Permit Information
Permit NumberBLD98-01154
StatusFinaled
Name WENDEL BILHAM
Site Address 6001 CASSIA ST
Project NameBORAH HS AUDITORIUM
Customer Number 
ePlanReviewNo
Description
TO CONSTRUCT A TWO-STORY TYPE IIFR HIGH SCHOOL AUDITORIUM WITH TWO CLASSROOMS AND STORE ROOMS. OTHER WORK INCLUDES ALL SITE IMPROVEMENTS AND LANDSCAPING PER * CUP97-110 PC#259-98 MLO 1348 SQ. FT. 2ND FLOOR WITH 20238 SQ.FT. 1ST FLOOR.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Receive PAYMENT IN FULL  11/18/1999 DONE
BLD-Final9/23/19999/23/19999/23/1999PPASS
DetailsCarl Dependahl
Borah High Auditorium Ok for C/O
Permanent occupancy UNPAID FEE  9/23/1999 PASS
Perm. Occ. Cert. #3898 issued 9-23-99 to Borah High School (auditorium).
FIRE-Final Inspection9/21/19999/22/19999/22/1999APASS
DetailsJoe Tawney
dwayne ###-#### ok for permanent occ.
Permanent Occupancy 9/22/19999/22/1999 DONE
Details
INSP-Final Inspection9/3/19999/7/19999/7/1999APART
DetailsJoe Tawney
9/7 OK on installation of sprinklr heads above stage. jrb REQUEST 9AM. TRACY ###-####
Temporary occupancy  9/3/1999 PASS
Temp. Occ. Cert. #3898 issued 9-3-99 to Borah High School for the auditorium. Temp. Occ. Cert. #3898 issued 9-3-99 to Borah High School for the new auditorium.
INSP-Final Inspection9/1/19999/2/19999/2/1999APART
DetailsJoe Tawney
09/01/99 406 - REINSP OK FOR TEMP OCC FAX OF ALARM SIGNALS
INSP - Final9/1/19999/2/19999/2/1999PPART
DetailsCarl Dependahl
09/02/99 340 - DWAYNE ###-####; ok for t/o, need fire ok
INSP-Conference8/19/19998/19/19998/19/1999 PART
DetailsJoe Tawney
/ / 406 - CONF W/DWAYNE ON FIRE DOORS
INSP - Final8/17/19998/18/19998/18/1999AFAIL
DetailsCarl Dependahl
08/18/99 340 - dwayne ###-#### part fn, c/ handrails, etc
INSP-Final Inspection8/17/19998/18/19998/18/1999PFAIL
DetailsJoe Tawney
08/18/99 406 - REINSP FAIL SPKLR ALARM TEST OK, ALARM SYST NOT COMPLETE
INSP - Final8/16/19998/17/19998/17/1999PNR
DetailsCarl Dependahl
08/17/99 340 - DWAYNE-- ###-#### CELL- PARTIAL FN-
INSP-Final Inspection8/17/19998/17/19998/17/1999
DetailsJoe Tawney
INSP-Conference8/16/19998/16/19998/16/1999 PART
DetailsJoe Tawney
/ / 406 - CONF W/GEORGE EIDEM REG ALARM C/N
INSP-Final Inspection8/12/19998/12/19998/12/1999PFAIL
DetailsJoe Tawney
08/12/99 406 - ALARM TEST FAIL C/N ISSUED
Code Occupancy Approval  8/12/1999 PASS
O.K. - Mike Hall requested letter from School indicating that grass and sprinkler would we incl. in the upcomming proj. (area along the south boundary). Otherwise all is per CUP97-0110 - PASS
INSP - Framing/ Rough-in8/10/19998/10/19998/10/1999 PART
DetailsCarl Dependahl
/ / 340 - REC'D SPEC INSP & ENG'S LETTER: OK
Code Occupancy Approval  8/4/1999
final occupancy requested by Dwayne Hickam ###-####
INSP-Final Inspection7/15/19997/16/19997/16/1999APART
DetailsJoe Tawney
07/16/99 406 - OK ON TEST OF FIRE CURTAIN FOR STAGE
INSP-Conference7/15/19997/15/19997/15/1999 PART
DetailsJoe Tawney
/ / 406 - CONF REG TESTING OF FIRE DOOR
INSP - Framing/ Rough-in6/30/19996/30/19996/30/1999 PART
DetailsCarl Dependahl
/ / 340 - STAGE VENTS BACK ORDERED, CHK AT FINAL
INSP - Framing/Rough-in6/24/19996/25/19996/25/1999APART
DetailsCarl Dependahl
06/25/99 340 - rated ceiling Dwayne ###-####
INSP - Framing/Rough-in6/22/19996/23/19996/23/1999AFAIL
DetailsCarl Dependahl
06/23/99 340 - partial Dwayne ###-####; COMPLETE FIRESTOPS AT RATED LID/
INSP - Framing/ Rough-in6/16/19996/16/19996/16/1999 PART
DetailsCarl Dependahl
/ / 340 - REVIEWED FIRE PROOFING REPORT...NEED CLARIFICATION
INSP - Framing/ Rough-in6/15/19996/15/19996/15/1999 PART
DetailsCarl Dependahl
/ / 340 - CONF. ONLYW/ BLDR. NEED FIRESTOPS AT LOBBY HARD LID
INSP - Framing/Rough-in6/8/19996/9/19996/10/1999AFAIL
DetailsCarl Dependahl
06/09/99 340 - Dwayne ###-####...CLG AT LOBBY; C/N, FIRESTOP, ADD SEISMI
INSP - Framing/Rough-in4/29/19994/29/19994/29/1999PPART
DetailsCarl Dependahl
