987/22/19987/22/1998PPART
DetailsJim Sly
07/22/98 316 - C/N...Change 20 min. door assemb to 60 min.assemb ..20 da OK for Temp Occ. per Bob A.
INSP-Final Inspection7/21/19987/22/19987/22/1998AFAIL
DetailsJoe Tawney
07/22/98 406 - temp occ. brian/ ###-#### unit 150 REINSP FAIL RATED DOOR ASSEMBLY
INSP - Final7/22/19987/22/19987/22/1998 PASS
DetailsJoe Tawney
/ / 406 - REINSP OK FOR PERM OCC J SLY TO FOLLOW UP ON 1 HR DOOR ASSAM
INSP-Final Inspection7/16/19987/20/19987/20/1998AFAIL
DetailsJoe Tawney
07/20/98 406 - Randy ###-#### REINSP FAIL RATED DOOR ISSUE NOT RESOLVED
90 day tracking............. 4/21/19987/20/1998 PEND
INSP-Final Inspection7/15/19987/16/19987/16/1998PFAIL
DetailsJoe Tawney
07/16/98 406 - ###-#### suite 150 FINAL FAIL SPKLR SYSTEM NOT TESTED
INSP - Framing/Rough-in7/7/19987/7/19987/7/1998PPASS
DetailsJim Sly
07/07/98 316 - fire wall and ceiling grid OK......Framing OK also..
INSP - Framing/Rough-in7/1/19987/2/19987/2/1998APASS
DetailsJim Sly
07/02/98 316 - ceiling grid OK
INSP-Sprinkler Rough-in/Hydro6/26/19986/29/19986/29/1998APART
DetailsJoe Tawney
06/29/98 406 - ###-#### OK ON HEAD SPACING FOR TI
INSP - Framing/Rough-in6/23/19986/24/19986/24/1998APASS
DetailsJim Sly
06/24/98 316 -
Print Pending Permit.LaserJet4  6/22/1998 PASS
approved
Print Occupancy Form  6/22/1998
Inspection Record Card- Bld  6/22/1998
Issue PAID IN FULL permit  6/22/1998
PLANS/APPL TAKEN TO FRONT DESK  6/22/1998 PASS
Routing - PLAN CHECK6/22/1998 6/22/1998 PASS
Plan assigned to (JML)4/23/1998 6/22/1998 PASS
Details
Plan Review Completed(1st rev)  6/19/1998 FAIL
ubc issues
Routing - FIRE6/17/1998 6/19/1998 PASS
noted on A1 and A0
Routing - PLAN CHECK4/28/1998 6/17/1998 FAIL
NEEDS ARCH RESPONSE, SENT FINDINGS BY FAX AND MAIL
Plan resubmittals received  6/17/1998 PEND
RECEIVED RESUBS FROM GORDON McDONALD, FORWARDED SAME TO JOHN LEVIEN.
Telephone call  5/26/1998 FAIL
I called Gordon of Habitec at ###-#### and left a message for him that I needed him to call me to provide clarification inorder for me to continue with the plan review. The review will be on hold until I hear from him.
Routing - PUBLIC WORKS4/28/1998 4/28/1998 PASS
Routing - PUBLIC WORKS4/23/1998 4/27/1998 FAIL
LOUISE REQUIRES PLUMBING PLANS FOR PUBLIC WORKS.
Plan routing begun/TENANTS  4/23/1998
Route to PUBLIC WORKS, PLAN CHECK and FIRE.
Plan assigned to (MYS)4/21/1998 4/23/1998
DetailsMarlene Southard
Recd Pcfee & Taken To Pln CK  4/21/1998 PEND
Application received  4/21/1998