Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD98-01168
StatusFinaled
Name BSU FOUNDATION
Site Address 1020 S MANITOU AVE
Project NameBSU ENGINEERING BLDG
Customer Number 
ePlanReviewNo
Description
CONSTRUCT A NEW 64,000 SQUARE FOOT, FOUR STORY TYPE II-1HR CLASSROOM BUILDING WITH A 5,043 SQ. FT. MECHANICAL PENTHOUSE AND TWO PEDESTRIAN WALK-WAYS ON THE SECOND AND THIRD FLOOR WHICH CONNECT TO AN EXISTING STRUCTURE. THE FIRST FLOOR WILL HAVE 15,848 SQ. FT. WITH 12,151 SQ. FT UNFINISHED FOR FUTURE CLASSROOMS. THE SECOND FLOOR WILL HAVE 15,744 SQ FT, THE THIRD FLOOR WILL HAVE 15,735 SQ. FT. AND THE FOURTH FLOOR WILL HAVE 15,719 SQ. FT. THE BUILDING IS FIRE SPRINKLERED THROUGH-OUT AND SPRINKLERS ARE USED FOR SUBSTITUTION OF ONE-HOUR CONSTRUCTION. OTHER WORK INCLUDES SITE GRADING, PAVING, LANDSCAPING AND ALL OTHER SITE IMPROVEMENTS PER PC98-260, CUP 98-0029. PC#260-98 MLO
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Pending Permit.LaserJet4  3/12/2002  
CHANGE STATUS TO (ISS)  9/20/2000 DONE
(F) Reprint permit  7/14/2000 DONE
Fee Review-notes11/2/1998 3/15/2000 DONE
Permanent Occupancy 3/8/20003/8/2000 DONE
Details
Permanent occupancy  3/8/2000 DONE
Perm. Occ. Cert. #8156 issued 3-8-00 to the B.S.U. Engineering Bldg.
BLD-Final12/22/199912/23/199912/23/1999PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/22/1999 at 14:05:35. Contact: ###-####. Temp. ok Rm. #226 doors as per plan need Ada & occ load signage.
Temporary occupancy  12/23/1999 DONE
Temp. Occ. Cert. #3961 issued 12-23-99 to the BSU Engineering Bldg.
BLD-Final12/16/199912/17/199912/17/1999AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/16/1999 at 08:27:48. Contact: ###-####. C/N.
FIRE-Final Inspection12/13/199912/14/199912/14/1999PFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/13/1999 at 11:49:30. Contact: ###-####. Alarm test- need connection for reporting; test AHU shut-off.
FIRE-Hydro test above ground11/22/199911/23/199911/23/1999PNR
DetailsRick Jackson
Scheduled by a contractor via Hello! on 11/22/1999 at 14:06:15. Contact: ###-####. FDC not ready to hydro.
FIRE-Supply Line Hydro11/22/199911/23/199911/23/1999PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 11/22/1999 at 14:07:38. Contact: ###-####. Supply hydro ok.
Code Occupancy Approval  11/23/1999 PASS
ALL CONDITIONS OF CUP98-0029 HAVE BEEN MET, FINAL OCCUPANCY SIGNED OFF.
FIRE-Sprinkler Rough-in11/18/199911/18/199911/18/1999PPART
DetailsRick Jackson
Tested fire pump and fire pump controller; flow test passed; controller not monitored.
FIRE-Hydro test above ground11/4/199911/5/199911/5/1999PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 11/04/1999 at 13:02:56. Contact: ###-####. Hydro okay on all floors.
FIRE-Conference11/1/199911/2/199911/2/1999APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 11/01/1999 at 16:01:48. Contact: ###-####. With simplea and contractor to review fire alarm plans.
