Permit Information
Permit NumberBLD98-01169
StatusExpired
Name DOYLE CLEMENTS
Site Address 5100 W OVERLAND RD
Project NameALBERTSONS 162
Customer Number 
ePlanReviewNo
Description
ALBERTSON'S INC STORE # 162 * TO REMODEL EXSISTING ALBERTSON'S AND CONSTRUCT A 10,746 SQ. FT. ADDITION.AND MODIFY STORE INTORIOR PER PLANS. THIS PERMIT DOES NOT INCLUDE REFRIGERATION;THEREFORE A SEPRATE BUILDING PERMIT WILL BE REQUIRED FOR REFRIGERATION. This building is an unlimited area building. Sixty foot yard setbacks must be maintained, all areas must be protected by a fire sprinkler system and no added area that is not Group M Occupancy is permitted. DR75-87, PC#261-98 ADS
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  4/9/2015 DONE
Receive PAYMENT IN FULL  12/23/1999 DONE
Telephone call  11/10/1999 DONE
sundance office called and they are sending payment lh
(F) Reprint permit  9/16/1999 DONE
Permanent Occupancy 9/3/19999/3/1999 DONE
Details
INSP - Final9/2/19999/3/19999/3/1999APASS
DetailsCarl Dependahl
09/03/99 340 - terry- ###-#### fn occ insp
INSP - Final8/25/19998/26/19998/26/1999AFAIL
DetailsCarl Dependahl
08/26/99 340 - terry ###-####; c/n, spec insp & eng's letter; shaft, etc
INSP - Framing/Rough-in8/16/19998/16/19998/16/1999PFAIL
DetailsCarl Dependahl
08/16/99 340 - conf w/ contractor; will review previous actions. rec'd a
Code Occupancy Approval  8/12/1999 PASS
Meets compliance with DR - PASS (CAM)
INSP - Final7/22/19997/22/19997/22/1999 PASS
DetailsJoe Tawney
/ / 406 - REINSP OK FOR CERT OF COMPLETION
INSP-Final Inspection6/10/19996/14/19996/14/1999AFAIL
DetailsJoe Tawney
06/14/99 406 - REINSP FAIL NFPA 72 FORM
INSP-Final Inspection5/24/19995/25/19995/25/1999PFAIL
DetailsJoe Tawney
05/25/99 406 - REINSP FAIL ADDRESS, FIRE DOORS, EMERG LIGHTS, REFR PIPIN
INSP-Final Inspection5/7/19995/10/19995/10/1999PCANC
DetailsJoe Tawney
05/10/99 406 - CANCELLED TO BE RESCHED
INSP-Sprinkler Rough-in/Hydro2/3/19992/3/19992/3/1999 FAIL
DetailsJoe Tawney
/ / 406 - rough in of ext canopy FAIL PROVIDE PROTECTION IN CONCEALED
INSP-Final Inspection12/4/199812/7/199812/7/1998APART
DetailsJoe Tawney
12/07/98 406 - JOHN ###-#### SCHEDULED W/JOE AT 10:30 ALARM SYSTM TEST OK ON TEST
INSP-Final Inspection12/2/199812/3/199812/4/1998PFAIL
DetailsJoe Tawney
12/03/98 406 - Scheduled by Hello!. SPKLR ROUGH IN FAIL BAKERY FINAL FAIL SPKLR SYSTEM NOT YET TESTED SUPRV
INSP - Wall cover12/2/199812/3/199812/3/1998PPART
Details
12/02/98 338 - madeok
INSP-Supply line flush11/10/199811/10/199811/10/1998 NR
DetailsJoe Tawney
/ / 406 - SUPPLY LINE FLUSH NOT READY TO BE WITNESSED BY JOHN ANDERSON
INSP-Conference10/20/199810/20/199810/20/1998 PART
DetailsJoe Tawney
/ / 406 - CONF WITH JOHN ANDERSON & STAN BUESS ABOUT SHUTTING DOWM SPK
INSP - Framing/Rough-in10/8/199810/8/199810/8/1998PPART
Details
10/08/98 338 - made ok to start cover at the front entry soffit
INSP-Conference9/9/19989/10/19989/10/1998APART
DetailsJoe Tawney
09/10/98 406 - JOHN ANDERSON ###-####-JOHN WILL CALL CONF ON EXITING DURING CONSTR WITH JOHN ANDERSON. NEED ARCH TO CLARIFY P
INSP - Foundation8/31/19988/31/19988/31/1998PPART
Details
08/31/98 338 - R-BAR PLACED OK TO POUR WITH SPP INSP APPROVAL
Issue PAID IN FULL permit  8/18/1998
Print Occupancy Form  8/13/1998
Inspection Record Card- Bld  8/13/1998
Plan assigned to (ADS)5/4/1998 8/4/1998 PASS
Details
Routing - PLAN CHECK7/30/1998 8/4/1998 PASS
PLANS/APPL TAKEN TO FRONT DESK  8/4/1998 PASS
Plan resubmittals received  8/4/1998
RECEIVED2 COPIES OF ADDENDUM NO. 2 ROUTED TO ARLAN
Plan resubmittals received  7/31/1998 PEND
RECEIVED RESUBMITTALS ON 8 1/2" BY 11 PAPER FORWARDED SAME TO ARLAN. ADVISED ARLAN THAT NORMALY WE ACCEPTED ON FULL SIZE CHANGE SHEETS. DAR
Routing - FIRE7/27/1998 7/29/1998 PASS
approved with corrections to sprinkler riser required.
90 day tracking............. 4/27/19987/26/1998 PEND
Routing - PLANNING7/24/1998 7/24/1998 PASS
x-ref. DRH98-0115
Routing - PLUMBING7/17/1998 7/20/1998 PASS
Plan resubmittals received  7/15/1998 PEND
RECEIVED RESUBS FROM PETERSEN STAGGS, FORWARDED SAME TO ARLAN SMITH
Routing - FIRE5/20/1998 6/1/1998 FAIL
Corrections required on phasing of sprinklers and exits,info needed on refer systems/machinery room.
Plan Review Completed(1st rev)  6/1/1998 FAIL
Not all agencies approved
Routing - PLAN CHECK5/18/1998 5/20/1998 FAIL
Initial plan review report faxed to achitect.
Plan resubmittals requested  5/20/1998 FAIL
Initial plan review report faxed to architect.
Routing - PLUMBING5/13/1998 5/18/1998 FAIL
Routing - PLANNING5/12/1998 5/13/1998 FAIL
The applicant still needs to submit a design review application.
Routing - PUBLIC WORKS5/8/1998 5/12/1998 PASS
Routing Off Site - C.D.H5/4/1998 5/8/1998 PASS
Plan assigned to (MYS)4/27/1998 5/4/1998
DetailsMarlene Southard
Plans ACCEPTED BY PLAN CHECK  5/4/1998 PEND
RECEIVED 3 SETS OF PLANS AND SPECS. SHEET 1.2 NOT SIGNED. CALLED TIM STAGGS
Recd Pcfee & Taken To Pln CK  4/27/1998 PEND
Application received  4/27/1998
Fee Review-notes9/10/1998 3/23/1998