Letter of compliance | | | 6/4/1998 | | PASS |
|
|
|
Letter of Compliance #15063 issued 6-4-98. (Occ. Certs. not issued to this type of facility as per Bob A.)
|
INSP - Final | 6/2/1998 | 6/3/1998 | 6/3/1998 | P | PASS |
Jim Sly
|
|
|
06/03/98 316 - OK for final OCC.
|
Print Occupancy Form | | | 5/15/1998 | | |
|
|
|
|
INSP - Conference | 4/29/1998 | 4/29/1998 | 4/29/1998 | | PASS |
Jim Sly
|
|
|
/ / 316 - Conf with super about req of job and inspections...
|
Plan assigned to (DRS) | 4/24/1998 | | 4/28/1998 | | PASS |
Dan Stuart
|
|
|
04/28/98 16:03:02 DRS - this action updated by action script from <<>> in Case No. BLD98-1171
|
Routing - PLAN CHECK | 4/28/1998 | | 4/28/1998 | | PASS |
|
|
|
Received app., C of V and reviewed questions on 1-hour wall with parapet (existing per contractor) at East pty line; truss details; nailing of plywood; bracing per engineer; connections per engineering or per 1992 structural notes (copy attached to plan) & final inspection and review by engineer.
|
Plan Reviewer's activity | | | 4/28/1998 | | |
|
|
|
Reviewed project with Marty Santoyo, P&Z, to see if any questions on issuing a permit to rebuild to match previous existing roof. Marty said no problem.
|
Telephone call | | | 4/28/1998 | | |
|
|
|
Call from Dave Jakovack of FDJ Engineering & Construction concerning his review of the existing facility and what I needed in the way of a report. I said I needed his evaluation of the structure in relation to ability to carry loads that would be imposed by the rebuild and what needed to be replaced or manner of repair to structural beams, walls and connections thereto to compensate for the fire damage. He asked me concerning seismic loading and that he had not received the truss design yet for his review. I told him I had copies of the pre-engineered truss and the description provided by the contractor, Kenny Kuehl, of the replacement materials and that I could fax him that information. He also stated that he felt the lateral bracing was not adequately addressed and would submit the requirements for the trusses and would need to do a field verification inspection as a condition of his design review and approval before the city structural inspector would do a final inspection. I told him if that was a condition of his report to the building department it was noted in the permit that all requirements of the structural engineers review and report required compliance as a condition of final inspection and approval by this department. He wondered if the contractor could start the project befor I received the full report. I told him to submit a signed letter on hids company letterhead with his stamp on same that he had reviewed the project and that he felt comfortable with the contractor proceeding based on his description and approval while the formal report was being prepared. I told him I would need final instruction for lateral bracing, connections, bearing, etc., prior to the inspector doing a framing inspection so the requirements could be verified. As long as we work together and get everything handled before the car wash open up for business again and has a Certificate of Occupancy prior to opening we will allow the permit to be issued for the work.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/28/1998 | | PASS |
|
|
|
|
Meeting | | | 4/28/1998 | | PASS |
|
|
|
Received copy of preliminary letter from Dave Jakovac, FDJ Engineering concerning his findings and attached them to the plan.
|
Received Certificate of Value | | | 4/28/1998 | | PASS |
|
|
|
Received certificate of value from contractor along with application.
|
Application received | | | 4/28/1998 | | PASS |
|
|
|
Received application from contractor.
|
Print Pending Permit.LaserJet4 | | | 4/28/1998 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/28/1998 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/28/1998 | | |
|
|
|
|
Meeting | | | 4/24/1998 | | |
|
|
|
Met with Kenny Kuehl to discuss the scope of the project. Gave him an application to fill out and ask him to provide a copy of the structural engineering evaluation on the damage caused by the fire - what has to be removed and what is okay to reuse.
|
Application received | | | 4/24/1998 | | |
|
|
|
|
Plan Reviewer's activity | | | 4/24/1998 | | |
|
|
|
04/24/98 Received copy of plans on file from Kenny Kuehl, contractor with list of work that is proposed. The roof structure has been burned off of the car wash as a result of a car that was on fire being driven into the car wash bay in an attempt to put out the fire. I told Mr. Kuehl that I would need a structural engineers report on the current structural status of the building before a permit could be issued for the repairs. I would also need an application filled out. Mr. Kuehl said he would give the information to Max Miller, his project forman to gather the information and submit for permit. 04/27/98 Called Max Miller to check status of needed information. Left message on voice mail to call me. 04/28/98 Called Max Miller 7 A.M. Max said that the structural engineer needed to evaluate the connections for the beams before he could complete his report. Max was going to the site this morning to expose the connections and review with engineer. Max thought the office clerk had the application form and he would get it filled out to return, probably this P.M. Waiting for Certificate of Value.
|