BLD-Framing/Rough-in10/18/199910/19/199910/20/1999PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/18/1999 at 15:53:19. Contact: ###-####. Ceiling 1st floor ok for cover
FIRE-Supply Line Flush10/12/199910/13/199910/13/1999APASS
DetailsRick Jackson
forest ###-#### Underground flush ok
FIRE-Supply Line Flush10/13/199910/13/199910/13/1999APASS
DetailsRick Jackson
met with sprinkler designer and Bill Alexander- sprinklers will also bo installed above duct in North Corridor- sprinklers will not be installed above duct in East corridor- (Below duct only)
FIRE-Conference10/1/199910/4/199910/4/1999AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 10/01/1999 at 16:34:46. Contact: ###-####. Need alarm plans
BLD-Conference10/4/199910/4/199910/4/1999PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 10/04/1999 at 10:27:40. Contact: ###-####. Ok to install ceiling grid in portion of 4th floor
FIRE-Sprinkler Rough-in9/29/199910/1/199910/1/1999AFAIL
DetailsRick Jackson
4TH FLOOR-- FORREST- ###-#### R/I 4th floor corridor: not installed within 22" of deck; okay to cover gridded ceiling areas
BLD-Framing/Rough-in9/23/19999/24/19999/24/1999AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/23/1999 at 10:30:40. Contact: ###-####. 3-2 floor ceiling ok five stop and glass block wall c/n
FIRE-Sprinkler Rough-in9/22/19999/23/19999/24/1999PFAIL
DetailsRick Jackson
forest ###-#### Okay to cover 2nd & 3rd floor classrooms and labs; Corridors require heads within 22" of deck
INSP - Framing/Rough-in7/8/19997/8/19997/8/1999 PART
DetailsJim Storey
07/07/99 301 - penthouse ok for cover
INSP - Framing/Rough-in5/18/19995/20/19995/20/1999APART
DetailsJim Storey
05/20/99 301 - 2 nd floor in progess ok to rock corador walls
INSP-Conference4/22/19994/22/19994/22/1999APART
DetailsRick Jackson
issued c/n for the installation of the temp standpipe - gave deadline of 4/29 or stop work above 3rd floor
INSP-Conference3/8/19993/8/19993/8/1999PPART
DetailsRick Jackson
with gen. and 301 - reviewed plans and walk through of site
Plan resubmittals received  12/15/1998
RECEIVED 5 COPIES OF REVISED STORMWATER PLANS AND ONE COPY OF REVISED STORMWATER CALCS. ROUTED TO BRIAN M. HE WILL GO OVER THEN GIVE TO PW INSPECTORS. KMM
(F) Reprint permit  8/26/1998
Issue PAID IN FULL permit  8/25/1998
Plan Reviewer's activity  8/21/1998 PASS
RECEIVED LETTER FORM KEITH JONES OF ATTWOOD-HINZJMAN-JONES APPROVING THE SEEPAGE PITS LOCATED 2 AND 5 FEET FORM THE FOUNDATION ON THE WEST SIDE. MLO
Print Occupancy Form  8/21/1998
Inspection Record Card- Bld  8/21/1998
PLANS/APPL TAKEN TO FRONT DESK  8/21/1998 PASS
Plan assigned to (MLO)5/12/1998 8/21/1998 PASS
DetailsMike Otto
Plan Reviewer's activity  8/18/1998 PEND
REFAXED SOILS REPORT TO KEITH JONES FOR REVIEW OF ROOF DRAINAGE SEEPAGE BED WITHIN 2 FEET OF FOUNDATION.
Routing - PUBLIC WORKS8/11/1998 8/12/1998 PASS
Application received  8/11/1998
Routing - PLUMBING8/10/1998 8/10/1998 PASS
Routing - FIRE8/7/1998 8/10/1998 PASS
delayed submittal allowed on standpipe corrections to 8/3/98 submittal
Plan resubmittals received  8/7/1998 PEND
REVISED SITE PLANS RECEIVED MLO
Routing - PLAN CHECK8/4/1998 8/6/1998 PASS
Meeting  8/6/1998 PEND
MEET WITH ARCHITECT AND HAD CORRECTIONS REDLINED AND SIGNED BY ARCHITECT ON BOTH SETS OF PLANS. MLO
Plan resubmittals requested  8/6/1998 PEND
REQUESTED ARCHITECT TO PROVIDE TWO COPIES OF THE REVISED SITE PLAN. MLO
Meeting  8/5/1998 PEND
MET WITH JERRY LOWE REGARDING INCOMPLETE CORRECTIONS RECEIVED 8-4-98. MLO.
