Information based on query as of Friday, July 19, 2024.
Permit Information
Permit NumberBLD98-01122
StatusFinaled
Name THE BALCONY
Site Address 150 N 8TH (225, 226, 227) ST Unit: 2 FLR
Project NameCAPITAL TERRACE
Customer Number 
ePlanReviewNo
Description
(THE BALCONY) This building is required to be fire sprinkled. To expand an existing bar into an adjacent area. The floor area of the expanded tenant space, including the balcony and mezzanine, will be 7,116 square feet. Work is to include a 2-hr fire-resistive occupancy separation to function as a horizontal exit, 2 restrooms accessible to the disabled, interior nonbearing walls, modified suspended ceilings, floor finishes, counters, an interior mezzanine, structural modifications for the mezzanine, and interior stairs all per approved drawings, engineering, and plan review conditions on file. The maximum allowable occupant load of the interior space (309) and the balcony (71) shall be posted near the main exits from these areas. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. PC-250-98 **CJW**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
SUPER- Supervisor's review4/30/19994/30/19994/30/1999
smooth final profit not necessary
SUPER- Supervisor's review3/30/19993/30/19993/30/1999
finishing up work looks good.
SUPER- Supervisor's review3/9/19993/9/19993/9/1999
final tests completed on sprikler system and penitration sealed at ceiling in main area. ok c-o issued ok
Permanent Occupancy 3/5/19993/5/1999 DONE
Details
Permanent occupancy  3/5/1999 PASS
Perm. Occ. Cert. #7674 issued 3-5-99 to The Balcony in Capital Terrace.
INSP - Final3/3/19993/3/19993/3/1999 PASS
Details
/ / 338 - MADE OK SIGNED OCC REQ CARD PERM COL OTHER AGENCIES APPROVED
INSP-Final Inspection3/2/19993/2/19993/2/1999PPASS
DetailsRick Jackson
03/02/99 409 - occ approved
SUPER- Supervisor's review3/2/19993/2/19993/2/1999
sprinklers not required above dropped ceiling- because it is type IFR. and is noncombustable.
INSP - Foundation1/7/19991/7/19991/8/1999PPASS
Details
01/08/99 333 - ok
INSP - Foundation11/12/199811/13/199811/13/1998APASS
Details
11/13/98 333 - FDN -OK FOUNDATION
INSP - Final10/29/199810/30/199810/30/1998APASS
Details
10/30/98 333 - temp ok CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP-Final Inspection10/29/199810/30/199810/30/1998APART
DetailsRick Jackson
temp occ approved for balcony club; monitor control valves for anti-freeze loop (locked now); baffles between heads; repair leak onto balcony; calcs for new system
SUPER- Supervisor's review11/2/199810/30/199810/30/1998
just ready for final. 2hr occ sep. ok,
INSP - Final10/29/199810/30/199810/30/1998APASS
Details
10/30/98 333 - temp ok CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP-Sprinkler Rough-in/Hydro10/28/199810/29/199810/29/1998ANR
DetailsRick Jackson
MIKE ###-#### FIRE INSP window sprinkler system not complete
INSP-Alarm Testing10/28/199810/28/199810/28/1998PPART
DetailsRick Jackson
balcony alarms okay. annual test, alarm plans, retest entire system, batteries replaced for the entire building
INSP - Final10/23/199810/26/199810/26/1998PFAIL
Details
10/26/98 333 - pre final
INSP-Final Inspection10/23/199810/26/199810/26/1998PFAIL
DetailsRick Jackson