04/29/99 340 - partial framing/ Dwayne ###-####, front of mezz ok to cov
INSP - Framing/Rough-in4/28/19994/29/19994/28/1999 PART
DetailsCarl Dependahl
/ / 340 - CONF; REVIEWED PART SPEC INSP REPORTS FOR STEEL
INSP - Framing/Rough-in4/26/19994/26/19994/27/1999PPART
DetailsCarl Dependahl
04/26/99 340 - Partial\\###-#### Duwane; LOBBY LID, SOUND PANELS, OK TO
INSP - Framing/Rough-in4/23/19994/23/19994/23/1999 PART
DetailsCarl Dependahl
/ / 340 - SOUND PANELS, ADD CHANNEL AT ENDS, OK TO COVER
INSP - Framing/Rough-in4/22/19994/22/19994/22/1999 PART
DetailsCarl Dependahl
/ / 340 - CONF RE FIRESTOPS AT RATED LIDS
INSP - Framing/Rough-in4/20/19994/21/19994/21/1999PPART
DetailsCarl Dependahl
04/21/99 340 - ###-#### DUANE//PARTIAL FRAMING; ok to rock bathroom lids
INSP - Framing/Rough-in4/16/19994/16/19994/16/1999PPART
DetailsCarl Dependahl
04/16/99 340 - DWAYNE ###-####; acoustic panels(drywall) at auditorium l
INSP - Framing/Rough-in4/13/19994/14/19994/14/1999AFAIL
DetailsCarl Dependahl
04/14/99 340 - ###-#### DWAYNE//PARTIAL FIRE CEILING; vents at restrooms
INSP - Wall cover4/13/19994/13/19994/13/1999 NR
DetailsCarl Dependahl
/ / 340 - CONF ONLY, REVIEWED SPEC INSP REPORTS...FAILED FIREPROOFING
INSP-Final Inspection4/13/19994/13/19994/13/1999PPART
DetailsJoe Tawney
04/13/99 406 - ok above grnd hydro test & rough in exc 3 items
INSP - Framing/Rough-in3/29/19993/29/19993/29/1999 FAIL
DetailsCarl Dependahl
/ / 340 - CONF ONLY, KEEP CN, NEED DETAIL FOR LID PENETRATIONS
Fee Review-notes9/8/1998 3/23/1999
INSP - Framing/Rough-in3/18/19993/19/19993/19/1999AFAIL
DetailsCarl Dependahl
03/19/99 340 - partial framing dwayne ###-#### need cert' for pre fab steel framing...archs detail for ceiling penetrat
INSP - Framing/Rough-in3/10/19993/10/19993/10/1999PFAIL
DetailsCarl Dependahl
03/10/99 340 - DWAYNE 321-*4974 need clarification of clg penetrations; ok to rock 1st layer at auditori
INSP-Final Inspection3/8/19993/9/19993/9/1999APART
DetailsJoe Tawney
03/09/99 406 - OK ON UNDERGROUND HYDRO TEST
INSP-Supply line flush3/9/19993/9/19993/9/1999 PART
DetailsJoe Tawney
/ / 406 - OK ON SUPPLY LINE FLUSH
INSP - Framing/Rough-in3/4/19993/4/19993/4/1999 NR
DetailsCarl Dependahl
03/03/99 340 - rated A occ, need to seal all penetrations, submit spec i
INSP - Framing/Rough-in3/2/19993/3/19993/3/1999PFAIL
DetailsCarl Dependahl
partial ###-#### Duane...rated bldg, seal penetrations, need city plans
INSP - Framing/Rough-in1/11/19991/12/19991/12/1999APART
Details
01/12/99 338 - made ok to cover ext wall at the restrooms in rear of the
INSP - Framing/Rough-in12/29/199812/29/199812/29/1998PPASS
Details
12/29/98 338 - ok to close up music room ceilings
INSP-Conference12/21/1998 12/21/1998 PART
Follow up on a fax from Materials Testingand Inspection of non complying welds at the ends of trusses. AWS D1.1-98 requires that at extreme cold tempuratures (-4 degrees F to +5 degrees F ) pre heating of welds is required. As the welding forman refused to follow the proceedures of same all welds inspected today are unacceptable.. Per Mike Riccardelli "special inspector" I called the general contractor Scott Hedrick to tell him that work will be stopped if this matter is not resolved by tomorrow a.m. He contacted the special inspection agencie and we had a conference call..resulting in the agreement the any welding done today on these trusses must be ground out if they are in the way of the required welding of these members.Any welding other than these tack welds will be done in temperatures acceptable to the AWS D1.1-98..MR HEDRICK IS TO SEND LETTER TO WELDING CONTRACTOR TO THIS AFFECT..Copies are to be cc'd to myself and D. Cramm with Materials Testing and Inspection. I have also left message on the voice mail of Wendall Bigham with the Independent School District of Boise on this matter I am awaiting his returned call. It is now 5:45 p.m.
