INSP - Grading Inspection | 6/16/1999 | | 6/16/1999 | | PASS |
Rita DeYoung
|
|
|
Fine grading and revegetation are complete. $500.00 surety can be released.
|
INSP - Final | 3/31/1999 | 3/31/1999 | 3/31/1999 | P | PASS |
Wes Worcester
|
|
|
03/31/99 342 - Final, reinspect - John, ###-#### Cathy issued c/c
|
INSP - Grading Inspection | 3/31/1999 | | 3/31/1999 | | BOND |
Rita DeYoung
|
|
|
Rough grading is complete, final grading and revegetation are not. Engineer has recommended a $500.00 surety to ensure the satisfactory completion of the unfinished work. Upon receipt of this surety the grading is conditionally approved.
|
Letter of compliance | | | 3/31/1999 | | PASS |
|
|
|
Letter of Compliance #16540 issued 3-31-99.
|
INSP - Final | 3/29/1999 | 3/30/1999 | 3/30/1999 | A | FAIL |
Wes Worcester
|
|
|
03/30/99 342 - ###-#### NEED PUBLIC WKS AND BONDING AS REQUIRED
|
INSP - Final | 3/29/1999 | 3/29/1999 | 3/29/1999 | P | FAIL |
Russ Owen
|
|
|
03/29/99 407 - need mechanical and has deck needs guardrail and address.
|
INSP - Final | 3/26/1999 | 3/26/1999 | 3/26/1999 | P | FAIL |
Russ Owen
|
|
|
not ready./r###-#### eric
|
INSP - Final | 3/26/1999 | 3/26/1999 | 3/26/1999 | | FAIL |
Russ Owen
|
|
|
03/26/99 407 - not ready.
|
INSP - Energy code compliance | 1/22/1999 | 1/25/1999 | 1/25/1999 | P | PASS |
Wes Worcester
|
|
|
01/25/99 342 - john ###-#### mible energy code insp
|
INSP - Energy code compliance | 1/21/1999 | 1/22/1999 | 1/22/1999 | P | FAIL |
Wes Worcester
|
|
|
01/22/99 342 - JOHN ###-#### STILL NOT DONE, 3RD TIME NOT READY...
|
INSP - Framing/Rough-in | 1/20/1999 | 1/21/1999 | 1/21/1999 | A | PART |
Wes Worcester
|
|
|
01/21/99 342 - john- ###-#### cell # fr insp nail strap micro beam pocke
|
INSP - Framing/Rough-in | 1/15/1999 | 1/19/1999 | 1/19/1999 | A | FAIL |
Wes Worcester
|
|
|
01/19/99 342 - JOHN- ###-#### CELL FR INSP truss eng, approved plan, pt
|
INSP - Foundation | 10/30/1998 | 11/2/1998 | 11/2/1998 | A | PASS |
Wes Worcester
|
|
|
11/02/98 342 - JOHN SEIDEL- ###-#### FT INSP
|
INSP - Foundation | 10/26/1998 | 10/26/1998 | 10/26/1998 | P | PART |
Wes Worcester
|
|
|
10/26/98 342 - john ###-#### as soon as possible pouring...that that was unknown condition for all major ftgs
|
INSP - Foundation | 10/22/1998 | 10/23/1998 | 10/23/1998 | P | FAIL |
Wes Worcester
|
|
|
10/22/98 342 - JOHN ###-#### need eng ltr, rebar tied in place, 2nd trip
|
INSP - Foundation | 10/21/1998 | 10/22/1998 | 10/22/1998 | P | FAIL |
Wes Worcester
|
|
|
10/22/98 342 - JOHN-###-#### FT INSP no answer, need plan, eng, and reba
|
Receive PAYMENT IN FULL PRINT | | | 10/5/1998 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/5/1998 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/5/1998 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/5/1998 | | |
|
|
|
|
(F) Reprint permit | | | 10/5/1998 | | |
|
|
|
|
Routing - PLANNING | 9/30/1998 | | 9/30/1998 | | PASS |
|
|
|
reviewing a second time because of change in grading. the applicant changed the grading (increased fill) because of the City's removal of fill restriction on subdivision plat. the restriction was removed and planning staff approved a staff-level hillside permit, CFH98-22. the decision was appealed and then the appeal was withdrawn (see CFH98-22 for more info.). - m.hall.
|
Telephone call | | | 9/30/1998 | | |
|
|
|
phoned permit ready
|
Inspection Record Card- Bld | | | 9/30/1998 | | |
|
|
|
|
Plan Reviewer's activity | | | 9/29/1998 | | PASS |
|
|
|
PLANS READY TO ISSUE. MIKE HALL HAS PLANS AND AFTER REVIEWING WILL SIGN OFF.
|
Telephone call | | | 9/22/1998 | | |
|
|
|
talked to sara and she said the building may not take place due to neighbor appeals
|
Print Pending Permit.LaserJet4 | | | 9/14/1998 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/14/1998 | | PASS |
|
|
|
|
Telephone call | | | 9/14/1998 | | PASS |
|
|
|
roof frame info. rec. meeting with john seidl. called out holdowns at garage and kitchen. bmc west has provided calcs for deck type floor joist. deck area will meet req. of chapter 14 & 15. living room bay still requires eng. for lateral bracing. beams thru living room area sized by bmc west (travis mcfate)
|
CHANGE STATUS TO (R) | | | 9/14/1998 | | PASS |
|
|
|
Review and approval by DJO.
|
Plan Reviewer's activity | | | 9/14/1998 | | PEND |
|
|
|
PLANS WERE READY TO ISSUE, BUT DUE TO A LAST MINUTE APPEAL BY NEIGHBOR ,PROJECT HAS BEEN PUT ON HOLD AGAIN.
|
Plan assigned to (DJO) | 4/29/1998 | | 9/14/1998 | | PASS |
Dan Overy
|
|
|
09/14/98 10:29:12 DJO - this action updated by action script from <<>> in Case No. BLD98-1192
|
Routing - PUBLIC WORKS GRADING | 8/31/1998 | | 8/31/1998 | | PASS |
Rita DeYoung
|
|
|
Approved revised grading plan that has 7 feet of fill under the driveway. Driveway and garage are much better design.
|
Plans ACCEPTED BY PLAN CHECK | | | 6/2/1998 | | PEND |
|
|
|
|
Plan Reviewer's activity | | | 6/2/1998 | | PEND |
|
|
|
CALLED CONTRACTOR LEFT MESSAGE. ENG. REQ. FOR WALL BRACINIG. NEED ROOF FRAME DETAILS, ELECTRICAL SHEETS AND OTHER INFORMATION.
|
Routing - PLANNING | 5/4/1998 | | 5/11/1998 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 4/29/1998 | | 5/4/1998 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 5/1/1998 | | 5/1/1998 | | PASS |
Rita DeYoung
|
|
|
Approved as category 3.
|
Application received | | | 4/29/1998 | | |
|
|
|
|
Routing - PLAN CHECK | 5/12/1998 | | | | PEND |
|
|
|
|