larry ###-#### retest voice evac; complete 2 hour wall; sprinklers for glazing
INSP-Final Inspection10/23/199810/23/199810/23/1998PFAIL
DetailsRick Jackson
requested by simplex to test alarms etc audible voice evac in other areas weak; simplex to increase volume
INSP - Framing/Rough-in10/16/199810/16/199810/16/1998 PART
Details
10/16/98 333 - demising wall ok
INSP-Sprinkler Rough-in/Hydro10/16/199810/16/199810/16/1998AFAIL
DetailsRick Jackson
head obstructed by beam in southeast corner of bar
INSP-Sprinkler Rough-in/Hydro10/6/199810/6/199810/6/1998AFAIL
DetailsRick Jackson
lower than 22 inches from deck in dance floor area; overspaced in mezzanine area; 2 painted heads; discussed requirements for temp bar at east side of space
INSP-Conference10/2/199810/2/199810/2/1998PPART
DetailsRick Jackson
TVFP requested details for the balcony sprinkler requirements
INSP - Framing/Rough-in9/30/19989/30/19989/30/1998PPASS
Details
09/30/98 333 - FRAM-OK FRAMING
INSP - Framing/Rough-in8/20/19988/21/19988/24/1998PPART
Details
08/21/98 333 - bath and sofit walls ok
INSP - Framing/Rough-in8/5/19988/7/19988/7/1998PPART
Details
08/07/98 333 - floor pour ok
90 day tracking............. 4/24/19987/23/1998 PEND
Plan assigned to (CJW)4/27/1998 6/30/1998 PASS
DetailsCarl Westfall
06/30/98 11:40:12 CJW - this action updated by action script from <<>> in Case No. BLD98-1122
Print Occupancy Form  6/30/1998
PLANS/APPL TAKEN TO FRONT DESK  6/30/1998 PASS
Issue PAID IN FULL permit  6/30/1998
Inspection Record Card- Bld  6/30/1998
Routing - FIRE6/11/1998 6/26/1998 PASS
held for Architects method of 2 hr horizontal exit. requiring hyd calcs on window spklrs and FIRE ALARM PLANS
Plan resubmittals received  6/23/1998 PEND
RECEIVED RESUBS FROM LARRY SUNDELL, FORWARDED SAME TO CARL WESTFALL.
Routing - PLANNING6/9/1998 6/10/1998 PASS
Plan Reviewer's activity  6/8/1998 PASS
Resubmittal review started June 8, 1998 and finished June 9, 1998. Drawings approved with conditions as outlined on the plan review report.
Plan resubmittals received  6/5/1998
RECEIVED 2 COPIES OF SHEETS ONE, THREE, AND FOUR. ONE COPY OF REFERENCE LETTER TO THE PLAN REVIEW ANALYSIS DATED 5/21/98. ROUTED TO CARL W.
Routing - FIRE5/22/1998 5/27/1998 FAIL
Routing - PLUMBING5/21/1998 5/21/1998 PASS
See stamp on drawings
Plan Reviewer's activity  5/7/1998
UBC plan review started May 7, 1998 and finished May 21, 1998. A response from the Architect is required. See Conditions list.
Routing - PLUMBING4/30/1998 5/5/1998 FAIL
Routing - PUBLIC WORKS4/28/1998 4/30/1998 PASS
Routing Off Site - C.D.H4/27/1998 4/28/1998 PASS
CALLED LARRY HANSEN TO PICK UP PLANS
Plan routing begun/TENANTS  4/27/1998
Route to CENTRAL DISTRICT HEALTH, PUBLIC WORKS, PLUMBING, PLAN CHECK and FIRE. THIS PLAN IS LACKING MECHANICAL PLANS STAMPED BY A LICENSED ENGINEER. DAVE RADFORD IS TO CALL AND NOTIFY ARCHITECT ON 4/27/98.
Plan assigned to (MYS)4/24/1998 4/27/1998
DetailsMarlene Southard
Recd Pcfee & Taken To Pln CK  4/24/1998 PEND
Application received  4/24/1998
INSP - Final3/3/19993/3/1999 
Routing - PLAN CHECK6/29/1998  
Routing - PLAN CHECK5/5/1998  
Routing - PLAN CHECK5/27/1998  
SUPER- Supervisor's review4/6/1999  
SUPER- Supervisor's review4/6/1999