Plan resubmittals received  8/4/1998 PEND
RECEIVED PLAN RESUBMITTALS FROM CSHQA, FORWARDED SAME TO MIKE OTTO
Routing - PLUMBING7/28/1998 7/31/1998 FAIL
HAS NOT RECEIVED RESUBS YET
Plan resubmittals received  7/31/1998
RECEIVED 3 COPIES OF REVISED SHEET ES6.1 3 COPIES OF RESPONSE TO PLAN CHECK ROUTED TO MIKE O. RESPONSE TO THREE ITEMS FROM STRUCTURAL REVIEW OF 7-16-98. MLO
Routing - FIRE7/13/1998 7/27/1998 FAIL
fire separations not complete. need standpipes
Plan Review Completed(1st rev)  7/27/1998 FAIL
UFC, UBC, PW fails
90 day tracking............. 4/27/19987/26/1998 PEND
Routing Off Site - STRUCTURAL7/7/1998 7/16/1998 PASS
RESUBS SENT TO ATWOOD HINZMAN AND JONES VIA PDQ 7-15-98 COPY OF STRUCTURAL PLAN BACK CHECK REVIEW COMMENTS FROM ATWOOD HINZMAN JONES. ROUTED TO MIKE O. AND PUT ONE COPY IN FILE. 7-16-98 RECEIVED ONE SET OF BOISE STATE UNIVERSITY ENG./TECH. BUILDING PLANS AND STRUCTURAL PLAN BACK CHECK REVIEW COMMENTS. ROUTED TO MIKE O. COMMENTS FORWARDED YO ARCHITECT 7-16-98 MLO.
Meeting  7/15/1998 PEND
MET WITH TWO ARCHITECTS AND FOUR MECHANCIAL ENGINEERS FROM CSHQA REGARDING PLAN REVIEW COMMENTS. MLO
Routing - PLAN CHECK7/6/1998 7/13/1998 FAIL
Plan resubmittals requested  7/13/1998 FAIL
CORRECTIONS MAILED AND FAXED TO ARCHITECT. MLO
Plan resubmittals received  7/6/1998 PEND
RECEIVED RESUBMITALS AT 5PM 7/2/98 LOGGED RESUBS IN AT 0800 AM 7/6/98, FORWARDED SAME TO MIKE OTTO
Meeting  7/1/1998 PEND
HAD MEETING WITH HEADS OF CIVIL AND MECHANCIAL ENGINEERING DEPTS. OF BSU TO DISCUSS OPERATIONS IN THE TWO NEW ENGINEERING BUILDINGS AT BSU.
Telephone call  6/25/1998 PEND
PUT CALL INTO GEORGE MURGEL, BSU ENGINEERING DEPT. TO SET-UP MEETING WITH PLAN CHECK AND FIRE TO REVIEW USES WIHTIN LAB SPACES.MLO
Plan resubmittals received  6/11/1998
RECEIVED TWO COPIES OF SHEETS EA2.2, EA2.3, AND EA2.4. RECEIVED ONE COPY OF MEMO FROM JERRY LOWE. ROUTED TO MIKE O.
Plan resubmittals received  6/11/1998 PEND
RECEIVED RESUBS FROM CSHQA, FORWARDED SAME TO MIKE OTTO.
Plan resubmittals requested  6/10/1998 FAIL
CORRECTIONS SENT TO ARCHITECT REGARDING HAZMAT IN BUILDING AND USES IN ROOMS AS NOT DEFINED ON PLANS. CHEMICAL INFORMATION PROVIDED IS INSUFFICIENT FOR REVIEW.
Routing - PLAN CHECK6/3/1998 6/10/1998 FAIL
Routing - PLUMBING5/28/1998 6/3/1998 FAIL
Routing - PUBLIC WORKS5/14/1998 5/28/1998 FAIL
NEEDS DRAINAGE PLAN REVISIONS AND EASEMENTS.
Routing Off Site - STRUCTURAL5/11/1998 5/26/1998 FAIL
SENT TO ATWOOD, HINZMAN, JONES. DAR
Routing - PLANNING5/12/1998 5/13/1998 PASS
CUP98-0029
Plans ACCEPTED BY PLAN CHECK  5/11/1998 PEND
Recd Pcfee & Taken To Pln CK  4/27/1998
Application received  4/27/1998
Application received