Print Pending Permit.LaserJet4 | | | 3/12/2002 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/20/2000 | | DONE |
|
|
|
|
(F) Reprint permit | | | 7/14/2000 | | DONE |
|
|
|
|
Fee Review-notes | 11/2/1998 | | 3/15/2000 | | DONE |
|
|
|
|
Permanent Occupancy | | 3/8/2000 | 3/8/2000 | | DONE |
|
|
|
|
Permanent occupancy | | | 3/8/2000 | | DONE |
|
|
|
Perm. Occ. Cert. #8156 issued 3-8-00 to the B.S.U. Engineering Bldg.
|
BLD-Final | 12/22/1999 | 12/23/1999 | 12/23/1999 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/22/1999 at 14:05:35. Contact: ###-####. Temp. ok Rm. #226 doors as per plan need Ada & occ load signage.
|
Temporary occupancy | | | 12/23/1999 | | DONE |
|
|
|
Temp. Occ. Cert. #3961 issued 12-23-99 to the BSU Engineering Bldg.
|
BLD-Final | 12/16/1999 | 12/17/1999 | 12/17/1999 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/16/1999 at 08:27:48. Contact: ###-####. C/N.
|
FIRE-Final Inspection | 12/13/1999 | 12/14/1999 | 12/14/1999 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/13/1999 at 11:49:30. Contact: ###-####. Alarm test- need connection for reporting; test AHU shut-off.
|
FIRE-Hydro test above ground | 11/22/1999 | 11/23/1999 | 11/23/1999 | P | NR |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 11/22/1999 at 14:06:15. Contact: ###-####. FDC not ready to hydro.
|
FIRE-Supply Line Hydro | 11/22/1999 | 11/23/1999 | 11/23/1999 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 11/22/1999 at 14:07:38. Contact: ###-####. Supply hydro ok.
|
Code Occupancy Approval | | | 11/23/1999 | | PASS |
|
|
|
ALL CONDITIONS OF CUP98-0029 HAVE BEEN MET, FINAL OCCUPANCY SIGNED OFF.
|
FIRE-Sprinkler Rough-in | 11/18/1999 | 11/18/1999 | 11/18/1999 | P | PART |
Rick Jackson
|
|
|
Tested fire pump and fire pump controller; flow test passed; controller not monitored.
|
FIRE-Hydro test above ground | 11/4/1999 | 11/5/1999 | 11/5/1999 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 11/04/1999 at 13:02:56. Contact: ###-####. Hydro okay on all floors.
|
FIRE-Conference | 11/1/1999 | 11/2/1999 | 11/2/1999 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 11/01/1999 at 16:01:48. Contact: ###-####. With simplea and contractor to review fire alarm plans.
|
BLD-Framing/Rough-in | 10/18/1999 | 10/19/1999 | 10/20/1999 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/18/1999 at 15:53:19. Contact: ###-####. Ceiling 1st floor ok for cover
|
FIRE-Supply Line Flush | 10/12/1999 | 10/13/1999 | 10/13/1999 | A | PASS |
Rick Jackson
|
|
|
forest ###-#### Underground flush ok
|
FIRE-Supply Line Flush | 10/13/1999 | 10/13/1999 | 10/13/1999 | A | PASS |
Rick Jackson
|
|
|
met with sprinkler designer and Bill Alexander- sprinklers will also bo installed above duct in North Corridor- sprinklers will not be installed above duct in East corridor- (Below duct only)
|
FIRE-Conference | 10/1/1999 | 10/4/1999 | 10/4/1999 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/01/1999 at 16:34:46. Contact: ###-####. Need alarm plans
|
BLD-Conference | 10/4/1999 | 10/4/1999 | 10/4/1999 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 10/04/1999 at 10:27:40. Contact: ###-####. Ok to install ceiling grid in portion of 4th floor
