Permit Information
Permit NumberBLD98-01291
StatusFinaled
Name MARV PETERSON
Site Address 9101 W FAIRVIEW AVE
Project NamePETERS0N MOTORS
Customer Number 
ePlanReviewNo
Description
PETERSON MOTORS SHOWROOM * TO BUILD A NEW 4000 SQ FT SHOWROOM AND OFFICE ADDITION TO THE NORTHWEST CORNER OF THE EXISTING AUTO DEALERSHIP. THE ADDITIONS WILL INCLUDE AN OFFICE ON THE SOUTH SIDE. Construction is a "pre-engineered" steel building with fire sprinkler system throughout. DRH98-0025 PC#296-98 ads
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 4/8/19994/8/1999 DONE
Details
INSP - Final4/8/19994/8/19994/8/1999 PASS
DetailsCarl Dependahl
/ / 340 - OK FOR PERM C/O, CARD TO CONT.
INSP - Final4/8/19994/8/19994/8/1999PPASS
DetailsJoe Tawney
04/08/99 406 - PERMIT WAS SIGNED OFF PERM 3/25/99
Permanent occupancy  4/8/1999 PASS
Perm. Occ. Cert. #7728 issued 4-8-99 to Peterson Motors for a showroom & ofc. addn.
INSP-Final Inspection3/25/19993/25/19993/25/1999PPASS
DetailsJoe Tawney
03/25/99 406 - REINSP OK FOR PERM OCC OR CERT OF COMPLETION
Code Occupancy Approval  2/8/1999 PASS
Charlie of CM Company requested Final (####-#### Voice Pager/###-####). Inspection revealed though the proj. was complete - they did not construct according to approved plans DRH98-0025. I advised Charlie to have architect provide "As Built Plans" to Tempra Wilson Design Review Analyst and see if they could get them approved. The proj. as built is actually a better design and provides better traffic flow - but, unfortunately was not approved as such. Contacted Tempra Wilson who responded bvy E-Mail 2/8/99 - Filed plans - O.k.
INSP - Final9/30/19989/30/19989/30/1998PPART
Details
09/30/98 338 - made ok for the temp occ cert
Temporary occupancy  9/30/1998 PASS
Temp. Occ. Cert. #3707 issued 9-30-98 to Peterson Motors.
INSP - Final9/29/19989/29/19989/29/1998 PART
DetailsJoe Tawney
/ / 406 - REINSP OK FOR TEMP OCC OF SHOWROOM NO OCC OF REAR AREA
INSP-Sprinkler Rough-in/Hydro9/28/19989/28/19989/28/1998PNR
DetailsJoe Tawney
09/28/98 406 - CHARLIE ###-#### REINSP NOT READY COULD NOT TEST DUCT DET
INSP-Final Inspection9/24/19989/25/19989/25/1998AFAIL
DetailsRick Jackson
jeff ###-#### install remote LED's for duct detectors
INSP-Sprinkler Rough-in/Hydro9/18/19989/18/19989/18/1998 PART
DetailsJoe Tawney
/ / 406 - OK ON HYDRO TEST OF SPKLR ADDITION
INSP-Conference9/17/19989/17/19989/17/1998 PART
DetailsJoe Tawney
/ / 406 - PROFIT MEETING ON NEW SHOWROOM PERRY, PAT, AND ME
INSP - Framing/Rough-in9/8/19989/9/19989/9/1998APART
Details
09/09/98 338 - ceiling grid made ok told elec. to tighten up the wraps o
INSP-Sprinkler Rough-in/Hydro9/8/19989/9/19989/9/1998PPART
DetailsJoe Tawney
09/09/98 406 - JEFF ###-#### OK ON ROUGH IN OF SHOWROOM OK TO COVER ì
INSP - Framing/Rough-in8/20/19988/21/19988/20/1998APART
Details
08/21/98 338 - BRIAN ###-#### MADE OK TO COVER WITH SP INSP AND ELE APPR
INSP - Framing/Rough-in8/17/19988/17/19988/17/1998PPART
Details
08/17/98 338 - made ok to cover sofit as the sp insp is completed for th
INSP - Framing/Rough-in7/23/19987/24/19987/24/1998PPART
Details
07/24/98 338 - MADE OK WITH SP INSP APPROVAL
INSP - Framing/Rough-in7/22/19987/23/19987/23/1998PPART
Details
07/23/98 338 - made ok with sp insp approval
INSP - Framing/Rough-in7/16/19987/17/19987/17/1998APART
Details
07/17/98 338 - made ok with sp insp approval
INSP - Framing/Rough-in7/17/19987/17/19987/17/1998 PART
Details
07/17/98 338 - madeok with sp insp approval
INSP - Framing/Rough-in7/15/19987/15/19987/16/1998PPART
Details
07/16/98 338 - made ok to pour with sp insp approval
INSP - Foundation7/13/19987/13/19987/13/1998PPART
Details
07/13/98 338 - mad ok for part footings ok to pour witrh sp insp blessin
INSP - Foundation7/9/19987/10/19987/10/1998APART
Details
07/10/98 338 - BRYAN ###-#### done by 342 passed with corrections in his
Telephone call  6/11/1998 PASS
TALKED TO DAVID MOE ###-#### THAT PLANS ARE READY
Issue PAID IN FULL permit  6/11/1998
Print Occupancy Form  6/10/1998
PLANS/APPL TAKEN TO FRONT DESK  6/10/1998 PASS
Inspection Record Card- Bld  6/10/1998
Routing - PLAN CHECK5/22/1998 6/10/1998 PASS
Plan assigned to (ADS)5/12/1998 6/10/1998 PASS
Details
Plan resubmittals received  6/9/1998
received responses to structural plan review.
Routing Off Site - STRUCTURAL5/12/1998 6/9/1998
SENT TO CH2MHILL RECEIVED REPLY FROM HOWIE. RESUBS REQUIRED TO US OR HOWIE, OUR CALL.
Plan resubmittals received  5/29/1998
ceiling design for lateral loads
Plan resubmittals requested  5/29/1998 FAIL
faxed initial nonstructural review report to architect and applicant - need ceiling bracing detail. I spoke to Wes Edwards (architect) on the phone after he recieved the fax.
Routing - FIRE5/19/1998 5/22/1998 PASS
Routing - PLAN CHECK5/18/1998 5/19/1998 FAIL
pending structural review, fire dept. approval. Seismic design for ceiling needed.
Routing - PLANNING5/14/1998 5/14/1998 PASS
DRH98-0025
Routing - PUBLIC WORKS5/12/1998 5/14/1998 PASS
Plan assigned to (MYS)5/7/1998 5/12/1998 PASS
DetailsMarlene Southard
Application received  5/7/1998
Recd Pcfee & Taken To Pln CK  5/7/1998 PEND
Routing - PLAN CHECK5/7/1998   PEND