INSP - Framing/Rough-in12/15/199812/15/199812/16/1998PPART
Details
DWAYNE ###-#### made ok with sp insp approval
INSP - Foundation11/6/199811/9/199811/9/1998PPART
Details
11/09/98 338 - made ok with sp insp approval
INSP - Concrete10/14/199810/15/199810/15/1998APART
Details
10/15/98 338 - made ok to pour with sp insp approval
INSP - Foundation10/12/199810/12/199810/12/1998 PART
Details
/ / 338 - MADE OK WITH SP INSP APPROVAL
INSP - Framing/Rough-in10/9/199810/12/199810/12/1998APART
Details
10/12/98 338 - made k with sp insp approval
INSP - Foundation10/6/199810/6/199810/6/1998PPART
DetailsTom Arcoraci
10/06/98 408 - duane ###-#### rebar and footing part spec on site
INSP - Foundation10/1/199810/1/199810/1/1998PPART
DetailsTom Arcoraci
10/01/98 408 - footing and rebar dwayne ###-#### special insp on site
INSP - Framing/Rough-in9/28/19989/29/19989/29/1998APART
Details
09/29/98 338 - DWAYNE ###-#### STEM WALL AND REBAR MADE OKWITH SP ISP APPROVAL
SUPER- Supervisor's review9/30/19989/28/19989/29/1998
this was called in as a framing inspection and actually is rebar in a stemwall. I will add to info for clerks.
INSP - Framing/Rough-in9/22/19989/23/19989/23/1998PPART
Details
09/23/98 338 - made ok with sp insp approval
INSP - Foundation9/21/19989/22/19989/22/1998APART
Details
09/22/98 338 - made ok with sp insp approval
INSP - Foundation9/15/19989/16/19989/16/1998APART
Details
09/17/98 338 - made ok to pour with the sp insp approval
INSP - Foundation9/14/19989/15/19989/14/1998APART
Details
09/15/98 338 - made ok with sp insp approval
INSP - Concrete9/9/19989/10/19989/10/1998APART
Details
09/10/98 338 - made ok with sp insp approval
INSP - Foundation9/8/19989/8/19989/8/1998PPART
Details
09/08/98 338 - MADE OK WITH SP INSP APPROVAL
INSP - Foundation9/2/19989/3/19989/3/1998APART
Details
09/03/98 338 - made ok with sp insp approval
INSP - Foundation9/2/19989/2/19989/2/1998PPART
Details
09/02/98 338 - rebar footing/ ###-#### made ok for the south footing wal
(F) Reprint permit  7/31/1998
Issue PAID IN FULL permit  7/30/1998
Telephone call  7/29/1998 PASS
SPOKE WITH SCOTT HANSEN SAID THAT HE WOULD COME DOWN TODAY AND PICK IT UP!
Print Occupancy Form  7/21/1998
Inspection Record Card- Bld  7/21/1998
Inspection Record Card- Bld  7/21/1998
Telephone call  7/21/1998 PASS
TALKED TO SCOTT HANSEN AT ###-#### TO VERIFY PLANS ARE READY. TOLD HIM TO BRING IN ACHD APPROVAL 1ST
PLANS/APPL TAKEN TO FRONT DESK  7/21/1998 PASS
Plan assigned to (MLO)5/4/1998 7/20/1998 PASS
DetailsMike Otto
Routing - FIRE7/14/1998 7/17/1998 PASS
approved per changes as noted on s henson letter of 6/22/98
Routing - PLAN CHECK7/9/1998 7/13/1998 PASS
Plan resubmittals received  7/10/1998 PEND
RECEIVED RESUBMITTALS FROM LOMBARD CONRAD, FORWARDED BOTH COPIES TO MIKE OTTO.
Plan Review Completed(1st rev)  6/11/1998 FAIL
UBC and UFC issues, delayed 4 days in fire
Routing - FIRE5/27/1998 6/11/1998 FAIL
door hardware, sprinkler issues
Routing Off Site - STRUCTURAL5/4/1998 6/11/1998 PASS
Plan resubmittals requested  5/27/1998 FAIL
CORRECTIONS MAILED AND FAXED TO ARCHITECT.
Routing - PLAN CHECK5/13/1998 5/26/1998 FAIL
Routing - PLANNING5/6/1998 5/13/1998 PASS
Plans held for 2-3 work days by planning pending receipt of revised site/landscape plan to satisfy condition 3 per CUP97-110.
Routing - PLUMBING5/6/1998 5/6/1998 PASS
Routing - PUBLIC WORKS5/4/1998 5/6/1998 PASS
Plan assigned to (MYS)4/27/1998 5/4/1998
DetailsMarlene Southard
Recd Pcfee & Taken To Pln CK  4/27/1998 PEND
Application received  4/27/1998