|
FIRE-Sprinkler Rough-in | 9/29/1999 | 10/1/1999 | 10/1/1999 | A | FAIL |
Rick Jackson
|
|
|
4TH FLOOR-- FORREST- ###-#### R/I 4th floor corridor: not installed within 22" of deck; okay to cover gridded ceiling areas
|
BLD-Framing/Rough-in | 9/23/1999 | 9/24/1999 | 9/24/1999 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/23/1999 at 10:30:40. Contact: ###-####. 3-2 floor ceiling ok five stop and glass block wall c/n
|
FIRE-Sprinkler Rough-in | 9/22/1999 | 9/23/1999 | 9/24/1999 | P | FAIL |
Rick Jackson
|
|
|
forest ###-#### Okay to cover 2nd & 3rd floor classrooms and labs; Corridors require heads within 22" of deck
|
INSP - Framing/Rough-in | 7/8/1999 | 7/8/1999 | 7/8/1999 | | PART |
Jim Storey
|
|
|
07/07/99 301 - penthouse ok for cover
|
INSP - Framing/Rough-in | 5/18/1999 | 5/20/1999 | 5/20/1999 | A | PART |
Jim Storey
|
|
|
05/20/99 301 - 2 nd floor in progess ok to rock corador walls
|
INSP-Conference | 4/22/1999 | 4/22/1999 | 4/22/1999 | A | PART |
Rick Jackson
|
|
|
issued c/n for the installation of the temp standpipe - gave deadline of 4/29 or stop work above 3rd floor
|
INSP-Conference | 3/8/1999 | 3/8/1999 | 3/8/1999 | P | PART |
Rick Jackson
|
|
|
with gen. and 301 - reviewed plans and walk through of site
|
Plan resubmittals received | | | 12/15/1998 | | |
|
|
|
RECEIVED 5 COPIES OF REVISED STORMWATER PLANS AND ONE COPY OF REVISED STORMWATER CALCS. ROUTED TO BRIAN M. HE WILL GO OVER THEN GIVE TO PW INSPECTORS. KMM
|
(F) Reprint permit | | | 8/26/1998 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/25/1998 | | |
|
|
|
|
Plan Reviewer's activity | | | 8/21/1998 | | PASS |
|
|
|
RECEIVED LETTER FORM KEITH JONES OF ATTWOOD-HINZJMAN-JONES APPROVING THE SEEPAGE PITS LOCATED 2 AND 5 FEET FORM THE FOUNDATION ON THE WEST SIDE. MLO
|
Print Occupancy Form | | | 8/21/1998 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/21/1998 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/21/1998 | | PASS |
|
|
|
|
Plan assigned to (MLO) | 5/12/1998 | | 8/21/1998 | | PASS |
Mike Otto
|
|
|
|
Plan Reviewer's activity | | | 8/18/1998 | | PEND |
|
|
|
REFAXED SOILS REPORT TO KEITH JONES FOR REVIEW OF ROOF DRAINAGE SEEPAGE BED WITHIN 2 FEET OF FOUNDATION.
|
Routing - PUBLIC WORKS | 8/11/1998 | | 8/12/1998 | | PASS |
|
|
|
|
Application received | | | 8/11/1998 | | |
|
|
|
|
Routing - PLUMBING | 8/10/1998 | | 8/10/1998 | | PASS |
|
|
|
|
Routing - FIRE | 8/7/1998 | | 8/10/1998 | | PASS |
|
|
|
delayed submittal allowed on standpipe corrections to 8/3/98 submittal
|
Plan resubmittals received | | | 8/7/1998 | | PEND |
|
|
|
REVISED SITE PLANS RECEIVED MLO
|
Routing - PLAN CHECK | 8/4/1998 | | 8/6/1998 | | PASS |
|
|
|
|
Meeting | | | 8/6/1998 | | PEND |
|
|
|
MEET WITH ARCHITECT AND HAD CORRECTIONS REDLINED AND SIGNED BY ARCHITECT ON BOTH SETS OF PLANS. MLO
|
Plan resubmittals requested | | | 8/6/1998 | | PEND |
|
|
|
REQUESTED ARCHITECT TO PROVIDE TWO COPIES OF THE REVISED SITE PLAN. MLO
|
Meeting | | | 8/5/1998 | | PEND |
|
|
|
MET WITH JERRY LOWE REGARDING INCOMPLETE CORRECTIONS RECEIVED 8-4-98. MLO.
|
Plan resubmittals received | | | 8/4/1998 | | PEND |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM CSHQA, FORWARDED SAME TO MIKE OTTO
|
Routing - PLUMBING | 7/28/1998 | | 7/31/1998 | | FAIL |
|
|
|
HAS NOT RECEIVED RESUBS YET
|
Plan resubmittals received | | | 7/31/1998 | | |
|
|
|
RECEIVED 3 COPIES OF REVISED SHEET ES6.1 3 COPIES OF RESPONSE TO PLAN CHECK ROUTED TO MIKE O. RESPONSE TO THREE ITEMS FROM STRUCTURAL REVIEW OF 7-16-98. MLO
|
Routing - FIRE | 7/13/1998 | | 7/27/1998 | | FAIL |
|
|
|
fire separations not complete. need standpipes
|
Plan Review Completed(1st rev) | | | 7/27/1998 | | FAIL |
|
|
|
UFC, UBC, PW fails
|
90 day tracking............. | | 4/27/1998 | 7/26/1998 | | PEND |
|
|
|
|
Routing Off Site - STRUCTURAL | 7/7/1998 | | 7/16/1998 | | PASS |
|
|
|
RESUBS SENT TO ATWOOD HINZMAN AND JONES VIA PDQ 7-15-98 COPY OF STRUCTURAL PLAN BACK CHECK REVIEW COMMENTS FROM ATWOOD HINZMAN JONES. ROUTED TO MIKE O. AND PUT ONE COPY IN FILE. 7-16-98 RECEIVED ONE SET OF BOISE STATE UNIVERSITY ENG./TECH. BUILDING PLANS AND STRUCTURAL PLAN BACK CHECK REVIEW COMMENTS. ROUTED TO MIKE O. COMMENTS FORWARDED YO ARCHITECT 7-16-98 MLO.
|
Meeting | | | 7/15/1998 | | PEND |
|
|
|
MET WITH TWO ARCHITECTS AND FOUR MECHANCIAL ENGINEERS FROM CSHQA REGARDING PLAN REVIEW COMMENTS. MLO
|
Routing - PLAN CHECK | 7/6/1998 | | 7/13/1998 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 7/13/1998 | | FAIL |
|
|
|
CORRECTIONS MAILED AND FAXED TO ARCHITECT. MLO
|
Plan resubmittals received | | | 7/6/1998 | | PEND |
|
|
|
RECEIVED RESUBMITALS AT 5PM 7/2/98 LOGGED RESUBS IN AT 0800 AM 7/6/98, FORWARDED SAME TO MIKE OTTO
|
Meeting | | | 7/1/1998 | | PEND |
|
|
|
HAD MEETING WITH HEADS OF CIVIL AND MECHANCIAL ENGINEERING DEPTS. OF BSU TO DISCUSS OPERATIONS IN THE TWO NEW ENGINEERING BUILDINGS AT BSU.
|
Telephone call | | | 6/25/1998 | | PEND |
|
|
|
PUT CALL INTO GEORGE MURGEL, BSU ENGINEERING DEPT. TO SET-UP MEETING WITH PLAN CHECK AND FIRE TO REVIEW USES WIHTIN LAB SPACES.MLO
|
Plan resubmittals received | | | 6/11/1998 | | |
|
|
|
RECEIVED TWO COPIES OF SHEETS EA2.2, EA2.3, AND EA2.4. RECEIVED ONE COPY OF MEMO FROM JERRY LOWE. ROUTED TO MIKE O.
|
Plan resubmittals received | | | 6/11/1998 | | PEND |
|
|
|
RECEIVED RESUBS FROM CSHQA, FORWARDED SAME TO MIKE OTTO.
|
Plan resubmittals requested | | | 6/10/1998 | | FAIL |
|
|
|
CORRECTIONS SENT TO ARCHITECT REGARDING HAZMAT IN BUILDING AND USES IN ROOMS AS NOT DEFINED ON PLANS. CHEMICAL INFORMATION PROVIDED IS INSUFFICIENT FOR REVIEW.
|
Routing - PLAN CHECK | 6/3/1998 | | 6/10/1998 | | FAIL |
|
|
|
|
Routing - PLUMBING | 5/28/1998 | | 6/3/1998 | | FAIL |
|
|
|
|
Routing - PUBLIC WORKS | 5/14/1998 | | 5/28/1998 | | FAIL |
|
|
|
NEEDS DRAINAGE PLAN REVISIONS AND EASEMENTS.
|
Routing Off Site - STRUCTURAL | 5/11/1998 | | 5/26/1998 | | FAIL |
|
|
|
SENT TO ATWOOD, HINZMAN, JONES. DAR
|
Routing - PLANNING | 5/12/1998 | | 5/13/1998 | | PASS |
|
|
|
CUP98-0029
|
Plans ACCEPTED BY PLAN CHECK | | | 5/11/1998 | | PEND |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/27/1998 | | |
|
|
|
|
Application received | | | 4/27/1998 | | |
|
|
|
|
Application received | | | | | |
|
|
|
|